Hi, there is XPS 17 (L702X) - Order Progress why not L502X Right. can you guys share your order date thanks.
Order Date: 4/9/2011
Order Status: In Production
Shipping Method: 7 Day Delivery
Estimated Delivery Date: 5/4/2011
Carrier: Not Shipped
1 225-0675 XPS 15
1 317-6408 2nd generation Intel Core i7-2630QM processor 2.00 GHz with Turbo Boost 2.0 up to 2.90 GHz
1 317-6414 6GB,DDR3,2 DIMM
1 331-1668 Backlit Internal Keyboard - English
1 320-1673 15.6FHD TLF B+RGLED LCD L501X
1 421-3874 Camera Software 2.X, Factory Install
1 421-3642 Basic Stage
1 320-2118 NVIDIA GeForce GT 525M 1GB graphics with Optimus
1 342-2369 500GB 7200 RPM SATA Hard Drive
1 318-0490 Elemental Silver Aluminum (WLAN)
1 420-6576 DELL WELCOME,Software Dimension/Inspiron
1 420-9691 DataSafe Local BackUp
1 420-6436 PC-Restore, Dim/Insp
1 330-6222 Windows 7 Label
1 421-1737 Genuine Windows 7 Home Premium, 64bit, English
1 421-0092 DELL-DOWNLOAD-FLAG
1 420-9876 Cozi-Calendar
1 421-2086 eBay Webslice
1 421-0757 Skype VOIP Application
1 421-4118 WHITEPAGES.COM,Webslice
1 421-4289 Dell Support Center Software 3.0
1 318-0392 Windows Live Wave 4
1 331-1674 Resource DVD (L502X)
1 430-4038 Integrated 10/100/1000 Network Card
1 410-1883 Adobe Acrobat Reader 9.0 Multi-Language
1 318-0151 Tray Load Blu-ray Disc BD-Combo (Reads BD and Writes to DVD/CD)
1 318-0434 Roxio Creator Starter, FI
1 421-4550 Power DVD 9.6, 3D
1 318-0431 Creative SoundBlaster X-FI MB 1.2
1 430-4046 Intel Centrino Wireless-N 1000
1 421-4736 Wireless Display Software
1 410-9454 McAfee Platinum, 24 Month, MUI
1 312-1185 56 WHr 6-cell Lithium Ion Primary Battery
1 410-0487 Microsoft Office Starter: reduced-functionality Word and Excel with ads. No PowerPoint or Outlook
1 939-4850 Dell Hardware Limited Warranty, Extended Year
1 939-4860 Dell Hardware Limited Warranty, Initial Year
1 939-4880 Dell Limited Hardware Warranty Plus In-Home Service After Remote Diagnosis, 1 Year Extended
1 939-4870 Dell Limited Hardware Warranty Plus In-Home Service After Remote Diagnosis, Initial Year
1 950-3338 2 Year Limited Warranty
1 420-8878 Soft Contracts Dell In-Home Hardware Agreement
1 925-4561 Warranty Support, 1 Year Extended
1 933-0410 Warranty Support, Initial Year
1 988-0099 To activate your online backupaccount, go to Start, Programs, DataSafe Online
1 927-2357 DataSafe Online 2.0 2GB
1 421-4356 Software, DataSafe Online 2.0 2GB
1 330-0171 S and P Drop-in-Box Marcom forDHS Notebooks
1 430-3893 No Mobile Broadband L501X
1 466-7687 Thank you for choosing Dell
-
Order Date : 03/31/2011
Status : Released To Manufacture(Work In Progress)
Delivery : Express Delivery
EDD : yet to be confirmed
the config is in my signature -
Status : Manufacturing build complete
sent for clearance -
Order Date: 4/7/2011
Order Status: Ship Complete or Finalizing Production or Delivery Preparation or In Production (depending on what Order Status page I use)
Shipping Method: 7 Day Delivery
Estimated Delivery Date: 4/28/2011
Carrier: Not Shipped
Dell XPS 15, i7-2720QM, 6GB Ram, 1080p B+RGLED, 500 HD, 540M (2GB), Blu-ray, 6230, Backlit Keyboard, 6 cell battery -
Order Date: 12/04/2011
Order Status: Work In Progress
Delivery Information
Estimated Delivery Date: 13/05/2011
I hope to God it's quicker than that
I'm in the UK btw. -
Order Date 3/22/11
Order Status Shiped on 4/6/11
Came defective
They are sending me a new one.
