just ordered an X201s with the following spec.
1 5129CT CONFIGURED SYSTEM
60Y7811 SBB ICI7-640LMP2.13GHZ,1066MHZ
45M3090 VBB GENUWIN7PROFES.64
60Y7932 SBB GWIN7PROF64 US ENGLISH
60Y7817 SBB 12.1WXGA+LEDW/TPADRC3X3LLA
42X6309 VBB 4GBPC3-8500 1067MHZ2DIMM
44C5216 SBB KEYBOARD US ENGLISH
60Y7823 SBB TRACKPOINTFINGREADTOUCH
60Y7841 SBB 320GBHARDISKDRIVE7200RPM
43Y3894 SBB THINKPAD X200 ULTRABASEVC
75Y0050 SBB DVD RC8X MDLLRULTR SLMATA
60Y7826 SBB 5-1MEDIACARDREADER+MODEM
75Y1342 SBB THPADX200SER6CELLLI-IONBAT
41W1787 SBB CPK NORTH AMERICA
60Y7824 SBB BLUETOOTH W/ANTENNA
45M4804 SBB IN.CENT.ULTIMATE-N 6300
60Y7853 SBB WIN7LANPACK US ENGLISH
41C9334 3YR Depot + 3YR ADP
the est. ship date is 04/22/10eek:
![]()
) is this normal?
-
Yes it is. Lenovo is known for their inaccurate shipping estimates.
-
OK, then can any one estimate when will it be shipped?
-
what was the estimated assemble time in days when you were configuring?
-
the site said
"Availability: Ships within 18 bus. days**"
and in the shopping cart, just before ordering it said: 4/20/2010
neither of which sounds good -
It's Lenovo's best guess of when your notebook will ship. It's why it's called it's called an estimated ship date. Just in time manufacturing is one of the ways Lenovo can offer you a great price on a great notebook, but one of the side effects is you can't have it right now and usually the ship times are longer in the beginning of the run like the X201 is now.
Honestly, is three weeks that bad for a quality notebook? If you need something sooner you can buy a pre-configured X201, but that will probably cost more. The X200 from the outlet is another option, but I waited three weeks for my X200. -
yes yes, if its three weeks I'll wait but I'm trying to get a better estimation on this date that's all
-
customization is a industry standard. all manufacturers provide customizable laptops & desktops...but lenovo is infamous for its bad supply chain & operations management...
3 weeks? Lenovo should learn from dell, or other major brands.
shipment takes about 1 week that's reasonable, but the manufacturing time should be controlled within 2 to 3 days. -
I've only had two encounters (actually, four but two weren't laptop purchases), but my rule of thumb is that the original "estimated ship date" --> when I'll have the laptop in my hand +/- two days.
x201s ship date
Discussion in 'Lenovo' started by mmn14, Mar 29, 2010.