The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.
Problems? See this thread at archive.org.
← Previous pageNext page →

    The Official M9750 Owners Lounge

    Discussion in 'Alienware' started by Xplane, May 17, 2007.

  1. omino-ukg

    omino-ukg Notebook Geek

    Reputations:
    0
    Messages:
    84
    Likes Received:
    0
    Trophy Points:
    15
    Well I haven't been told of any backordered items so far so fingers crossed :)
     
  2. LAPU-LAPU

    LAPU-LAPU Notebook Guru

    Reputations:
    0
    Messages:
    56
    Likes Received:
    0
    Trophy Points:
    15
    you should try calling them or as xpbballx99 was saying, email them about your status.....their website is way off in terms of order status accuracy.....I was on phase 3 for almost 3 weeks (or so the AW website say) but when I called them this morning, CS told me that my order is in phase 8 and that I should be receiving a shipping confirmation anytime soon :cool: that's what I'm talking about.......you should have yours soon.
     
  3. xpbballx99

    xpbballx99 Notebook Consultant

    Reputations:
    9
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    Hi, Just Wondering but... im running xp on my m9750 and i know like xp doesent support core 2duo and there is a fix for it now but i was wondering if alienware does it already? cause like as i looked and caculated fps and everything it seems like both cpu are working.
     
  4. omino-ukg

    omino-ukg Notebook Geek

    Reputations:
    0
    Messages:
    84
    Likes Received:
    0
    Trophy Points:
    15
    Well I followed your advice Lapu and called customer services. Looks like my order is still in phase 4 as per the webiste but I should be going into phase 5 very soon. They said once I've entered phase 5 it should go very quickly so I should have the laptop 5-7 business days from entering this stage. :)
     
  5. Charles P. Jefferies

    Charles P. Jefferies Lead Moderator Super Moderator

    Reputations:
    22,339
    Messages:
    36,639
    Likes Received:
    5,052
    Trophy Points:
    931
    No OEM does the fix - you have to do it yourself. Find it here:
    http://forum.notebookreview.com/showthread.php?t=60416
     
  6. xpbballx99

    xpbballx99 Notebook Consultant

    Reputations:
    9
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    Ok chaz il go ahead and do it but i was getting 85 fps in battlefield 2 is that possible even with no multi cpu? single card to. his chart shows him getting 90 fps as i get close to that.
    and the task manager thingy 2 of the cpu box react when playing games and stuff.
     
  7. Charles P. Jefferies

    Charles P. Jefferies Lead Moderator Super Moderator

    Reputations:
    22,339
    Messages:
    36,639
    Likes Received:
    5,052
    Trophy Points:
    931
    It's not like you are going to have bad performance if you do not have the patch installed. Make sure you read that thread to understand why it is important to install the patch.
     
  8. magictomcat

    magictomcat Notebook Guru

    Reputations:
    0
    Messages:
    66
    Likes Received:
    0
    Trophy Points:
    15
    I bought mine on june 27th for my birthday...
    and they kept saying "we dont have the 250gb HDD" or the screen or anything else...
    but know...i've got the tracking number!!!!!!!!!!!!!!!!!

    still,alienware is supposed to be very high end and I expect a high end customer service..(even dells is better)

    by the way,how can i install xp if i dont have a floppy drive?
     
  9. jameskirstylou

    jameskirstylou Notebook Enthusiast

    Reputations:
    96
    Messages:
    34
    Likes Received:
    0
    Trophy Points:
    15
    load the drivers onto your xp cd :) or use a isb floppy
     
  10. Vitotherm

    Vitotherm Notebook Consultant

    Reputations:
    18
    Messages:
    179
    Likes Received:
    0
    Trophy Points:
    30
    Ordered mine 29-06-2007 but still it is on fase 4

    what de f.. is happening

    UK order
     
  11. Vitotherm

    Vitotherm Notebook Consultant

    Reputations:
    18
    Messages:
    179
    Likes Received:
    0
    Trophy Points:
    30
    There will be a slight delay in processing your Alienware order because the part(s) listed below are temporarily backordered. We apologise for any inconvenience this may cause and assure you that we are doing everything in our power to expedite the process of obtaining the part(s). Once the part(s) have been obtained, your order will be processed.

    1- AREA-51 M9750 17" WUXGA W/ CAM BLACK ........................ Expected Date: 7/31/2007

    Thats why....

    Just keep on waiting.
     
  12. Charles P. Jefferies

    Charles P. Jefferies Lead Moderator Super Moderator

    Reputations:
    22,339
    Messages:
    36,639
    Likes Received:
    5,052
    Trophy Points:
    931
    It seems like the screens are holding up a lot of notebook orders, and not only Alienware's. I waited four weeks for my ThinkPad to arrive because of screen problems.
     
