The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.
Problems? See this thread at archive.org.

    Sorry Folks, I jumped off the Compal building

    Discussion in 'Other Manufacturers' started by metril, Jul 19, 2007.

  1. metril

    metril Notebook Deity

    Reputations:
    420
    Messages:
    968
    Likes Received:
    0
    Trophy Points:
    30
    Hey guys. The wait for the IFL90 WSXGA+ is just getting longer and longer. I'm not too sure I'll get it before August 17th, actually I need it by August 15th so I can set it up. The ASUS G1S was the laptop I looked at before this, and the HDMI, 5.1 Azalia, eSATA, spdif, and 500/1400 8600gt, convinced me to change my order.

    Good luck to all you guys and ya Compal orders.


    The ASUS is calling. :eek:


    By the way, I preordered June 21st and was hoping to receive it so I could test it out at Georgia Tech during my orientation the last week of July.
     
  2. Ilovelamp

    Ilovelamp Notebook Consultant

    Reputations:
    52
    Messages:
    225
    Likes Received:
    0
    Trophy Points:
    30
    Yeah if I don't get an update next week, I'm cancelling and going over to Bestbuy and picking up a laptop. The rate at which these are being sent over by Compal are ridiculous.
     
  3. iniquus

    iniquus Notebook Enthusiast

    Reputations:
    0
    Messages:
    43
    Likes Received:
    0
    Trophy Points:
    15
    I have contacted the sales customer service and with their suggestion, I have canceled my order for the IFL90 (WXGA+). I told them that I needed the laptop by August 17th and appealed for early August, but the screens haven't come in yet and she thought it would be best that I canceled.

    I know others have been waiting much longer...I've waited for just 11 days and this is a huge delay since I needed this laptop shipped to me before I leave for college...because now that I've wasted 11 days waiting for something that wouldn't have came in time, I now have to research for ANOTHER laptop to replace the Compal IFL90, and order it; somehow hoping it ships to me before the deadline that has now become 11 days closer...those 11 idle days...sigh.

    In any case, do you have any idea what reseller you're going to buy from...I think I'm getting the Asus too.
     
  4. Mippoose

    Mippoose Notebook Deity

    Reputations:
    126
    Messages:
    885
    Likes Received:
    0
    Trophy Points:
    30
    I also have to leave for college on the 22nd.



    Ordering this laptop in June made me think I'd be spending the summer with it.

    But it's turning out that I wont have a chance.


    If WSXGA+ has another major delay who knows what I'll do. :p
     
  5. ohmide

    ohmide Notebook Geek

    Reputations:
    4
    Messages:
    96
    Likes Received:
    0
    Trophy Points:
    15
    I'm holding off till the beginning of August to see if it my WXGA+ will be anywhere in sight. If not, it will suck becasue if I ordered a Dell Vostro "now" it can be shipped by the 1st week of Aug...
     
  6. RoyalScion

    RoyalScion Notebook Consultant

    Reputations:
    17
    Messages:
    147
    Likes Received:
    0
    Trophy Points:
    30
    Well, I have to say I canceled a few weeks ago. I wasn't willing to take the chance that they would come in before I had to leave, and I wanted at least a few weeks with my laptop before I left as well.
     
  7. metril

    metril Notebook Deity

    Reputations:
    420
    Messages:
    968
    Likes Received:
    0
    Trophy Points:
    30
    I ordered my ASUS G1S from xoticpc. Justin told me to email him my new laptop configuration so they could do a quick switch. They just need to charge my card the extra $400 or so. By the way, there is a back order on the Intel Robson, so I chose not to take that. Besides, 2 gb ram is plenty for Vista.

    I'll prolly pick up an SD card to use for Ready boost. It does help with gaming; loading textures, etc.
     
  8. jaydm

    jaydm Notebook Consultant

    Reputations:
    0
    Messages:
    113
    Likes Received:
    0
    Trophy Points:
    30
    I canceled mine last week and flipped a coin this morning to decide between the dell vostro and asus c90. It told me to go with the c90. Hopefully its a good laptop.
     
  9. ohmide

    ohmide Notebook Geek

    Reputations:
    4
    Messages:
    96
    Likes Received:
    0
    Trophy Points:
    15
    lol, I do the exact same thing with some of my life decisions.
     
  10. Donsell

    Donsell Notebook Evangelist NBR Reviewer

    Reputations:
    163
    Messages:
    546
    Likes Received:
    0
    Trophy Points:
    30
    I still sit here confused on what to do. We're still at least 2 weeks out from the wsxga screens on the Compals. My problem is I struggle with what to go to. The G1S has that green trim that makes it inappropriate in business situations. The C90 is running hot and has a short battery life, the 1520 is still from Dell consumer. The Latitude 830 maybe, but it has a lot weaker graphics.

