The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.
Problems? See this thread at archive.org.

    Are the Sandy Bridge dv7's dispatched globally?

    Discussion in 'HP' started by leladax, Jan 7, 2011.

  1. leladax

    leladax Notebook Guru

    Reputations:
    0
    Messages:
    63
    Likes Received:
    0
    Trophy Points:
    15
    I'm currently trying to figure out why a European chain retailer is delaying a dv7 [remaining code number is not same with american]; it is listed in their site for several days and while ordered on monday they still don't have it in their central storage.

    In a previous call I was advised that since Intel announces the processor now it may start dispatching from the 6th. Is that true? Is HP obligated not to dispatch it before the 6th? (normally/legally or as a 'deal between gentlemen').

    Does anyone know if HP dispatches normally dv7s now or do we have to wait? And did they intentionally not dispatch them to retailers before the CES?