  13. xpbballx99

    xpbballx99 Notebook Consultant

    Reputations:
    9
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    Ya Not suprised i waited cause of screen to :( But Remember that phase 4 will be the longest wait out of the build process once past phase 4 expect to see the notebook within a week. :D
     
  14. omino-ukg

    omino-ukg Notebook Geek

    Reputations:
    0
    Messages:
    84
    Likes Received:
    0
    Trophy Points:
    15
    UK order here to though I ordered mine on the 10/07. I'm also still on phase 4 but as my ordered date is nearly two weeks after yours I hate to think when mines going to arrive.... Oh the agony :rolleyes:
     
  15. kavoth

    kavoth Notebook Enthusiast

    Reputations:
    3
    Messages:
    15
    Likes Received:
    0
    Trophy Points:
    5
    Hello,

    I ordered the m9750 7/3/2007 and have been at Phase 3 since 7/5. When I ordered they had the expected ship date as 8/3..........who knows if this is going to happen since I confirmed on 7/31 that it was still at Phase 3.

    I am not going to be doing any heavy gaming but will be using it more for graphics and video applications. It is probably overkill for what I will be using it for but I liked the reputation for AW, wanted a notebook that will give me plenty of good years performance and have not had good experiences with Gateway or HP notebooks. And - lets be honest here - it is a beautiful looking machine! :p Unfortunately, at this point I am wondering if I should just cancel and go with a Sony VAIO or a high end Dell notebook.

    Also, I am questioning my decision to stay with WindowsXP Media edition. Should I just take the leap to Vista now? I figure if I stay with the AW there is plenty of time to make that change since it doesn't seem like they are in any hurry to start the build. :rolleyes:

    Basically - this is taking soooo long that I have been given plenty of time to question my purchase.... :(
     
  16. triplesosirus

    triplesosirus Notebook Guru

    Reputations:
    0
    Messages:
    54
    Likes Received:
    0
    Trophy Points:
    15
    Can those who care tell me whether they prefer windows vista or windows xp, and why? Also if I were to get SLI cards does windows vista suppose this? Also would I have to go through the steps to update my drivers so both cpus are being used like you would with xp as it was previous described earlier. Thank you all!
     
  17. xpbballx99

    xpbballx99 Notebook Consultant

    Reputations:
    9
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    I got windows xp. And ya its an easy fix for the dual core for xp might take a minute or 2. I didnt notice a diffrence since 85 fps playing battlefield 2 is plenty and a few extra fps i didnt notice it so its a fix that you either wanna do or not have to do.

    Why did i choose Xp? Well Xp is 100% workable without any problems. Vista is still needs some work to fix alot of the problems Personally when i need vista ill just go and buy it i say probly 70% of the people are still using xp lol. personally i like vista its something new but just not in the need for it right now.

    SLI if you ment 2 cards work on vista? i think they released a fix for this can't confirm. if not 1 card is crazy enough while the fix comes.
     
  18. Edubardus

    Edubardus Notebook Guru

    Reputations:
    2
    Messages:
    66
    Likes Received:
    0
    Trophy Points:
    15
    they did release a driver but it's not working very well. I believe it's a BETA driver? someone posted a few pages back about it and how they has tested it and whatnot.
     
  19. Mippoose

    Mippoose Notebook Deity

    Reputations:
    126
    Messages:
    885
    Likes Received:
    0
    Trophy Points:
    30
    Wow. It really does seem alot of laptops are getting out slow due to screen problems.

    Any chance it may be the same reason the IFL90's are being slow to come from Compal?
     
  20. omino-ukg

    omino-ukg Notebook Geek

    Reputations:
    0
    Messages:
    84
    Likes Received:
    0
    Trophy Points:
    15
    Oooh my order has jumped from Phase 4 back to Phase 3 :eek:

    From the posts I've read in the past this could be a good thing meaning that my order is going to progress, I really hope so. I'm getting a tingle of excitement :D
     
  21. omino-ukg

    omino-ukg Notebook Geek

    Reputations:
    0
    Messages:
    84
    Likes Received:
    0
    Trophy Points:
    15
    I've moved to phase 5 :D :D :D
     
  22. Vitotherm

    Vitotherm Notebook Consultant

    Reputations:
    18
    Messages:
    179
    Likes Received:
    0
    Trophy Points:
    30
    I hope you have it soon now, to kick some games.

    I keep on waiting...

    Got this mail from Alienware today,
    Again a delay on my M9750

    There will be a slight delay in processing your Alienware order because the
    part(s) listed below are temporarily backordered. We apologise for any
    inconvenience this may cause and assure you that we are doing everything in
    our power to expedite the process of obtaining the part(s). Once the part(s)
    have been obtained, your order will be processed.

    1- AREA-51 M9750 17" WUXGA W/ CAM BLACK ........................ Expected
    Date: 8/10/2007


    i called yesterday Alienware, and a sales guy told me next week my system is ready a few ouhrs later got this message.
     
