The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.
Problems? See this thread at archive.org.
 Next page →

    US Order M1330 in "Build" Stage

    Discussion in 'Dell' started by joseyu, Jul 13, 2007.

  1. joseyu

    joseyu Notebook Consultant

    Reputations:
    16
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    I just check the status of my order via Dell's telephone order system and it has not changed from a "Pre-Production" stage to a "Build" stage. Hopefully it gets shipped sometime next week. I did order the LED display w/ camera, 8400 videocard, bluetooth and 6-cell battery. The order was placed at 8:30am June 26 via Dell SB.
     
  2. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    NOT changed?
     
  3. monkstah

    monkstah Notebook Consultant

    Reputations:
    0
    Messages:
    120
    Likes Received:
    0
    Trophy Points:
    30
    Hmm.. Mine says Pre-Production on the web, but I called the number and it says that it is in Build stage now.. But it ships 8/1, so that's not saying much. Mine was via EPP. But it's a 1420.
     
  4. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    LOL... thats a different story.... a 1330 actually in production is BIG news.
     
  5. joseyu

    joseyu Notebook Consultant

    Reputations:
    16
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    The estimated ship dates are generally not accurate at all and they almost always come way early. Once the computer reaches the build stage, it means that all the parts required to assemble the computer is complete. This stage generally takes less than a day and then it will move on to the testing phase. building and testing usually take about 1 day before moving to the boxing stage. This takes 2 to 3 days because that is when your computer is being shipped from Malaysia to Nashville, Tn. Once it gets to the US, the shipping method will determine how fast you get the computer. I would not be surprised if you get you computer by Wednesday or Thursday next week.
     
  6. DoubleBlack

    DoubleBlack Notebook Deity

    Reputations:
    70
    Messages:
    1,086
    Likes Received:
    0
    Trophy Points:
    55
    They've been in production for a couple of days now...
     
  7. CodeMonkeyX

    CodeMonkeyX Notebook Deity

    Reputations:
    118
    Messages:
    1,168
    Likes Received:
    0
    Trophy Points:
    55
    I ordered mine with similar specs on the 27th. So hopefully if everything goes well I might see some progress tomorrow before the weekend.
     
  8. joseyu

    joseyu Notebook Consultant

    Reputations:
    16
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    That is what the article from Dell said, but I don't think I have heard any US orders that are actually in the build stage. The standard online order status page has shown my order as being "In-production" since the day I ordered it. However, the telephone system had it at the "Pre-production" stage this evening. When I checked it 30 minutes ago, it had change to the "Build" stage.
     
  9. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    Well... we haven't seen anyone's m1330 in this forum go into "production" until recently (not pre-production). :)
     
  10. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    What was your order date again? and est. shipping date?
     
  11. joseyu

    joseyu Notebook Consultant

    Reputations:
    16
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    I wish I had checked earlier, because i might have caught the in-production "Kitting" stage. I will report back tomorrow to see if it has moved to the "Testing" phase.
     
  12. joseyu

    joseyu Notebook Consultant

    Reputations:
    16
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    8:30am June 26 via Dell SB. Est shipping date of July 30.
     
  13. GSRacer2102

    GSRacer2102 Notebook Guru

    Reputations:
    0
    Messages:
    62
    Likes Received:
    0
    Trophy Points:
    15
    I am in the build stage too. :)
    I ordered on 6/29 and got the led screen.
     
  14. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    Hmmmmmmm... lucky. Hopefully it will go through the production phase in a day or two. :)... then get to MINE!
     
  15. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    Woot!!!! I'm a few days after you. Hopefully I go into BUILD tomorrow or early next week.
     
  16. GSRacer2102

    GSRacer2102 Notebook Guru

    Reputations:
    0
    Messages:
    62
    Likes Received:
    0
    Trophy Points:
    15
    Yeah they finally started building them. :)
    My estimated ship date is 7/31, but if it is already in the build stage i hope it gets sent sooner.
    How long does the build stage usually last?
     
  17. joseyu

    joseyu Notebook Consultant

    Reputations:
    16
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    Building and testing usually lasts for about a day. Then the boxing stage, which is actually Dell shipping the computer from Malaysia to Nashville, Tn takes 2 to 3 days.
     
