I ordered a 1721 red lid on 7/23 with an adjusted esd of 8/28. Anyone have one with similar specs ship?![]()
Inspiron 1721, AMD Turion 64 x 2 TL-64 (2.2GHz/1MB)
Ruby Red Color with MicrosatinFinish
2GB, DDR2, 667MHz 2 Dimm
High Resolution, glossy widescreen 17.0 inch display (1920 x 1200)
ATI RADEON Xpress1270 256MB HyperMemory for Inspiron 1721 (Integrated)
160G 5400RPM SATA hard drive
Microsoft Windows Vista Home Premium Edition, English
8X DVD+/-RW Dual Layer Drive
Dell Wireless 1505 Wireless-N Mini Card
Integrated 2.0M Pixel Webcam
Creative Earbud EP630
85 WHr 9-cell Lithium Ion Primary Battery, for Inspiron 1721
430-2348 Dell Wirless 355 Bluetooth Mod
-
-
A few have been sent out. 1721's seem to ship before the 1720's, but all you can do is be patient.
-
i wish mine would come soon.3 weeks feel like forever!
-
some people are well over 40/50 days -
mordeth, your right, but i am just saying that two weeks could feel like two months, i didnt say anything about me waiting the longest or that i waited forever.
-
pink 1720s aren't shippin out either as it seems
-
I ordered my ruby red 1721 on 7/25/07 had an esd of 8/10 then esd of 8/28/07; then esd 9/5/07 with next day shipping...this morning I was in production... the build stage been their for days.... now at just after 1 im in boxing...... Keeping my fingers crossed....
Guess the testing phase was really quick! -
I was also delayed til Sept 05. Been checking status line 2-3 times a day and have been on build, just checked a few minutes ago and I am in Kitting!!!!!!! I am sooooooooo excited...
Sure hope I'm not getting excited for nuthin....
-
i got a midnight blue and just now hit testing(ordered on the 23 of july)
so here to hoping, and im pulling for you red guys and gals as well! -
2 hours later and status lines says I'm Testing.... I'm Testing !!! I'm Testing !!! as I dance around the room LOL
-
-
Here's hoping that all who have been waiting so long will get our puters soon!!! -
Yeah! Im in build after a state of perpetual pre production! Looks like those red lids came in! Now the true test, will they arrive at the current esd of 9/5? Tic, tick, tick....
1720 red, 2.2 gh, high res, blue tooth,webcam, yada,yada,yada
ordered 7/23
esd 8/6
esd 8/28
esd 9/5 -
Me again, just checked and I'm now in boxing!! Would really love to check in the morning and find it's shipped?!?!?!?!?!?
-
Dang it... I'm still in boxing...... so hoping it goes out the door tonight so it will deliver tomorrow....otherwise it will be Tues 9/4.......aaaaaaarrrrrrrrrggggggghhhhhhhh stupid holiday! wondering if they (DELL) are working over the holiday?
-
GAdreamer, I hope u dont go backwards like i did. I went from boxing to pre-production in a matter of one hour. This really sucks.
Inspiron 1720 Ruby Red
17" Anti-glare (1440 x 900)
Intel Core 2 Duo T7300, 2.0GHz, 800Mhz, 4M L2 Cache
2GB, DDR2, 667MHz
256MB NVIDIA GeForce Go 8600
160G hard drive
Integrated 10/100 Network Cardand Modem, for Inspiron
18X DVDRW Dual Layer Drive
Integrated Sound Blaster Audigy
Intel 4965AGN Wireless-N Mini Card
Integrated 2.0M Pixel Webcam
85 WHr 9-cell Lithium Ion Primary Battery, Inspiron 1720
Dell Wirless 355 Bluetooth Mod
Ordered: 7/21
1st ESD: 8/2
2nd ESD: 8/28
3rd ESD: 9/5 -
Haven't seen many people order any Yellow ones, yet they seem to not be shipping as well
I have seen at least a couple people with red moving through the stages at least. Hang in there!
-
Cadman,
As of 10 min ago I was still in boxing...... I never heard testing or Kitting whatever that is... I'm just hoping they didn't throw all the components in a box and then I have to wait a week for them to assemble it.... I hope to hear SHIPPED real soon. -
Yeah still in boxing here too :-( was so hoping it would ship this morning so I could get it Friday...Now earliest will be Tuesday... Still a lot better than where I was yesterday morning "build"......
-
yep, I went from boxing to pre-production and back to production, all in about a day. The csr I spoke with states the red lids are still delayed. Another csr I spoke with immediately afterward stated it was the cpu. I like to put myself thru various states of torture while I wait for this thing to ship. The moral of the story is this: It's anyones guess
1721 red, 2.2ghz, 2 gb ram, high res 17 in screen, blue tooth, webcam and all the other goodies I will probly never see.
ord 7/23
esd 8/6
esd 828
esd 9/5 -
i still have a whole month before i get mine
-
mine is still in build.it should come to shipping soon though, because a csr said i either received the back ordered part today, or will get it early next week.i gonna go with received yesterday and live happy!
-
Hee Hee, sending out bunches of good thought vibes!
-
Yes! shipped as of today 9/1!
-
what was your order date?
-
not seeing any yellow either.
-
Finally mine has shipped supposed to be here tomorrow!!!!! Hopefully all orders will start moving a little faster now...
-
Just got an email from Dell. Mine has shipped
I even have tracking numbers. Hope to get it in a day or so.
There is hope out there for everyone. -
IT'S HERE!!!!! Gorgeous, the feel and look of that red lid is fantastic. I'm now trying to set-up. This is going to be major just setting up preferences etc I've never touched a laptop in my life LOL!!!!!!!!!!!!!!!!! Had to set-up mouse, touch pad will take some practice.. Hope y'all get yours soon and ENJOY!!!
Not seeing any red 1720 or 1721's shipping?
Discussion in 'Dell' started by tmdalsanto, Aug 25, 2007.