Called them yesterday and the i5 processors are delayed. -
Today Date: 4/12/2011
Order Status: Delivery Preparation
this is going super fast -
Lucky
-
What's the soundblaster option all about? You guys ordering the JBS with the X-fi? What does the x-fi option give you?
-
Delivery Preparation...since Saturday...
1 225-0675 XPS 15
1 317-6409 2nd generation Intel Core i7-2720QM processor 2.20 GHz with Turbo Boost 2.0 up to 3.30 GHz
1 317-6414 6GB,DDR3,2 DIMM
1 331-1668 Backlit Internal Keyboard - English
1 320-1673 15.6FHD TLF B+RGLED LCD L501X
1 421-3874 Camera Software 2.X, Factory Install
1 421-3642 Basic Stage
1 320-2120 NVIDIA GeForce GT540M 2GB graphics with Optimus
1 342-2372 640GB 7200 RPM SATA Hard Drive
1 318-0490 Elemental Silver Aluminum (WLAN)
1 420-6576 DELL WELCOME,Software Dimension/Inspiron
1 420-9691 DataSafe Local BackUp
1 420-6436 PC-Restore, Dim/Insp
1 330-6222 Windows 7 Label
1 421-1737 Genuine Windows 7 Home Premium, 64bit, English
1 421-0092 DELL-DOWNLOAD-FLAG
1 420-9876 Cozi-Calendar
1 421-2086 eBay Webslice
1 421-0757 Skype VOIP Application
1 421-4118 WHITEPAGES.COM,Webslice
1 421-4289 Dell Support Center Software 3.0
1 318-0392 Windows Live Wave 4
1 331-1674 Resource DVD (L502X)
1 430-4038 Integrated 10/100/1000 Network Card
1 410-1883 Adobe Acrobat Reader 9.0 Multi-Language
1 318-0151 Tray Load Blu-ray Disc BD-Combo (Reads BD and Writes to DVD/CD)
1 318-0434 Roxio Creator Starter, FI
1 421-4550 Power DVD 9.6, 3D
1 318-0431 Creative SoundBlaster X-FI MB 1.2
1 430-4048 Intel Centrino Advanced-N 6230 and Bluetooth 3.0
1 421-4736 Wireless Display Software
1 410-9452 McAfee Platinum, 30 Day, MUI
1 312-1186 92 WHr 9-cell Lithium Ion Primary Battery
1 410-0487 Microsoft Office Starter: reduced-functionality Word and Excel with ads. No PowerPoint or Outlook
1 939-4860 Dell Hardware Limited Warranty, Initial Year
1 939-4870 Dell Limited Hardware Warranty Plus In-Home Service After Remote Diagnosis, Initial Year $55.00
1 950-3337 1 Year Limited Warranty
1 950-9797 No Warranty, Year 2 and 3
1 420-8878 Soft Contracts Dell In-Home Hardware Agreement
1 933-0410 Warranty Support, Initial Year
1 988-0099 To activate your online backupaccount, go to Start, Programs, DataSafe Online $0.00
1 927-2357 DataSafe Online 2.0 2GB
1 421-4356 Software, DataSafe Online 2.0 2GB
1 430-3893 No Mobile Broadband L501X $0.00 -
Ordered: 3/25
Shipped: 3/31
Delivered: 4/1
Upgraded me to next day shipping cause of the "trouble" i had having to re-order. Didn't even ask for it -
Ordered on 4/8/11. If I configured my profile correctly, the specs are in my signature. Seems like forever already.
