This will basicly give People ideas When the the M17x-R2 to be be getting there Machine. Most of us know it will be February. To find out click on this website. Please PM me if they change Support options.
https://support.dell.com/support/order/status.aspx?c=us&cs=19&l=en&s=dhs
Suggested by Rengsey R. H. Jr.
1)Call 1-800-283-2210 (dell update phone options)
2)Follow prompt wait #3 Then it will ask your order number or #4 and do the steps below but for me they still say the same thing.
3)Now, select business/epp selection #2
4)Track order option #1
5)Then do it again - track order option #1
If you all can give your system spec. We might be able to find which ones seem to slow down ordering. I added this Tread Parts reported on back-order - what have YOU been told? Url listed below
http://forum.notebookreview.com/showthread.php?t=459030
Please Note 1.2TB Raid 1 (2x 640GB 7,200RPM) they are not 7,200 rpm. They are 5,400 rpm dont be fooled. But when I get my ssd drive I have a good backup hard drives.
Mine is listed here
Nebula Red - Special Edition - Anodized Aluminum
Intel Core i7 720QM 1.6GHz (2.8 GHz Turbo Mode, 6MB Cache)
8GB Dual Channel DDR3 at 1333MHz
Alienware M17x 240W A/C Adapter
17-inch WideUXGA 1920 x 1200 RGB LED (1200p)
Dual 1GB ATI Radeon Mobility HD 4870 in CrossfireX
1.2TB Raid 0 (2x 640GB 5,400RPM)
Order On 1/19/09 Shipping on 2/5/2010 Cancel due to DVD drive
Reordered on 2/02/2010 Shipping on 2/05/2010
Updated on 2/08/2010 Updated on 2/24/2010 3/09/2010
About dang time I have a system lol.
Order Status: Been playing Lotro.
Shesh it about time I got the system.
Crosses Fingers
-
-
Ok, well:
System 1:
Order Date: 1/14/2010
Order Status: In Production
i820 | 4gb ddr3 | 1200p rgb led | 4870 xfire | 1 TB raid 0 | intel 6300. ETA: 2/3/10 and currently in day 10 of build status.
System 2:
Order Date: 1/22/2010
Order Status: In Production
i920xm | 4gb ddr3 | 1200p rgb led | 4870 xfire | 500 gb 7200 rpm | intel 6300. ETA: 2/16/10 and currently in day 2 of building.
I don't think either system will make it's ETA. -
Joker...WHY did you buy two systems?
Do you plan on benching two at once or playing two games at once?
Or is one for someone else?
Sorry, just wondering -
Probably for his girl friend or something.
-
I think he probably just got a great deal that he couldn't pass up
Sounds like something I should have done
-
Everyone I am trying find out when the system is sent out not how or why. Basicly who or when the system will be sent out. So we can see when the review of the new system.
I am trying to be basic here. What I see is feb 2. to feb 8.
This give new users time to look understand and choice. -
I've seen these threads done in the past when some people were getting their systems and others were not and they were trying to find out what part is delaying the order. It hasn't come to that yet. Knowing everyone's ETA should be enough.
Regardless the only difference between my two systems is one has 4GB 1333 memory and the other has 1066 memory.
i920-XM
320GBx2
DL DVD burner
4870x2
Intel 6300
RGBLED
ETA #1 2-2, ETA #2 2-17 -
Rengsey R. H. Jr. I Never Slept
Eta 02::12::2010
-
SillyHoney Headphone Enthusiast
-
hahaha, now thats the spirit! If it wasn't such a pain to get it out here and back to Dell, I'd be up for it too.
-
-
Rengsey R. H. Jr. I Never Slept
-
I ordered mine on Jan 22 and the estimated delivery is Feb 17.
I got a question, I remember someone posting a link somewhere around the Alienware section that would give you a detailed production stage on your order, been searching but can't find it, I did find a phone number to do it tho... If any of you know has the link for that could you share it?
Thanks. -
SillyHoney Headphone Enthusiast
Back to the topic, it seems Dell is delaying orders again right?
I remember by the time I ordered my R1 there are massive amount of people got delay for weeks and even months. After that time it took only a week or two from order date to EDD.
Rengsey, when did you place your order? You look like to be the first to get the R2.
Edit: No, Joker will be the first one on 3rd Feb. -
Rengsey R. H. Jr. I Never Slept
* fingers cross * -
SillyHoney Headphone Enthusiast
How do you guys get your orders expedited? When I ordered my system I wrote Dell an email kindly requested them to expedite my order for several good reasons but they answered me that all orders are treated equally and there is no way for me to get it sooner
-
Rengsey R. H. Jr. I Never Slept
-
If Mandrake's comes in on 2/2 he'll be the first to have it, mine comes a day later. Expediting won't happen because we tried already, they said there's a huge backlog and they aren't taking any expedite requests. If there is a part shortage, my guess would be the RGB LED since Dell had a shortage recently for M6500 orders (some people had to wait two months).