    I just know that after waiting so long they'll get them in the day after I cancel. Its been my luck with things lately.

    I've earned the right to by cynical, btw.
     
  11. ohmide

    ohmide Notebook Geek

    Reputations:
    4
    Messages:
    96
    Likes Received:
    0
    Trophy Points:
    15
    I'm pretty sure we've all earned that right. If the wsxga is 2 weeks out, I'm figuring that the wxga+ is 3-4 weeks out meaning why am I even waiting? Even though the 1520 and even the Vostro is more-so consumer-based, I still think it will be more satisfying to be able to play games than on any unoptimized Quadro video card.

    Perhaps I should just order the Vostro, see which one gives me a shipping date first, and then cancel the loser order of the two.
     
  12. sco_fri

    sco_fri Notebook Evangelist

    Reputations:
    75
    Messages:
    451
    Likes Received:
    0
    Trophy Points:
    30
    The Dell is as far if not further out atm, at least with the 1520's
     
  13. spexc31

    spexc31 Notebook Evangelist

    Reputations:
    12
    Messages:
    473
    Likes Received:
    0
    Trophy Points:
    30
    it seems like people over at the sager forums are recieving their laptops now. you might wana wait it out alil longer....seems like shipments are going out now.
    i called powernotebooks this week and said if i order this week, ill get my np2090 early august. ill trust em =)
    hopefully...
     
  14. jurassicjet

    jurassicjet Notebook Guru

    Reputations:
    18
    Messages:
    57
    Likes Received:
    0
    Trophy Points:
    15
    I think that if the deliveries of the Compal IFL90 WSXGA+ are not started by August 1st, there will be a lot of folks canceling orders and going somewhere else.
    I am wondering also, in the back of my mind, if quality control is going to be affected by this whole debacle. I know it is pure speculation but can you see it now? "I don't care if we can't test these machines, get 'em out the door NOW!" says the Compal CEO to the VP of Quality Control. Or will they even do like Dell supposedly did and use a different vendor for their screens (on the 1520) and now have some QC issues?

    I know that if mine isn't in transit by August 1st I'm getting the Asus G1S. I'll turn the green lights off and be done with it.
     
  15. azriyeti

    azriyeti Notebook Geek

    Reputations:
    10
    Messages:
    98
    Likes Received:
    0
    Trophy Points:
    15
    This is the same mumbo-jumbo that got me to try compal in the first place. Last summer WSXGA+ Asus Z96J was my calling, but then it was delayed and delayed again and I went for my HEL80 instead...
    Such a painful thing to wait when you are excited for a new toy..
     
  16. HclBr

    HclBr Notebook Geek

    Reputations:
    20
    Messages:
    89
    Likes Received:
    0
    Trophy Points:
    15
    I was considering jumping off the compal building as well but I might as well wait it out. Order mine in mid June.
     
  17. Syntax Error

    Syntax Error Notebook Deity

    Reputations:
    481
    Messages:
    1,498
    Likes Received:
    0
    Trophy Points:
    55
    I had a very informative chat with Donald today, and he said that supply of the IFL-90s were in part hindered because of some plastic piece that fits on the LCD didn't properly fit - not the LCD itself, and apparently some plastics factory in China dropped the ball. Compal is a huge notebook manufacturer, so the manager of the plant had to reschedule the manufacture of the IFL-90 to make room for other models. As soon as the plastic piece was shipped over to the Compal factory, the IFL-90 schedule had to be elbowed in to be made again. Apparently at the moment, the IFL-90 is in full production right now, and another shipment is expected (remember the shipping industry is very tentative) to come by next week.
     
  18. HclBr

    HclBr Notebook Geek

    Reputations:
    20
    Messages:
    89
    Likes Received:
    0
    Trophy Points:
    15
    Thats some reassuring news. Thanks for the post.
     
  19. lemur

    lemur Emperor of Lemurs

    Reputations:
    524
    Messages:
    1,024
    Likes Received:
    0
    Trophy Points:
    55
    Well, for me a laptop is not a toy. It is a tool. I'm not saying I'm not going to game on it but I'm primarily doing Ph.D. research on it. Whenever I get a new machine there's a significant amount of time I must spend installing everything I need and configuring it. This time it is worse because my current laptop is limping (internal HD dead, using external HD through USB for *everything* :eek:) and I've had to put off some of my projects because of that. I don't want to install everything I need for those project and then have to reinstall everything on a new laptop. I'd rather do that just once. So I'm delaying the projects.
     
  20. Ilovelamp

    Ilovelamp Notebook Consultant

    Reputations:
    52
    Messages:
    225
    Likes Received:
    0
    Trophy Points:
    30
    Sweet some good news! Lets hope they send it by airplane and not by sailboat or something. :D

    Also if I don't get concrete news or upbeat news next week about the WSXGA shipments, I'm seriously considering the Macbook Pro. Yeah they are pricey, but man they are sexy!
     