  18. GSRacer2102

    GSRacer2102 Notebook Guru

    Reputations:
    0
    Messages:
    62
    Likes Received:
    0
    Trophy Points:
    15
    I always wondered why it took so long to put something in a box during the "boxing" stage. lol
     
  19. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    I wish they popped it on a Concord jet and get it here in two hours. LOL...
     
  20. joseyu

    joseyu Notebook Consultant

    Reputations:
    16
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    If only they can still get a concorde jet that is still in flying condition. :)
     
  21. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    Couldn't the Airforce lend a few supersonic planes to Dell? LOL...
     
  22. pogiboi

    pogiboi Notebook Consultant

    Reputations:
    26
    Messages:
    122
    Likes Received:
    0
    Trophy Points:
    30
    Still preproduction here. Ordered the morning of the 26th
     
  23. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    Did you try calling? According to people, their online status isn't as accurate as the phone status.
     
  24. CMSUDave

    CMSUDave Notebook Consultant

    Reputations:
    30
    Messages:
    147
    Likes Received:
    0
    Trophy Points:
    30
    I ordered 7/9 but its great to see the people in the front of the line start moving through production.

    But this makes it even harder to wait now!:confused2:
     
  25. Lynus

    Lynus Notebook Consultant

    Reputations:
    52
    Messages:
    279
    Likes Received:
    0
    Trophy Points:
    30
    There's only a one day build time?! I've been building since the 10th... :(
     
  26. CMSUDave

    CMSUDave Notebook Consultant

    Reputations:
    30
    Messages:
    147
    Likes Received:
    0
    Trophy Points:
    30
    I guess its because those desktop replacements are HUGE! ;)
     
  27. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    Yea... the model of the laptop is a factor. :)
     
  28. monkhi

    monkhi Notebook Geek

    Reputations:
    5
    Messages:
    83
    Likes Received:
    0
    Trophy Points:
    15
    anyone have a m1330 with 2.2GHZ or 2.4GHZ in the build stage? I just read in another thread that 2.2GHZ and 2.4GHZ are on hold due thermal issues.
     
  29. Lynus

    Lynus Notebook Consultant

    Reputations:
    52
    Messages:
    279
    Likes Received:
    0
    Trophy Points:
    30
    Its ok, just keep telling yourselves size doesn't matter :laugh: But yea I assumed my lappy would make me a wait a tad bit longer, but not this long
     
  30. pogiboi

    pogiboi Notebook Consultant

    Reputations:
    26
    Messages:
    122
    Likes Received:
    0
    Trophy Points:
    30
    Ordered 6/26
    T7300
    LED/VGA
    Black
    CD/DVD
    120gb
    2gb
    N Wireless
    BT

    and......still in preproduction 7/13 9:40amcst
     
  31. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    even when you call on the phone?
     
  32. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    doesn't seem like they're on hold (atleast on the ordering page -- the wait time doesn't increase). That info was obtained through a rep... so I don't know if its reliable. LOL
     
  33. pogiboi

    pogiboi Notebook Consultant

    Reputations:
    26
    Messages:
    122
    Likes Received:
    0
    Trophy Points:
    30
    Yup, 1800-433-9014, and i work for Dell and internally its not moved at all. hmph.
     
  34. mepoh

    mepoh Notebook Guru

    Reputations:
    4
    Messages:
    73
    Likes Received:
    0
    Trophy Points:
    15
    I am in the same boat as you are. Ordered 6/26 and still in "pre-production" state.... T7300.
     
  35. Topspin14m

    Topspin14m Notebook Consultant

    Reputations:
    19
    Messages:
    297
    Likes Received:
    0
    Trophy Points:
    30
    Can people who are NOT talking about the m1330 please not post in this thread. It is very confusing. I believe this is a thread about m1330s that are in the build stage. All these OT posts are giving out misleading info...

    Glad we have at least one m1330 in build though :)

    I ordered 6/27 and am in pre-production.
     
  36. CodeMonkeyX

    CodeMonkeyX Notebook Deity

    Reputations:
    118
    Messages:
    1,168
    Likes Received:
    0
    Trophy Points:
    55
    Yeah we do not care about you puny Inspirons! :)

    My M1330 is still in pre-production I also ordered on 6/27.

