On the 19th I think it was I ordered a M1530. Specs were:
Intel Core 2 Duo Processor T7500
3GB, DDR2
15.4 inch Wide Screen WXGA+ TrueLife LCD
256MB NVIDIA GeForce 8600M GT
160G 7200RPM SATA Hard Drive Free Fall Sensor
A 2 year warranty included. Total cost was $1616.
Next day I go in and configure a system and notice a I can get something better for $6 more. For only that much more I could upgrade to:
Intel Core 2 Duo Processor T9300
4GB, DDR2
15.4 inch Wide Screen WXGA+ TrueLife LCD
256MB NVIDIA GeForce 8600M GT
250G 7200RPM SATA Hard Drive
And a 3 year warranty.
What gives? Just because I configured it through a different link? That's a hell of a big difference for $6.
Now in the second case it said I would not receive my order until the 19th of May which I thought was ridiculous.
After a few days I decided to go back in and reconfigure again, this time noticing that it would ship out on the 2nd instead of the 12th like the second config.
I call up Dell and ask them how long it would take to refund my credits so that I could use my line of credit right away to order a new system.
I get some India tech support...great... script readers who I can hardly understand at times when they start speaking too fast. Guy tells me 3-5 Business days to refund the credit. I get pissed cause I know I will miss out on the $749 off.
I start up the chat and talk to a nice girl who gives me a phone number and tells me that the credit can go back within minutes. I do that and all is well. (Hey Dell, stop outsourcing Support please?) Credit is back within minutes and I put in a new order for:
Intel Core 2 Duo Processor T9300
Midnight Blue Casing
4GB, DDR2
15.4 inch Wide Screen WXGA+ TrueLife LED
256MB NVIDIA GeForce 8600M GT
160G 7200RPM SATA Hard Drive Free Fall Sensor
3 Year Warranty. Total cost was $1649.30
Now to recap, the reason I ordered it a 3rd time was to cut down on shipping time since the config page said it would ship on the 2nd and not the 12th.
Well I am glad I upgraded to the LED screen based on what was said here and I did lose a bit in HDD space but I don't need it anyhow. But as soon as I placed my order the shipping date said the 12th again. Nice.![]()
I am really hoping this thing ships quicker than the 12th as it is a bit of an emergency backup system.
I just hope I am really happy with this thing, it will be my first real good laptop, have been used to second hand dinosaurs in the past.![]()
-
It almost always ships sooner than the "ship date". They always grossly over-estimate it.
-
Congrat's on your purchase!!!
Sorry for all your troubles, though...Shipping is always sooner, then estimated!
I hope you enjoy it once you receive it, I am very happy with mine -
Thanks for the info, How sooner is it likely to ship?
-
I ordered my laptop on a Friday evening and received it the following Monday (so three days to my doorstep). It depends.. but it shouldn't take more than a week.
-
wow. Is that what your shipment time said, if not how sooner was it vs the estimated ship date?
-
I ordered it 4/4/2008 and it was shipped 4/6/2008 (with free ground shipping).
Dell "estimated" it to be shipped 4/15/2008. -
Generally build through boxing takes about a week provided that all of your configured parts are available for kitting. I would expect delivery within 8 to 10 days or so of your order date.
Ordered a M1530.
Discussion in 'Dell XPS and Studio XPS' started by NewDelly, Apr 26, 2008.