The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.
Problems? See this thread at archive.org.

    Why I am starting to hate Alienware.

    Discussion in 'Alienware' started by Sequoia225, Dec 7, 2007.

  1. Sequoia225

    Sequoia225 Notebook Deity

    Reputations:
    109
    Messages:
    704
    Likes Received:
    0
    Trophy Points:
    30
    Because I first placed an order on August 1st for a 9750. Have had 2 machines returned, and now the 3rd I ordered has been delayed 2 times. Once for billing cause my ship address was different than CC address - though I bought 2 other 9750s before with the same info and no issues. Now my machine was supposed to ship on the 4th and its been stuck in phase 7 since then and still is. This is the testing phase. Ive been on the phone and spoke via email and they just say theres been a delay in production in the testing phase.

    Ive REALLY tried to be patient since my first order in August.

    I am not able to get any perks out of all my troubles cause I am purposefully trying to keep this order separate from the other 2 - for fear that they will use parts of my return to build the new - cause thats what it seemed like they did for the 2nd machine.

    Yes, Im paying less now for the system, but thats cause the system is older now. I would have wanted to wait for the new system - but I really dont like it. Nor can I find out how BIG it is. I wanted dimensions and though there was all those pictures and press things, no one seemed to just think to take some measurements.

    And I have no confidence that this 3rd machine will not do what the first 2 did. Its been over 4 months of me trying to buy a system that works. I have software bought for it all and Norton antivirus subscription thats 4 months in now and not being used.

    I will definately think twice before buying from this company again. I really like this system inside and out and thats why Im still trying......but its really getting rediculous at this point.

    I just want the damn computer already. I was told Id get it today when I paid for it and now its gonna be next Friday at the earliest.



    thank you for letting me vent.
     
  2. justanormalguy

    justanormalguy Notebook Consultant

    Reputations:
    117
    Messages:
    232
    Likes Received:
    0
    Trophy Points:
    30
    You're certainly welcome, and I'm sorry to hear you've had a bad experiance with a company...but !@#$ happens...

    Why don't you look in to sager laptops? (I have no idea what spex for laptop you got) but sager is generally cheaper than alienware for the same, if not equal specs. Plus they are made by the same company, and the 8800m GTX is out...so why not pick that up?
     
  3. Asylum

    Asylum Notebook Geek

    Reputations:
    2
    Messages:
    80
    Likes Received:
    0
    Trophy Points:
    15
    Mine was also delayed about 5 days. I think they are still backed up from Thanksgiving 2 weeks ago.
     
  4. Sequoia225

    Sequoia225 Notebook Deity

    Reputations:
    109
    Messages:
    704
    Likes Received:
    0
    Trophy Points:
    30
    ARRRRGGGHHHH.

    I just got the confirmation on the refund for my second 9750. Its 400 less than it should be. They said the laptop would be refunded at the FULL price. They better freaking fix this!!!!

    Thanks for the advice up there. I am giving them one more chance with my
    3rd order that is SUPPOSED to ship any day now. If this computer has the same problem as the first 2. I will NEVER buy from Alienware again.

    And if they dont get my refund correct on the second machine. Theres going to be a fight.


    GRRRRRRRRRR
     
  5. mjl2142

    mjl2142 Notebook Evangelist

    Reputations:
    16
    Messages:
    494
    Likes Received:
    0
    Trophy Points:
    30
    BBB complaint?
     
  6. lightning penguin

    lightning penguin Notebook Consultant

    Reputations:
    1
    Messages:
    133
    Likes Received:
    0
    Trophy Points:
    30
    I'm really sorry to hear that man. :(

    It must feel really heart-wrenching to have 2 laptops fail on you.
     
  7. Grey728

    Grey728 Notebook Evangelist

    Reputations:
    29
    Messages:
    424
    Likes Received:
    0
    Trophy Points:
    30
    yeah, I think I would have given up on the first bad one. I have to commend you for your patience!

    But honestly though, I just don't see another system out there in this form factor with a comparable feature set, so I guess you really have no choice. Those 12lb sagers (clevo900c?) look horrible ><

    Actually, now that the 8800m cards are coming out, you can have the power of two 7950 GTX cards in one card? That might be something worth considering if you need the power but not necessarily need SLi.
     
  8. Sequoia225

    Sequoia225 Notebook Deity

    Reputations:
    109
    Messages:
    704
    Likes Received:
    0
    Trophy Points:
    30
    Grey I agree with you. Theres just not another laptop I want. And I researched a ton, and I get very specific with what I want.

    I got the 7950 SLI. Im not a big gamer so its not that big of a deal either way. Both will be fine for the applications I want to run.

    Man I just HOPE it doesnt have the problem. And I have to wait till Monday probably for a response about that refund issue. I have NO idea why the guy didnt give me the whole refund. I have him in an email saying that the FULL amount will be refunded.
     
  9. Inkjammer

    Inkjammer Notebook Deity

    Reputations:
    205
    Messages:
    717
    Likes Received:
    0
    Trophy Points:
    30
    Hrmm. It could be possible Alienware hit you up with the restocking fee unintentionally. Unfortunately, communication between shops isn't always the best (this goes for any company).

    But having the e-mail gives you a papertrail, which is good!
     
  10. Rei86

    Rei86 Notebook Guru

    Reputations:
    6
    Messages:
    61
    Likes Received:
    0
    Trophy Points:
    15
    Because if you had bought a dell or a HP you would have had the same problems and still ***** about it. However the bigger problem is that you paid a bit more for a machine and expected it to be fine..

    To bad that computers have such a high rate of fail....well actually any electronic item that you buy will have high level of fail rate compared to anything you buy anyways.

    I hope they work something out with you and hope they'll give a nice refund or something in the form of a credit.
     
  11. Stone825

    Stone825 Notebook Virtuoso

    Reputations:
    404
    Messages:
    2,439
    Likes Received:
    0
    Trophy Points:
    55
    @Rei86 - the problem isn't that the computers have a high rate of failures in his case. The problem was that when they gave him the 2nd notebook, it was supposed to be new, but it seems like they just put the old parts into a new notebook to pass it off as a new one, which is why he is trying to make the 3rd order separate, so he doesn't have to deal with them doing that again.