  21. quick2k2ecotec

    quick2k2ecotec Notebook Consultant

    Reputations:
    19
    Messages:
    205
    Likes Received:
    0
    Trophy Points:
    30
    I must say I am glad I haven't ordered my IFL90 yet. I may wait and see what happens, and read some reviews before deciding which is ultimately the best: IFL90, G1S, C90, 1520, or the Vostro
     
  22. vipergts2207

    vipergts2207 Notebook Consultant

    Reputations:
    8
    Messages:
    113
    Likes Received:
    0
    Trophy Points:
    30
    I just cancelled my order from xoticpc about an hour ago. I decided to go with the 2.2ghz macbook pro. Although if I would have decided to stay with a pc I would have waited for the Compal to arrive.
     
  23. Ilovelamp

    Ilovelamp Notebook Consultant

    Reputations:
    52
    Messages:
    225
    Likes Received:
    0
    Trophy Points:
    30
    Thats what I think I'm gonna get too.
     
  24. Donsell

    Donsell Notebook Evangelist NBR Reviewer

    Reputations:
    163
    Messages:
    546
    Likes Received:
    0
    Trophy Points:
    30
    What did Justin tell you when you called to cancel? What is Compa or Bizcom telling him?
     
  25. P8ntbala

    P8ntbala Notebook Geek

    Reputations:
    1
    Messages:
    79
    Likes Received:
    0
    Trophy Points:
    15
    This is only pertaining to the wsxga still right? Is there a reason the WXGA+ is even farther off?
     
  26. Syntax Error

    Syntax Error Notebook Deity

    Reputations:
    481
    Messages:
    1,498
    Likes Received:
    0
    Trophy Points:
    55
    Sorry, I don't know what resolution this new shipment is in. :(
     
  27. iniquus

    iniquus Notebook Enthusiast

    Reputations:
    0
    Messages:
    43
    Likes Received:
    0
    Trophy Points:
    15
    I think anyone impatient who ordered a WXGA+ Compal IFL90 should just cancel.
     
  28. Tim

    Tim Notebook Virtuoso

    Reputations:
    2,752
    Messages:
    3,141
    Likes Received:
    2
    Trophy Points:
    106
    Yeah I agree. Think of it this way. We were told the WSXGA+ laptops would be in before the WXGA+ laptops. There was supposed to be a two week gap between the two. Well now that we are almost at the end of July without the WSXGA+ laptops yet, I think the WXGA+ laptops will be lucky if they come in by the end of August. (Remember this is all my opinion :))
    Tim
     
  29. osso002

    osso002 Notebook Evangelist

    Reputations:
    33
    Messages:
    419
    Likes Received:
    0
    Trophy Points:
    30
    This is shouting Lenovo T61 right now...
     
  30. John Stuart Mill

    John Stuart Mill Notebook Geek

    Reputations:
    11
    Messages:
    76
    Likes Received:
    0
    Trophy Points:
    15
    At least Compal stopped the line and didn’t allow the laptops to reach the market with faulty parts.
     
  31. Ilovelamp

    Ilovelamp Notebook Consultant

    Reputations:
    52
    Messages:
    225
    Likes Received:
    0
    Trophy Points:
    30
    IBM sent out laptops with faulty parts?! Wow that is really surprising. I always thought IBMs were really quality computers.
     
  32. ohmide

    ohmide Notebook Geek

    Reputations:
    4
    Messages:
    96
    Likes Received:
    0
    Trophy Points:
    15
    When IBM owned the Thinkpads, yes, very good quality. But since Lenovo took over things have been more and more fishy.
     
  33. John Stuart Mill

    John Stuart Mill Notebook Geek

    Reputations:
    11
    Messages:
    76
    Likes Received:
    0
    Trophy Points:
    15
    There were some issues with the lcd bezel creaking on the T61. People described it as having the plastic misaligned. It could be the same problem that compal stopped the lines for. They may share bezel suppliers.
     
  34. Mippoose

    Mippoose Notebook Deity

    Reputations:
    126
    Messages:
    885
    Likes Received:
    0
    Trophy Points:
    30
    When I said I levae the 22nd I meant of August. :p Thought I'd throw that out there.

    I really like the Compal IFL90 from what I've heard.

    Although the G1S will game better, BUT it looks like a Fisher Price toy, as I heard someone say before.

    A dell wouldn't be too bad, but I'd much rather deal with the so far extraordinary help at Powernotebooks rather than some indian fellow for Dell.

    The other ASUS models are ok, but no real Matte, or XP options.

    Macbook Pro's make me drool but I couldn't imagine paying 2400$ for somethign where I can get something with what I think are better specs for 1700$

    I'd adore a T61p.. But they aren't out yet, and plus they aren't much for gaming, which I do a moderate-high amount of when I'm bored.

