I recently ordered a notebook (Compaq V2000) on the 20th of September, and the estimated ship date says October 4th. I just wanted to know, since many people here have had their systems configured online, if this is a realistic date, or if in reality it's much quicker/longer. (I want it now!!!)![]()
Thanks!
-
-
I ordered my zv5000z on Sept. 8th, with an estimated ship date of Sept. 17th.
It was finished on the 15th, and shipped on the 16th.
Cheers,
Stevo
zv5000z: Ath64_3200+ (2.0GHz) - 1GB DDR - 80GB 5400rpm - 64MB GeForce4 440 - 15.0" XGA (1024x768) -
Never mind, I read some of the horror stories about 10-14 pages back. Sounds like people either get them early or horrendously late. I have some hope for the V2000, as people on other forums have ordered them and gotten it quickly.
-
Much thanks!
How long does it take for HP to build it?
Discussion in 'HP' started by sublimation, Sep 22, 2004.