The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.
Problems? See this thread at archive.org.

    Shortage of M2's?

    Discussion in 'Toshiba' started by FlyInBack, May 23, 2004.

  1. FlyInBack

    FlyInBack Notebook Enthusiast

    Reputations:
    3
    Messages:
    29
    Likes Received:
    0
    Trophy Points:
    5
    I was wondering if there is a possible shortage of the Tecra M2's. I notice that on their site the price has gone up quite a bit (as this has been mentioned before), you can only 'customize' 2 of the 'pre-setups' (you used to be able to do it with almost all of them, even though you could get the same system no matter which you clicked).

    The other big thing I noticed was that on some retailer sites, the shipping time for the M2 was 2+ weeks. Sounds weird to me.

    Anyone know of a shortage or manufacturing issue?