After 5 great years with my Area 51-m, a successor has been ordered...
My companion has been around the world with me many times, and never missed a beat or let me down. It has no doubt grown a bit long in the tooth, and it's time to move on. I have had a great experience with my first alienware, and am looking forward to 5 more years with the m9750.
Memory and hard drives are on the way, can't wait till June 4th!
Area-51® m9750
Processor: Intel® Core 2 Duo Processor T7200 2.0GHz 4MB Cache 667MHz FSB
Operating System: Genuine Windows® XP Professional
Chassis: 17" WideUXGA 1920 x 1200 LCD with Clearview Technology - Stealth Black
Memory: 1GB Dual Channel DDR2 SO-DIMM at 667MHz - 2 x 512MB
System Drive: 80GB Serial ATA 1.5Gb/s 5,400 RPM w/ NCQ & 8MB Cache
Primary CD ROM/DVD ROM: 8x Dual Layer CD RW/DVD±RW
Video/Graphics Card: 512MB NVidia® GeForce7950 GTX
Wireless Network Card: Internal Intel® Wireless 4965 a/b/g/Draft-N Mini-Card
-
that looks pretty sweet
plenty of gaming is going to get done i assume?
-
sweet!!!!!!!!!
enjoy -
Charles P. Jefferies Lead Moderator Super Moderator
Beautiful machine, and congratulations. I'm glad to see that you had a great experience with your first Alienware and wish you all the best with the second.
-
Thanks guys,
I will share my first impressions, when Santa shows in the big brown truck! -
Man, I wish I could get one of these. Enjoy your purchases guys, and good luck!
-
big_greasy_taco Notebook Geek NBR Reviewer
Aren't they usually a fedex? -
Did you recieve your 9700 yet? Anxious to hear what you think!
And yes this machine will not go to waste -
AlexOnFyre Needs to get back to work NBR Reviewer
wow, congrats guys! I almost got the same model, but I really need that extra money for school =). I can't wait to hear what you think!
-
congrats... I am dying to get my hands on one of those...
-
Nice... Congrats... What phase are you on?
And does anyone one for sure what kind of RAM the m9750 takes? Thanks -
Ummm.... I believe it would be PC25300. DDR2. Which means that both memory modules have to match.
-
Charles P. Jefferies Lead Moderator Super Moderator
-
Yea i just ordered my m9750 too and it says will be shipped june 4th. I got the same configuration as you too but with sli graphics. Im hoping they get this thing built before june 4th. Im on phase 3 going to 4 last time i checked, how about you?
-
Correct Audiose, 200-Pin DDR2 SO-DIMM DDR2 667 (PC2 5300).
Does anyone have and opinion on memory amount? I am going to get a minimum of 2gb dual channel memory, which seems reasonably priced. 4gb kits are 2.5 times as much!I would think 2 gigs is enough???
Future plans are to maybe upgrade to a faster processor and a second 7950GTX down the road.
I already have ordered 2 120gb Seagate Momentus 7200.2 Hard Drives. -
HaloGod2007,
Mine has been in phase 4 since last week. I was hoping to get it before the 4th, but not sure I will. I leave for Houston on the 4th for a month, and was hoping to get some seat time on the road! I will have to reroute the shipping if it doesn't make it.
I had a really hard time paying $600 bucks for the second card, hell this thing is faster than my desktop! I hope I can get one from AW down the road before they stop using them. I think even without the second card, it should be a fast well balanced system. Good luck with yours, anxious to hear what ya think -
Yes you will be able to add another graphics card later. Also, they will have better cards in the future that you can add too. You can add and remove the cards by yourself with no tools required( thats what the alienware tech told me). So it should last a very long time. Also for RAM, 2GB will ne enough, in the future though you may need to add another gig if you will be doing hardcore gaming. Let me know when you order hits the next phase. And by the way, dont look online for what phase you are on because they said its very delayed, im in phase 4 but online it says phase 2, so call them to check it out. goodluck, hope you get it soon
If you wanna add more ram, go to www.newegg.com, great deals on that kind of ram -
I swear by New Egg, they have never failed me. -
Im becoming very impatient with alienware(im a very impatient person, oh well). Ive been stuck on phase 3 for 3 days now. They say june 4th is the latest it will ship but i got a feeling im not gonna get this laptop for a very long time.
-
I am sorry. I know how you feel though.
-
Charles P. Jefferies Lead Moderator Super Moderator
Those Phases on Alienware's site are not that accurate, so don't take them that seriously.
Just give your laptop a bit of time.From what I have seen and experienced, it usually takes about 2 weeks for a custom notebook to be delivered after you place the order.
-
Just to let everyone know, the support at alienware just told me that all m9750 orders will be delayed for shipment till the end of june, im about to start crying because i was expecting it june 4th. They said the best case scenario will be shipment in mid june, but unlikely. What a crock.
