Hey All, I see a bunch of threads about the T400, but I'm sure there are a lot of others who are in the same boat as me that have idea how to peg their T500 order experience.
I'm starting this thread to aggregate some of the scattered posts in different threads here.
My order:
T500
6-Cell
Order Date: 08/24/08
Estimated : 09/08/09
Shipping : 2 Day Express
Arrival Date: N/A
Also, a few things to note:
Credit Card Services is Useless. They never Answer.
Sales Reps are the Most Helpful.
Technical Support is completely separate from Lenovo. Looks like IBM is still doing the tech support.
Warehouse takes 2-4 days. Invoicing and billing takes 6-8 Days. How backward.
I'd love to hear other people's thoughts sand experiences.
-J
-
T500
6-Cell
Order Date 08/21/08
Estimated: No clue
Shipping: Free
Arrival Date: god knows when -
There's no estimated date listed?
-
...what makes me angry is that, I travel a lot for work and I -saw- someone with a T500 in DFW airport today. Grr!
-
-
So I called Lenovo for a human ship date estimate and they said it would ship "for sure the week of the 17th of September" ***. The website STILL says 09/08/08. I wonder if they're trying to roll ALL the T400's out first. Which would be terrible.
-
T500 ordered on Aug 22
Immediately received e-mail with estimated ship date of Sept 5
Called Lenovo to confirm this date and got answers that ranged from "the week of September to 5" to "more accurate date is Sept 12".
Received e-mail confirming that it shipped on Aug 27 and UPS tracking said I should receive it on Sept 2.
Was shipped UPS 2 day but neither Lenovo nor UPS could really explain what that meant if it is Hong Kong to US.
Would have come Aug 29 but UPS made a mistake on the sort and it was out for delivery to the wrong city. Convinced UPS that they should deliver on Aug 30 (Saturday) since the mistake was theirs. And they did.
Great system. -
-
I still got nothing here =[.
-
Wow, this thread is surprising to me. Here's how my recent order for a T500 went:
Ordered: 8/30 with 2 day shipping
Estimated ship date: 9/15
Ship Date: 9/2
Expected Delivery Date: Doesn't say, but its in Alaska right now, so I guess tomorrow.
So I ordered it on Saturday, and I'm going to get it by Friday, less than a week. I'm impressed with this, this is the fastest I've ever recieved a laptop from any company. -
-
I think I'm going to cancel my order and get a dell precision m4400 if it doesn't ship by tomorrow.
-
What are the exact specs? Maybe we can identify differences that have caused the delays and people who order next will know what to pick and if it's worth waiting for it...
-
Operating system: Genuine Windows Vista Business 64 1
Operating system Language: Genuine Windows Vista Business 64 - English 1
Display type: 15.4 WSXGA+ TFT 1
System graphics: ATI Mobility Radeon 3650 with 256MB 1
Total memory: 4 GB PC3-8500 DDR3 (2 DIMM) 1
Keyboard Language: US English Keyboard 1
Fingerprint : Integrated fingerprint reader 1
Camera: Integrated Camera Module 1
Hard drive: 160GB Hard Disk Drive, 7200rpm 1
Optical device: DVD Recordable, Ultrabay Slim 1
System expansion slots: Express Card & PC Card Slots 1
Bluetooth: Integrated Bluetooth PAN 1
Integrated WiFi wireless LAN adapters: Intel WiFi Link 5300 1
Modem: Yes - AMoM 1
Integrated wireless WAN adapters: Integrated WWAN upgradable 1
Battery: 6 cell Li-Ion Battery 1
Power cord: 90W AC Adapter; NA, LA, (2pin) 1
Publication Language: English US Publication 1 -
Maybe it's the T9400
-
Ordered it last Saturday, 8/30, expecting it tomorrow, Friday 9/5. 6 days from ordering on a Saturday to having it on my doorstep (barring any UPS screw up). I don't know, maybe it is the processor...or maybe the battery?
42X6335 SBB INT.CORE2DUOPROCP8400
42V8012 VBB MS WIN VISTA HOME BASIC
44C1269 SBB GEN WIN VIS HOBAS 32 US E
44C1923 SBB 15.4 WXGA TFT
44C1921 SBB AMD M86M HYBRID 256MB
42X6308 VBB 3GBPC3-8500 1067MHZ2DIMM
42X6355 SBB KYB US ENGLISH
44C1926 SBBULTRA NAV(TR.POINT+TOUCHPAD
44C1935 SBB 250GB HDD,5400RPM
44C1930 SBB CD-RW/DVD-ROM ULTS.SATA
42X6310 SBB EXPR.CARD SLOT/PCCARDSLOT
44C2615 SBB THINKPAD 11B/G WLAN PCI 3
41W1508 SBB 6 CELL LI-ION BATTERY -
Here's my situation (pretty frustrating):
Ordered: 8/8/08
Original Estimated Ship: 8/26/08
Current Estimated Ship Date: 9/9/08
I have called them multiple times. Initial support is very frustrating. Escalation to sales seems to be a little better, but not sure any actual improvement happens anyway.
42X6338 SBB INT.CORE2DUOPROCT9400
42X1587 VBB MSWIN VISTA ULTIMATE 32
44C1034 SBB G W VISTAULT32 US ENGLISH
44C1924 SBB 15.4 WSXGA+ TFT
44C1921 SBB AMD M86M HYBRID 256MB
42X6308 SBB 3GBPC3-8500 1067MHZ2DIMM
42X6355 SBB KYB US ENGLISH
44C1927 SBB ULTNV(TR.P.+TOUCHPAD)+FIN
44C1917 SBB INTEGRATED CAMERA
44C1937 SBB 160GB HDD,7200RPM
42X6326 SBB INT.TURBOMEMORY1.6 2GB
44C1931 SBB DVD REC8XMAXDUL.ULT.S.SATA
42X6310 SBB EXPR.CARD SLOT/PCCARDSLOT
62P6054 VBB INTEGR.BLUETOOTH PAN
42X6325 SBB INT.WIFI LINK5300
42X6331 SBB ERICS.F3507GUSA-WIWANCARD
39T6651 SBB 9 CELL LI-ION BATTERY
39T6442 SBB COUNTRY PACK NORTH AMERICA
44C1941 SBB LANG.PACK US ENG.
41C9170 THKPLUS TP 3YR PICKUP DEPOT -
I'm almost convinced it's the processor. That's the ONLY real commonality.
Also, mine just shipped today. Expecting it tomorrow. Mark_Lenovo on the lenovo forums was a HUGE help. -
still nothing for me, I'm seriously considering canceling the order
-
I think "Lenovo Recommends" options would give a better bet, since it's reasonable to see they should have better stock on whatever they recommends.
-
Confirmed it's a supply chain shortage of T9500.
-
-
-
Anybody heard anything? It seems that a round of people all had tomorrow as a ship date (myself included). Anyone called yet. I will as soon as I get a chance.
-
I just got mine today! UPS nearly lost it when a truck bay door opened on the freeway...
-
can someone post pics of their T500
T500 Ship Date?
Discussion in 'Lenovo' started by jazida, Sep 3, 2008.