Has your Dell XPS 17 shipped yet? If so,
Post your specs and the date shipped and your location.
I want to see how Dell is doing with the shipping.
Ordered mine 3/31 and still in "production".
Hoping someone that ordered few days before that or on that date is having their laptop shipped.
-
This is kind of a repeat of existing posts.
Ordered 3/13, original EDD 4/7, updated EDD 4/15, still "In Production" with 7 day shipping. Going to Raleigh, NC
L702x | Intel Core i7-2720QM 2.20GHz | 16gb DDR3 | nVidia GT 555M | 1.28 TB HDD | Blu-Ray Triple Combo | 1920x1080 3D | 9 Cell Battery | Centrino 1030 N w/ BT 3.0 -
ordered 3/28 still in production
-
Ordered: 3/29
Received: 4/4
Specs: 1080p 3D, I7-2720QM, 4GB, 555M, 500GB, 9-Cell, 6230N, BR Combo
Location: Indiana
That's quick... -
Wow dude. That's amazing. You are very lucky.
-
No kidding. Been waiting nearly a month and then see people getting them in days really stinks.
-
Ordered - 3/30; Received - 4/6
My Specs were: i7-2630QM, 1080p 3D, GT 550M, 500GB HD, 4GB RAM -
I don't understand how people are getting it so quick.
Did your order status update to "shipped"? What was your estimated date? -
Ordered 3/31 received 4/6. My specs are ; i7-2720QM, 1080p-3D, GT 550M, 500GB HD, 4GB RAM, Backlit, 6230.
Ordered another one yesterday 4/6 with specs i7-2720QM, 1080p, GT 550M, 500GB HD, 4GB RAM, Backlit, 6230. EDD 5/2/2011 -
Ordered 3/28. Dell rep says its been ready to be shipped since 4/4 but it will not ship for at least another 24-48 hours.
Specs: i7-2720QM, 3D, GT 555M 3GB with TV Tuner, 12GB, 640GB HHD & 256GB SSD, Blu-ray Writer, Backlit, 6230 and Bluetooth
Try this page and enter your Dell Purchase ID:
https://www.dell.com/support/orderstatus/us/en/19
My laptop has said "Finalizing Production" since 4/4. -
Amazing!
Made the order on 3/31 and it was in production on 4/1 and shipped on 4/7. It is on its way to me and should arrive on 4/11.
Specification: 1080p 3D, i7-2630QM, 4GB, 3GB GT555M with 3D, 9-cell battery, N1030, Backlit Keyboard. -
Ordered mine 1 March, EDD 24 March, no new EDD given. Glasses have been shipped from Dell. i7-2820, 16 gig of RAM, 1920X1080 3D monitor, 1.28 TB 7200 RPM SATA dual hard drives, 555M 3GB graphics, backlit keyboard, 9 cell battery. Location: Virginia.
-
SupahFlyJellyfish Notebook Enthusiast
Nice. I got the exact same thing and I ordered it 4/5, so I'm hoping it'll take no more than the 11~12 days that yours took. -
If you guys are curious to see If you have any delays, call up Dell. They told me they were waiting for the i7 processor I ordered (this was 2 days ago) so If Dell is waiting for something, they should be able to tell you.
-
ordered 3/20 with a 5/5 delivery date
received April 1st (no joke)
and the site still is on Order Processing... if I were to rely on the site alone, it was never built or shipped.... -
maybe they'll send you another
-
I'm getting upset that people that ordered 3/31 are getting their laptops and I am still waiting on mine :\
-
If it will make you feel better, I ordered mine of Feb 24 and still don't have it. My EDD is 5/18.
-
That sucks. What did you order?
-
Intel Core i7-2820QM 2.30GHz
16GB DDR3
nVidia GT 555M 3GB w TV Tuner
1.28 TB HDD
Blu-Ray Triple Combo
1920x1080 3D
Backlit Keyboard
9 Cell Battery
Centrino 6230 N w/ BT 3.0
Basically, I've been told each day a different part is on back order. But I believe it has to do with the 16gb of memory as anyone that placed an order with it still hasn't received theirs. And I find it curious that 16gb is no longer an option when ordering. This is the one time I didn't buy the memory somewhere else and put it in myself. I was just being lazy and now I'm paying for that laziness.
-
Excellent idea. The point here is that they should have taken the initiative to make a call to their customers, not the other way around, don't you think so guys?
That is pretty sad. Make more calls to them or chat with them online to check on your status.
Fingers crossed! I did not believe my eyes when I saw the confirmation status via an e-mail from Dell yesterday. That was a surprise as the first order took me around 20 days to arrive.
Please try to take it easy. I'm sure that you will get your laptop before the EDD. Keep the faith.
Has your Dell XPS 17 shipped yet?
Discussion in 'Dell XPS and Studio XPS' started by jerydawg, Apr 7, 2011.