Since December, I've (1) ordered an XPS L501x and returned it on delivery, (2) ordered, hated and returned an Inspiron 15R, (3) ordered and then cancelled a Lenovo Ideapad y560p, because its screen res (1366x768) was not going to work for me, (4) ordered a Lenovo Thinkpad W520 and then cancelled it because the 1.0 watt speakers wouldn't work for me either, and then (5) ordered my Dell XPS L502x, which is currently in production.
I have an EDD of 5/5. I've heard something about watched clocks and pots not boiling, but I've set up a lawn chair by the front door to watch for the UPS truck. -
Order Date: 4/4/2011
Order Status: In Production
Shipping Method: 7 Day Delivery
Estimated Delivery Date: 4/25/2011
Carrier: Not Shipped
Intel Core i7-2630QM processor 2.00 GHz
6GB DDR3 Ram
FHD TLF B+RGLED
NVIDIA GeForce GT 525M 1GB
500GB 7200 RPM
Blu-ray Disc BD-Combo
Intel Centrino Wireless-N 1000
6-cell Lithium Ion Primary Battery
Windows 7 Home Premium -
Guys for all of you that ordered with the i5 processors, There was a delay and dell finally received them yesterday. Tech support guy told me so
-
On which webpages are you guys tracking your order. I've been using this one: http://support.dell.com/support/order/status.aspx?c=us&l=en&s=gen
-
Right now, I'm using a POS Dell Latitude D400 circa 2003 and my wife's old Inspiron 1520. I'll be right back...gotta see if the UPS man is doing a late run tonight... -
-
Order shipped 12th april and due to local holidays here on 13th and 14th of april delivery date on 15th
-
You know what, I kept editing this post since my order just shipped, but suffice now to say that my original order date was 3/23 with EDD 4/13, I had been told various contradictory and senseless things by phone reps, had it delayed for bogus-sounding reasons with a new EDD of 5/4, and now have had it shipped with FedEx scheduled to deliver tomorrow.
1 225-0675 XPS 15
1 317-6409 2nd generation Intel Core i7-2720QM processor 2.20 GHz with Turbo Boost 2.0 up to 3.30 GHz
1 317-6415 8GB,DDR3,2 DIMM
1 331-1668 Backlit Internal Keyboard - English
1 320-1673 15.6FHD TLF B+RGLED LCD L501X
1 421-3874 Camera Software 2.X, Factory Install
1 421-3642 Basic Stage
1 320-2120 NVIDIA GeForce GT540M 2GB graphics with Optimus
1 342-2372 640GB 7200 RPM SATA Hard Drive
1 318-0490 Elemental Silver Aluminum (WLAN)
1 420-6576 DELL WELCOME,Software Dimension/Inspiron
1 420-9691 DataSafe Local BackUp
1 420-6436 PC-Restore, Dim/Insp
1 330-6222 Windows 7 Label
1 421-1737 Genuine Windows 7 Home Premium, 64bit, English
1 421-0092 DELL-DOWNLOAD-FLAG
1 420-9876 Cozi-Calendar
1 421-2086 eBay Webslice
1 421-0757 Skype VOIP Application
1 421-4118 WHITEPAGES.COM,Webslice
1 421-4289 Dell Support Center Software 3.0
1 318-0392 Windows Live Wave 4
1 331-1674 Resource DVD (L502X)
1 430-4038 Integrated 10/100/1000 Network Card
1 410-1883 Adobe Acrobat Reader 9.0 Multi-Language
1 318-0151 Tray Load Blu-ray Disc BD-Combo (Reads BD and Writes to DVD/CD)
1 318-0434 Roxio Creator Starter, FI
1 421-4550 Power DVD 9.6, 3D
1 318-0138 JBL 2.1 Speakers with Waves Maxx Audio 3
1 430-4048 Intel Centrino Advanced-N 6230 and Bluetooth 3.0
1 421-4736 Wireless Display Software
1 410-9452 McAfee Platinum, 30 Day, MUI
1 312-1185 56 WHr 6-cell Lithium Ion Primary Battery
1 410-0487 Microsoft Office Starter: reduced-functionality Word and Excel with ads. No PowerPoint or Outlook
1 939-4860 Dell Hardware Limited Warranty, Initial Year
1 939-4870 Dell Limited Hardware Warranty Plus In-Home Service After Remote Diagnosis, Initial Year
1 950-3337 1 Year Limited Warranty
1 950-9797 No Warranty, Year 2 and 3
1 420-8878 Soft Contracts Dell In-Home Hardware Agreement
1 933-0410 Warranty Support, Initial Year
1 988-0099 To activate your online backupaccount, go to Start, Programs, DataSafe Online
1 927-2357 DataSafe Online 2.0 2GB
1 421-4356 Software, DataSafe Online 2.0 2GB
1 330-0171 S and P Drop-in-Box Marcom forDHS Notebooks
1 430-3893 No Mobile Broadband L501X
1 421-4600 Recovery DVD for Windows 7 Home Premium OS, 64bit, English -
Mine has finally Shipped
I have Next Day shipping so maybe tomorrow...
