So with all this word about delays with the M1330...is there any talk about the fastest receive time?
Sorry to gloat, but this feels awesome (even though I'm taking off in 2 days for vacation).
Ordered on July 29.
M1330
Black
1.8 ghz (7100?)
2gb ram
Nvidia card
LED Screen
120gb hd
Fingerprint
Bluetooth
Received on Aug 9 (picked up today since I was in Hawaii).
![]()
![]()
![]()
![]()
![]()
![]()
-
They also sent me 2 remotes....
-
I ordered 8/6 and mine is arriving tomorrow 8/14.
-
My replacement was ordered at 5:30PM today and now it's in Production.
Order Number: 791977xxx
Order Date: 8/13/2007
Order Status: In Production
Shipping Method: Next Business Day
Est. Ship Date: 8/20/2007
Est. Delivery Date: 8/21/2007
1 222-9699 XPS M1330, Intel Core 2 Duo Processor T7300 (2.0GHz/800MhzFSB, 4M L2 Cache)
1 310-9240 Matte Black Casing XPS M1330
1 311-7310 2GB, DDR2, 667MHz 2 Dimm, for XPS M1330
1 320-5591 Slim and Light LCD with Matte Black Casing and Camera XPS M1330
1 320-5603 128MB NVIDIA GeForce 8400M GS, for XPS M1330
1 341-4938 120GB 5400RPM SATA Hard Drive for XPS M1330
1 420-6813 Microsoft Windows Vista Home Premium Edition, English
1 420-7098 Media Direct 3.3
1 420-6995 DELL SUPPORT 3.4,DIM/INSP
1 420-5769 Internet Search and Portal
1 420-5924 Icon Consolidation Application
1 420-6436 Vista, PC-Restore, Dim/Insp
1 463-2282 Dell Owners Manual installed on your system,click on icon after system set-up to access
1 420-7387 DELL RESOURCE DVD,BACK-UP XPS-M1330
1 412-0946 Dell Travel ExpressCard Remote Control, IR
1 310-9246 Creative Earbud EP630
1 430-0493 Integrated 10/100 Network Cardand Modem, for Inspiron
1 412-0917 Adobe Acrobat Reader 7.0, for Inspiron
1 313-5361 8X DVD+/-RW Slot Load Drive for XPSM1330
1 313-5014 Integrated Sound Blaster Audigy
1 430-2577 Intel 4965AGN Wireless-N Mini Card
Sean -
-
wtf. i ordered mine on august 6 too, but my ESD is september 14. WHAT?
i basically got what everyone else got almost, but without the discrete graphics.
matte black, t7300, 2 GB ram, FPR, BT, 120 GB 5400rpm HDD, LED w/ VGA webcam, Wireless-N, 6-cell battery, 3-5 day shipping.
though, i recently emailed my dell rep to upgrade my shipping, seeing as i need it by aug 29th. she responded in an hour of my email. now i feel bad that it took me like, half a day, to respond to her. HELLA fast response. but i dont know what she can do with my order, i just hope she doesnt charge me for it. -
-
LED Screen
-
-
-
ordered on 7/18...shipped on 8/2...i suppose 2 weeks of wait time wasn't that bad at all comparing to all the other delays
btw though...i had to called customer service to my warranty extended..so i cancelled and reordered on 7/26..and it still shipped on 8/2
oh well..i guess cancelling and reordering doesn't affect the ship date ?? when the rep told me it's gonna ship within 4-5 days...i didnt believe her at all..lol.. -
I the following config on 7/22: 2 ghz T7300, white backing, WLED backlight LCD w/VGA camera, 160 gig 7200 RPM drive, GeForce 8400M GS, 1 gig of RAM.
I check my order status almost every day and my EDD is still 9/11 to 9/13. It hasn't budged at all. I still want to SEE one in person so I can figure out if I should buy something else, esp. something cheaper (but larger) like a D630 or Inspiron 1420. -
Wow that fast! What config did you order? Gives me hope I might get mine sooner.
I ordered this config on 8/8 - Intel T7300 2.0ghz cpu, LED screen with webcam, 1GB, 120GB HD, DVDRW, Geforce8400, Bluetooth, 9 cell battery, Intel 4965 wireless N, matte black, 3yr CC warranty with LoJack (didn't really want the LoJack but didn't seem to be a choice). My ESD is still 9/13.
BTW did you order the FREE recycling kit and plant a tree? I did. Perhaps that's causing the add'l delay
-
Ordered 7/31 (XPS1330) Red, T7100
Original Ship date: 7/31
Then got email this morning telling me it has been shipped (8/14) with expected deliver 8/16-8/19.
How'd to get bumped 2 weeks faster? Not that I'm complaining. -
ok where ru located? and damn damn damn you lucky motha you congrats
M1330 Delivery Record?
Discussion in 'Dell' started by Chingyul, Aug 13, 2007.