-
Charles P. Jefferies Lead Moderator Super Moderator
That is disappointing although I can't say I find it surprising. I wonder what the delay is.
-
They have a very high demand for the laptop, and are smashed with orders in the manufacturing queue line.
-
End of June, Ouch!!!
Looks like I'll have to dust of the Area-51m one more time and hope it doesn't melt. Playing Fear was threatening to start a fire in my hotel room last month.
Well in the long run it will be worth the wait. -
yes and i just found out they will be releasing direct x 10 cards for the 9750 this summer, something im gonna upgrade in another year or so, the 7950 GTX is insane as it is. Thats why i went with one vid card, so i can sli two direct x 10 cards. The card is the 8600m.
-
I went with one also. But I will wait for something better than the 8600m. When DX10 games become enticing, I will have to make the switch. Same with Vista...Hope this won't be a problem with this chassis, 2 DX10 cards that is...
I'm waitin till July with ya...
I feel your pain... -
LOL, lets get through this together, we can do it! Hopefully since im annoying them everyday about it, they will just get mine done with lol. Yea i wonder if it can handle dx10 sli......the tech support told me that there will definetly be upgrades for the laptop's graphics in the future for dx10, if they leave out sli, what the heck is the point?
-
I just got an email from alienware saying that the case/screen and proccesor (2GHz) for my m9750 are back ordered till next week. When I called, i was told the same thing about the video card.
Isn't waiting for a new PC fun?
The e-mail:
"Dear (Me),
There will be a slight delay in your Alienware order, because the part(s) listed below are temporarily backordered. We apologize for any inconvenience this may cause, and assure you that we are doing everything in our power to expedite the process of obtaining the part(s). Once the part(s) have been obtained, your order will be processed.
1- AREA-51M 9750 17" WUXGA W/ CAM BLACK ........................ Expected Date: 5/28/2007
2- N- CORE 2 DUO 2.00GHZ T7200 4MB 667MHZ ...................... Expected Date: 5/29/2007
If you have any questions regarding your order, please do not hesitate to contact our sales department by replying to this e-mail.
Thank you for choosing Alienware." -
Oh yes. I upgraded my computer, and had to wait for parts on "backorder" that they told me on the phone were in stock. They actually sent the computer back without the upgrades and I had to send it back to get them installed. Needless to say... annoying. But performance-wise... this is awesome!
-
When did you order your m9750 mjl? If they tell me that im gonna fly down to florida and slap them because they keep telling me not to worry and that everything will go as planned for june 4 th shipment, even though some told me that i wont get it till june 28......i better get it june 4th, with how much we are paying....give us a break.
-
I hope you do get it on June 4, but don't hold your breathI paid over $5.3K including tax & shipping for mine and still stuck in Phase 4
-
Charles P. Jefferies Lead Moderator Super Moderator
Alienware had the T7200s backordered before too, it's a very popular CPU.
You could probably get something for free out of your extended delivery date . . . tell them that you're going to cancel since your ship date was delayed by almost a month and see what happens. -
I only ordered on 5/4/07, so the delay is kind of expected, since the computers not even not their main site yet.
I find it odd that on the phone they say the graphics card is back ordered, then email me to say that the case and processor are back ordered less than 24 hours later...
The guy on the phone suggested calling them on Tuesday to see if they started building, but now that their only just getting the processor then, I doubt it.
How did you find out it may be the 28th HaloGod2007? The person on the phone didn't give an answer more specific than "4 or 5 days after they start building".
It still should be worth the wait -
well they dont want to tell you it will be delayed, but i bothered them to the point where the lady, who now knows me well, just said there is a good chance you wont get it till end of june, around the 28th, im gonna tell them i will cancel because of this delay so that maybe i can get something out of it.....i ordered mine on 5/21 so i may be in bigger trouble than you lol. Again, im rediculously impatient. And yes, it will 110% be worth the wait.
By the way, whats everyones setup on their 9750? -
Alienware m9750:
Intel Core 2 Duo T7200 2.0GHz processor
WUXGA 1920x1200 screen
1 GB RAM (Waiting to get computer before buying more)
80 GB Hard Drive (Same as above note)
1 Ge force Go 7950GTX
8x DVD Burner
Vista Home Premium -
Area 51 m7950
Processor: Intel® Core 2 Duo Processor T7600 2.33GHz 4MB Cache 667MHz FSB
Operating System (Office software not included): Genuine Windows® Vista Ultimate - Without Remote Control or TV Tuner
Chassis: 17" WideUXGA 1920 x 1200 LCD with Clearview Technology - Stealth Black
Memory: 2GB Dual Channel DDR2 SO-DIMM at 667MHz - 2 x 1024MB
System Drive: Extreme Performance (RAID 0) - 320GB (160GB x 2) Serial ATA 1.5Gb/s 7,200 RPM w/ 8MB Cache
Primary CD ROM/DVD ROM: 8x Dual Layer CD-RW/DVD±RW w/ Nero Software
Video/Graphics Card: Dual 512MB NVidia® GeForce Go 7950 GTX - SLI Enabled
Wireless Network Card: Internal Intel® Wireless 4965 a/b/g/Draft-N Mini-Card
Sound Card: High-Definition Audio with surround sound
Warranty: 3-Year AlienCare Toll-Free 24/7 Phone Support w/ Onsite Service
Alienware Extras: Alienware® Mesh Cap
Alienware Extras: Alienware® Mousepad
Alienware Extras: AlienInspection - Exclusive Integration and Inspection - $100 Value - FREE! -
Nice setups, i couldnt go over 2800 so sli has to wait, hopefully i can still play todays games at full settings.