    Plus I think the IFL90 is awesome looking, sold by awesome service, and a practical choice.


    So I think when it comes down to it, I'm just excited for my laptop and Compal knows how to keep the suspense.

    Only way I'd get aggravated really is if it arrives and has like 4 ridiculously placed dead pixels and has awful build quality and performance.

    But I would seriously doubt for that to happen. :p I mean all the suspense has to lead up to something good, eh? EH?

    :)
     
  35. osso002

    osso002 Notebook Evangelist

    Reputations:
    33
    Messages:
    419
    Likes Received:
    0
    Trophy Points:
    30
    Is this too much to ask for?
    T7300
    8600GT 256DDR3 @ 700Mhz
    WXGA+/WSXGA+ Matte
    Conservative, non-riced out look.
    -.- How come no one can make it?!
     
  36. Syntax Error

    Syntax Error Notebook Deity

    Reputations:
    481
    Messages:
    1,498
    Likes Received:
    0
    Trophy Points:
    55
    Well, the Compal IFL-90 has that look...

    Oh, wait, I'm preaching to the choir. :p
     
  37. vipergts2207

    vipergts2207 Notebook Consultant

    Reputations:
    8
    Messages:
    113
    Likes Received:
    0
    Trophy Points:
    30
    I cancelled it over email. I just gave him my name and order number and thats all. I'm not sure about your second question.
     
  38. sco_fri

    sco_fri Notebook Evangelist

    Reputations:
    75
    Messages:
    451
    Likes Received:
    0
    Trophy Points:
    30
    Asus V1-S has all that, but is priced at the G1S levels.... And also isnt here yet. :(
     
  39. Ilovelamp

    Ilovelamp Notebook Consultant

    Reputations:
    52
    Messages:
    225
    Likes Received:
    0
    Trophy Points:
    30
    The reason you listed for the Macbook Pro is the only reason I chose the IFL90 over it. It is so over-priced. But the funny thing is Apple charges ridiculous prices for its laptops and they still sell like hotcakes. I do like the real sleek look of the Macbook and OSX Tiger is a very good OS. I would have totally gotten a G1s if it didn't look like so gawdy. So I chose the Compal.

    Stupid bezel makers delaying our shipments. :mad:
     
  40. Ninjazn

    Ninjazn Notebook Consultant

    Reputations:
    28
    Messages:
    239
    Likes Received:
    0
    Trophy Points:
    30
    I ordered on June 27th and I'm praying I get mine by August 13th. The wait so far is killing me, but I leave for vacation this Sunday and I'll be gone for 3 weeks so that will take my mind off of the long weight times for the Sager 2090. Hopefully when I get back, I'll have my Sager in my hands a day or two later.
     
  41. Ilovelamp

    Ilovelamp Notebook Consultant

    Reputations:
    52
    Messages:
    225
    Likes Received:
    0
    Trophy Points:
    30
    I'm hoping by July 31st, but it seems fairly unlikely right now...
    ordered back on June 6th...
     
  42. Donald@Paladin44

    Donald@Paladin44 Retired

    Reputations:
    13,989
    Messages:
    9,257
    Likes Received:
    5,843
    Trophy Points:
    681
    Ok, so I am going to double post...shoot me if you like but here is our official announcement:

    "We just received our first shipment of the WSXGA+ (1680x1050) screens, but we only got a very few. We now expect we will receive yet another shipment next week and hopefully all pre-orders will ship by the end of July or at the latest in early August."

    Sager received their first few as well, and they also hope to maintain the same shipping schedule as ours.
     
  43. osso002

    osso002 Notebook Evangelist

    Reputations:
    33
    Messages:
    419
    Likes Received:
    0
    Trophy Points:
    30
    *shoots Donald...*
     
  44. Tim

    Tim Notebook Virtuoso

    Reputations:
    2,752
    Messages:
    3,141
    Likes Received:
    2
    Trophy Points:
    106
    Now how are we supposed to get our laptops. :mad: ;)
    Tim
     
  45. Kdawgca

    Kdawgca rotaredoM repudrepuS RBN

    Reputations:
    5,855
    Messages:
    8,609
    Likes Received:
    2
    Trophy Points:
    206
    Don't worry we would still have Kenny(CS rep). Besides everyone know that Kenny is the only one at PowerNotebooks that actually works ;)
     
  46. Mippoose

    Mippoose Notebook Deity

    Reputations:
    126
    Messages:
    885
    Likes Received:
    0
    Trophy Points:
    30
    Messed up!

    ;)
     
  47. Vagabondllama

    Vagabondllama Notebook Consultant

    Reputations:
    30
    Messages:
    297
    Likes Received:
    0
    Trophy Points:
    30
    Seriously. Would that be so difficult? No, I don't think it would >_> But apparently that's not the case.