-
-
I'm using the standard order status page on Dell's website. -
As soon as I login to dell, it's the 1st status page that shows "Delivery Preparation" (all previous orders as well). Yours is in the same status as mine was hours ago, mine took about 2 full business days to go from "finalizing" to shipped. Weekends evidently don't count.
-
Order Date: 4/8/2011
Order Status: In Production
Estimated Delivery Date: 5/02/2011
Carrier: Not Shipped
--------------------------------------------------------------------------------------------------------------------------
XPS 15 - i7-2720QM - 8GB,DDR3 - B+RGLED - GT540M 2GB - 750GB 7200 - Blu-ray Disc BD-Combo - 9-cell - 6230 and Bluetooth 3.0 - Tarus Meridian Backpack(free) -
Hmph. Mine was in production for a week before I canceled it. This nonsense about some people waiting 5 days and others waiting a month was a *big* reason why I gave up on ordering any XPS model - it is SUCH a drag. I'm an anxious person by nature, and it was driving me completely and totally insane to have to deal with such an enormous degree of unreliability. The fact that it takes so long to begin with is just extremely poor business practice. I was very unimpressed. And the customer service folks were absolutely no help in providing me with additional information. Even if their English was good enough to be borderline intelligible (and if they understood my American accent, which I'm not sure they ever did) I literally was provided with no worthwhile information *whatsoever*. What a nightmare.
-
my order say right now Ship Complete but no tracking number yet
-
Some people get lucky and only have to wait a few days. It more typically takes 2 weeks. 3 weeks or more is unfortunate but rare. I say you shouldn't have cancelled after only 1 week. I do empathize with you wanting more detailed information from customer service, though. The stuff they tell you can really make no sense. You'd think they'd be able to receive updates from the assembly team or at least be able to contact them for accurate status whenever you call. -
I waited 3 weeks before it finally shipped yesterday. Looks like they overnighted it and should be here today. Funny because today was my original EDD but they changed it to May a few days ago, then back to today yesterday.
-
Of course, I should have done all that self-educating before-hand, but I didn't... Because I didn't want to wait even longer, in the end.
-
-
seriously there bro I hear you on the waiting sucks thing, but let me know where I can get another laptop with these features, let alone under $1100 shipped and I'll take my order there instead ;-)
Sandy Bridge CPU (i5)
Optimus
15.6" FHD screen
USB 3
eSATA
HDMI
620GB 720rpm HDD
6GB RAM
backlit keyboard
Office H&S 2010
BD drive
9-cell btty
...and last but not least...
high quality audio - sorry Clevo/Sager :-( -
So I look around and around, and eventually find a really nice deal for an Asus G53SW that had almost the exact same specs I had on my XPS 15 - same sandy bridge processor (i7-2630QM) same amount of RAM (6GB) same type of screen (glossy LED backlit FHD 1920x1080p) same hard drive (500GB 7200RPM that i'll probably replace with an SSD eventually anyway). The big difference that the G53SW had a GTX 460m 1.5GB graphics card, a huge upgrade over anything the XPS 15 series had to offer. And it only cost $1200 instead of $1000. And I'm getting it on Friday instead of... 2 or 3 or 4 or however many weeks from now. Might not have the awesome audio of the XPS and the screen might not be *quite* as fancy... But I can seriously live with that. There are other advantages to the Asus. -
i call to cancel my order today they said no
-
-
-
-
I ordered my L502X on 4/7/2011 and the estimated delivery date is 5/3/2011.