-
Intel core 2 duo 2.0Ghz
1gb dual channel 667MHz (2gb crucial or patriot on order)
512mb NVidia geforce go GTX
80gb (will upgrade to raid 0 with another 80gb)
17" Wide UXGA 1920x1280 w/ clearview
8x Dual Layer CD-RW/DVD±RW
Total: $2673.38
Halogod, I'm assuming your upgrading the HD and ram yourself right? Your total should be over 3k if u order those parts from AW
Btw, I'm also considered either a 7500 C2D Desktop or a Superman laptop also... (they are priced at 1199.00 now) -
Yea the HD and RAM i already have, my broken down laptop has the same ram and its got 2-1GB sticks in it. The HD im putting in is a 120GB 7200rpm ata. Dont know if that good enough, but i dont need alot of storage, all i will do is game in my dorm and do some homework(programming).
So when did you order Bryan and how is it coming along?
Also, if your considering the superman laptop over the m9750, performance will not be comparable, the m9750 will also last you a lot longer(it will even support future direct x 10 cards in sli configuration).
Desktop? if you will never want a small portable gaming machine, then there is no need for a laptop, im always on the go and alwys going to dormroom lan parties, so thats why i got a laptop, plus its amazing to take a laptop places knowing you blow away most desktops -
Gonna be quite a machine Halo, bet the lan parties are something
I am seriously considering having AW put in a second GPU while I wait, this would tide me over for a while gaming at home on the big LCD. Maybe I can go another year before upgrading the desktop??? TV is 1920x1080, and my desktop is also starting to show its age $600 is hard to swallow, knowing what I could put in the desktop for that. OUCH!!! -
i would just save money to do a sli setup with directX 10 GPU's around the end of 2007. One 7950GTX will be plenty for another year or so. Plus i wont get the first DX10 notebook GPU's that come out this summer, ill wait for better ones to comeout early 2008.
and a new update: AW told me today that the laptops should be shipped by june 4th, lastest june 6th. I think people who ordered a little later around 5/25(since this is the day they said orders will be delayed longer) will have to wait till late june early july. So we may be in luck, they said they will be able to tell me for sure this upcoming week -
The two times I called last week they told me to call back on Tuesday (5/29), and they should be buildng and can give me an update.
But then I got that email saying they would not have the processor tll then, I guess they probably wont' be. And I don't see how they plan on getting an order of parts on monday, since it's a holiday.
Oh well, maybe I'll get someting for free for the wait (Or for not calling to ask thm..LOL) -
Just hate to be on the road for a month with no gaming at night, might get a bit cranky! Hope to be spooning mine in early June!!!
-
hmm i didnt get an e-mail saying anything would be delayed, and they keep telling me im on schedule and to not worry. So if they all the sudden say it will be delayed, ill just bring up them telling me to basically stop calling and worrying lol. They told the CPU was in stock, dont know why they told you its not.....we all get different answers....guess tuesday is the day we all find out, if you get anymore updates lets post them up here.
as for upgrading, yea the tech said they are researching numerous GPU's for the m9700 and m9750 this year, so waiting is best. Also, nvidia has some options and "coming soons" for the 9750 on their website under the M series dx10 cards list for notebooks. check it out, since m9750 is new many cards still have not yet been put up but will have many soon. HP and acer already got dx10 cards out but they arent that great from what i hear.
click here and scroll down to the bottom of the site
http://www.nvidia.com/object/geforce_m_series.html -
well the superman laptop looks too much like a toy but for the money (and rarity) it does look tempting. My m9750 should ship around 7/5/07
I should have ordred this unit a few weeks ago to avoid this delay lol -
wait when did you order your m9750?
-
i placed my order yesterday afternoon. (8/26)
-
HaloGod2007, have you called alienware about the order, and did they mention anything about back ordered video cards?
-
Charles P. Jefferies Lead Moderator Super Moderator
Hey guys, would you like me to change the name of this thread to something like "M9750 owners thread" or "M9750 waiting thread"?
The Official M9750 Owners Lounge
Discussion in 'Alienware' started by Xplane, May 17, 2007.