    EDIT:
    USA - California
    M1330 - 1.5Ghz Processor
    RED LED Screen + Camera
    6-Cell Battery.
    STATUS = Pre-Production - Est. Ship Date 8/1/07
     
  37. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    Do you know why yours hasn't moved but people who ordered on 6/29 have moved? Thats very discouraging...

    if you work for Dell, you should know a little more about your order? So I would think...
     
  38. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    LOL... now now... we're all in the same family.
     
  39. rocketscientist

    rocketscientist Notebook Consultant

    Reputations:
    3
    Messages:
    118
    Likes Received:
    0
    Trophy Points:
    30
    I tired of my m1330 being in pre-production phase. I placed on June 28th and mine isn't being shipped to August 22.....
     
  40. Topspin14m

    Topspin14m Notebook Consultant

    Reputations:
    19
    Messages:
    297
    Likes Received:
    0
    Trophy Points:
    30
    Inspirons are easy to make though! Everyone has them in build or shipped. The XPS m1330 is a work of art. Takes more time to build a masterpiece :D
     
  41. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    i.e. The younger models want more attention then the older siblings. :p
     
  42. Topspin14m

    Topspin14m Notebook Consultant

    Reputations:
    19
    Messages:
    297
    Likes Received:
    0
    Trophy Points:
    30
    That stinks. I guess a day makes a huge difference. Mine is 6/27 shipping August 1. I don't get how you could move 21 days back by ordering a day later. I think Dell doesn't have it together and all these orders are gonna get pushed way back (like the Lenovo fiasco).

    If so, I'm canceling and going to the Sony store August 1 to get the new SZ that's coming out at the end of the month :rolleyes:.
     
  43. darthsat

    darthsat Notebook Deity

    Reputations:
    220
    Messages:
    820
    Likes Received:
    3
    Trophy Points:
    31
    I too placed my order on June 28th and it is still in pre-production. Estimated Shipping date isn't until 8/23.
     
  44. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    That doesn't make much sense (although est. shipping dates haven't changed for most of us)... I ordered on 7/1 and my est. shipping date is 8/17!
     
  45. CodeMonkeyX

    CodeMonkeyX Notebook Deity

    Reputations:
    118
    Messages:
    1,168
    Likes Received:
    0
    Trophy Points:
    55
    All they are are two pieced of wood with a few rusty nails hammered through to hold them together. Then they have a pre-school kid paint the top. :D

    P.S. Before anyone takes me seriously and starts flaming, I am kidding the Inspirons are great I am only KIDDING! :)
     
  46. Topspin14m

    Topspin14m Notebook Consultant

    Reputations:
    19
    Messages:
    297
    Likes Received:
    0
    Trophy Points:
    30
    Yeah I think I made an Inspiron last night. I needed a paper weight :D j/k
     
  47. HCW

    HCW Notebook Deity

    Reputations:
    246
    Messages:
    1,575
    Likes Received:
    5
    Trophy Points:
    56
    How can people who ordered after me have theres already in build stage with the same specs :(
     
  48. CodeMonkeyX

    CodeMonkeyX Notebook Deity

    Reputations:
    118
    Messages:
    1,168
    Likes Received:
    0
    Trophy Points:
    55
    I think the Dell blog guy is full of it. They are not going to change your estimated ship date until it changes status. Even then they may not bother. If they move your date forward then miss that date, then you are gonna complain even louder.

    They will leave the est. dates at what they are and just build systems when they can. They had just better be building them in order by the date they were placed, and when the components become available.
     
  49. GSRacer2102

    GSRacer2102 Notebook Guru

    Reputations:
    0
    Messages:
    62
    Likes Received:
    0
    Trophy Points:
    15
    Did you get anything special on yours? I ordered on June 29th with a ship date of July 31 and I am already in the build stage.
     
  50. CodeMonkeyX

    CodeMonkeyX Notebook Deity

    Reputations:
    118
    Messages:
    1,168
    Likes Received:
    0
    Trophy Points:
    55
    New rule please people. When you post your order status, can you please include your country, and any delayed options you might have installed: Processor, Screen Type, Color, Camera, and battery.

    Thanks I am going to edit my post now :)
     
 Next page →