-My Account - Delivery Preparation
-Order Status - In Production
-Recent Orders - Ship Complete
-Order Details - Finalizing Production
-Phone (Automated) - Shipped 4/28/2011 and will be delivered 5/3/2011
-Phone (Representative) - Laptop is finished and is awaiting shipment to me. The rep stated that the laptop is completely finished production and is just waiting to be shipped.
I will update you on the status of my order. It has been in this state since 4/11/11. I hope that the laptop just shows up on Friday, or even better, Tomorrow! -
Now my replacement. The shipping is Next business day. It only hung at shipment info sent to fedex for 5 hours until it was picked up.
So your shipping method from my conclusion influences how long it hangs at the process "shipment info sent to fedex"
Sorry for the typos or misconfusing as i am tired.
I would liek others that received there order to confirm this. Please look on your fedex tracking page and notice the time difference between "the shipment info sent ot fedex" until picked up.
cheers -
-
My Dell xps 15 l502x order status-
11-Apr-2011 Order Received
11-Apr-2011 Order released to manufacturing
14-Apr-2011 Manufacturing Build Complete
So approx how many more days will it take for shipping?
--------------------------------------------------------------------------------------------------------------------------
XPS 15 - i7-2720QM - 8GB,DDR3 - B+RGLED - GT540M 2GB - 750GB 7200 - Blu-ray Disc BD-Combo - 9-cell - 6230 and Bluetooth 3.0 - Tarus Meridian Backpack(free) -
Usually when the order status says "Manufacturing Build Complete" means it is already invoices (meaning you would see 14-Apr as the date of invoice). And thus you should receive the laptop within 1 week maxx. -
Does Dell have that music that plays when you're on hold available for sale? Maybe they could install it on my computer.
Ordered 4/8
In Production 4/9
EDD 5/5
Right now, on my main account page, it shows as "Delivery Preparation."
On the order details page, it is still "In Production."
I called, got transferred five times (lastly to India), and the best the rep. could tell me is that it is in the final stages of production and would go through testing next (which he called a wonderful process...).
I tried to expedite the order, but he said they couldn't. I tried to expedite the shipping method, and he said they couldn't. I'm pretty sure I'll get it sooner than 5/5, but the waiting is bothersome. -
Shipment Dates
Anticipated ship date Apr 13, 2011
Estimated delivery Apr 15, 2011
Destination
FL
So, does that mean that I will be receiving the package tomorrow, or will Dell fully release the package to Fedex for delivery tomorrow? -
Order Date: 4/8/2011
Shipped Date: 4/14/2011
Estimated Delivery Date: 1/1/2070 (updated)
LOL THATS WHAT IT SAYS! -
-
Order date: 4/9/11
Shipped date: 4/14/11
-
*UPDATE---
Order Date: 4/4/2011
Order Status: Shipped 4/14/2011
Shipping Method: 7 Day Delivery
Estimate: Fed Ex - 4/19/2011 (FED EX Tracking:Estimated delivery - 4/15/2011)
Intel Core i7-2630QM processor 2.00 GHz
6GB DDR3 Ram
FHD TLF B+RGLED
NVIDIA GeForce GT 525M 1GB
500GB 7200 RPM
Blu-ray Disc BD-Combo
Intel Centrino Wireless-N 1000
6-cell Lithium Ion Primary Battery
Windows 7 Home Premium -
-
-
Dell XPS 15 (L502X) - Order Progress
Discussion in 'Dell XPS and Studio XPS' started by Rossi77, Apr 10, 2011.