-
order date 1/18
ETA: 2/5 -
Speedy Gonzalez Xtreme Notebook Speeder!
my order ETA. is 2-12 but is regular 5 days shipping since i live next to texas regular shipping is 1 or 2 days that was with my last orders at least, i hope i can get it 3 days before the ETA,
-
Rengsey R. H. Jr. I Never Slept
Got an e-mail from my res. specialist , and there are heavy backlog with the and he cannot push it through. He did got me a next business day delivery.
-
Order date: 1/14/10
ETA: 2/1/10
However, my order is still in the build phase last I checked, so I'm not holding my breath. -
Nebula Red - Special Edition - Anodized Aluminum
Intel Core i7 920XM 2.0GHz (3.2 GHz Turbo Mode, 8MB Cache)
4GB Dual Channel DDR3 at 1066MHz
Alienware M17x 240W A/C Adapter
17-inch WideUXGA 1920 x 1200 RGB LED (1200p)
Dual 1GB ATI Radeon Mobility HD 4870 in CrossfireX
1TB Raid 0 (2x 500GB 7,200RPM)
Order Date: 1/17/2010
Order Status: In Production
Estimated Delivery Date: 2/5/2010 -
Order date : 20/1/10
ETA : 8/2/10
I can't wait -
Order 1/20
ETA 2/16 -
You guys should check your orders. Mine got canceled!
Order Date: 1/14/2010
Order Status: Canceled -
Mine is still in production, but your cancellation is worrying news...
Is this the start of the avalanche? -
Ordered mine 1/21.
ETA on site says 2/9, was informed 2/5.
Did it say why yours was canceled joker?
Also, Rengsey, I was going to get the 6 gig of ram, but noticed that it wasn't dual channel, as I don't think they make a 3 gig stick yet, so it will be a 4 gig and a 2 gig stick single channel. Just a FYI. -
Rengsey R. H. Jr. I Never Slept
-
-
It was my first order guys and it got canceled because of my rep. The lady I spoke to on the phone doesn't know why he canceled it and placed another order. She asked me if I wanted to wait for the new one to go through but I didn't bother since I already have the one in my signature that's still in production. Just e-mail your reps and find out if there's any part shortages because I wasn't able to get a clear answer for why mine was canceled by my rep.
-
I emailed mine today for an update and he didn't respond. I hope he just wasn't in. He's usually good at replying.
-
I actually got mine through the Dell epp program, because at the time I didn't realize that these notebooks were just released, and was asking if they gave a student discount on the m17x with core i7.
Turns out no, but I got a decent deal regardless. Even though my rep. kept saying it was through dell home services.
What department did you guys get yours through? -
Dell EPP with 10% + 5% instant off coupon + 3% DPA.
-
1-800-283-2210, options 3 2 1 1
I've yet to hear anything beyond "Production" myself. -
RE-Order Date: 1/20/2010
Order Status: In Production
Estimated Delivery Date: 2/5/2010
(canceled original order to get RGB LED screen and EPP discount) -
order date: 1/22
eta: 2/19
space black anodized aluminum
intel core i7 820QM
4gb dual channel ddr3 @ 1333
17" 1920x1200 rgb led
dual 1gb 4870 in crossfire
640 gb raid 0
1 year advanced warranty
how are yall finding what day or production it is in? -
mine was just canceled too i don t know why
-
And here we go, cancellation #2. So are we making this the official order status thread for the R2? So take your bets, who will be the next one canceled? If i had to guess as to why, it would be either: 1. they're out of 4870s due to EOL 2. RGB LED shortage (most likely). -
Starting to seem that way.
-
im still in production.
-
weddingvideos4u Notebook Consultant
my order was cancelled today
m17x r1
qx9300.4gb 1333mhz, dual 4870, blueray burner, win 7 64 ultra, 1920x1200 lcd -
Since yours is an R1, the two things our orders had in common were the 4870s and 1333 mhz ram. If it is indeed the 4870s going EOL, maybe we'll all get upgraded to 5870s? If my latest order gets canceled, I'm going to fight to have it re-ordered at the same price w/5870s. -
weddingvideos4u Notebook Consultant
Dear Customer,
Your Dell order [#######] has been cancelled
Because of a problem with the combination of components we cannot complete the order.
Please contact your sales person to place a new order or to arrange a refund.
Thanks,
Dell -
-
my first order is 1066 and second one is 1333. Both orders still there.
-
So they told me
its just an internal code which needs to be refreshed and that s why they canceled my order
they must be kidding -
An internal code? What kind of bs is that? -
Had me worried with this cancellation stuff, I just checked online and it says is still in production, I also dialed the 1-800 number and also says in production "build" stage... I'll be checking daily.
-
weddingvideos4u Notebook Consultant
I had a 2hr phone call with a senior manager in tech support on saturday, I ended up buying an area51 desktop.
I also talked at length about trying to get an r2 insted of the r1.
I got the impression that it would be a long wait and there was some sort of reason nobody has been shipped any yet.
I'm sorry i cant be clearer but it was kind of we can sort out getting the r1 changed to a r2 but it maybe a long wait before i would receive it and there was a problem behind the delays?
Its very late in UK 2am and its difficult to describe, this is all based on a feeling, but there was deffinetley a reason behind the hold up
List everyone M17x-R2 ETA
Discussion in 'Alienware' started by AtolSammeek, Jan 24, 2010.