  23. xpbballx99

    xpbballx99 Notebook Consultant

    Reputations:
    9
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    Nice finally glad you are moving along :D
     
  24. xpbballx99

    xpbballx99 Notebook Consultant

    Reputations:
    9
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    Ahhhh Well it's hard or to believe what they say :p cause i got those messeges to before i got mine and i ended up moving a phase) i think its an auto mated messege they just randomly send to everyone. I dont even think the sales agents that we email confirm anything right as they look on what we look the phase page lol. But i don't know if they might do those backordered items to gain time or what but ya. alot of backordered items they got.
     
  25. Charles P. Jefferies

    Charles P. Jefferies Lead Moderator Super Moderator

    Reputations:
    22,339
    Messages:
    36,639
    Likes Received:
    5,052
    Trophy Points:
    931
    In the sales people's defense, they probably had no idea there was going to be a delay so he told you what he thought was reasonable. Alienware, like many other large companies (*cough*Lenovo*cough*) does not have very good communication between the sales and the building departments.
     
  26. JSC

    JSC Notebook Enthusiast

    Reputations:
    16
    Messages:
    11
    Likes Received:
    0
    Trophy Points:
    5
    Messages like this are good - they mean that the company is complying with FTC Mail/Fax/Weborder 30-day rules.
     
  27. mikemagri

    mikemagri Notebook Enthusiast

    Reputations:
    2
    Messages:
    15
    Likes Received:
    0
    Trophy Points:
    5
    I just got my memory and installed it today (2x2gb)
    only problem is that windows shows 2559mb.
    I was ok with what everyone saying it would only see 3.5gb but 2.5gb,what happened?
    any help?
     

    Attached Files:

  28. Charles P. Jefferies

    Charles P. Jefferies Lead Moderator Super Moderator

    Reputations:
    22,339
    Messages:
    36,639
    Likes Received:
    5,052
    Trophy Points:
    931
    You may only be seeing 2259MB due to a limitation of the chipset. Most manufacturer's sites state how much RAM your computer can see if 4GB is installed. I suggest emailing Alienware and asking them.
     
  29. mjl2142

    mjl2142 Notebook Evangelist

    Reputations:
    16
    Messages:
    494
    Likes Received:
    0
    Trophy Points:
    30
    Your forgetting the Video Cards, they count to the 3.5 GB Limit, and you have SLi, which means you lost out in that department.
     
  30. triplesosirus

    triplesosirus Notebook Guru

    Reputations:
    0
    Messages:
    54
    Likes Received:
    0
    Trophy Points:
    15
    Does anyone have good options of a cooler for the alienware 9750/9700 laptops. I have been looking and done know what will help it out the most. Will simply elevating the laptop improve temperatures or having fans.

    Does anyone have something substantial about the ram and how you can fix this?
     
  31. Sequoia225

    Sequoia225 Notebook Deity

    Reputations:
    109
    Messages:
    704
    Likes Received:
    0
    Trophy Points:
    30
  32. Charles P. Jefferies

    Charles P. Jefferies Lead Moderator Super Moderator

    Reputations:
    22,339
    Messages:
    36,639
    Likes Received:
    5,052
    Trophy Points:
    931
    The RAM is probably a chipset limitation. You might try asking in the Hardware forum about it to get a clearer answer.

    Yes elevating the back of the laptop will help your temperatures. The best cooler for a 17" notebook is the Zalman NC1000.
     
  33. triplesosirus

    triplesosirus Notebook Guru

    Reputations:
    0
    Messages:
    54
    Likes Received:
    0
    Trophy Points:
    15
    Ok so I am getting ready to buy the 9750, but I just keep thinking that once I buy it, it will be a matter of weeks after that the 8800m will be released. I just can't get myself to submit the final order because this thought just keeps circling my mind. Does anyone have any real proof when this card is going to be released. No offense, but "I think it will be released on this day...." doesn't really help me out. I need to know what the word is among the industries and if there is a legitimate estimation when this card is going to come out. THank you all!
     
  34. triplesosirus

    triplesosirus Notebook Guru

    Reputations:
    0
    Messages:
    54
    Likes Received:
    0
    Trophy Points:
    15
    Also, if I upgraded...say from a single 9750 to dual 8800m, how long does that take to upgrade (shipping, installing, testing, shipping back, etc)
     
  35. Sequoia225

    Sequoia225 Notebook Deity

    Reputations:
    109
    Messages:
    704
    Likes Received:
    0
    Trophy Points:
    30

    Youre not going to get it. (proof that is) I wouldnt even say you have proof if some Alienware rep got on here and said its coming next Tuesday. You just have to decide to jump in or wait till those cards are available and leave it at that. Ive followed these industries and releases and the day you really know something will be here, is the day it is. Few exceptions are those things with very anticipated releases by masses, like the Iphone, Playstation 3, etc.

    And if you decide to wait, well, by the time they come out, there may be some better laptop out, maybe even by Alienware. Which could be a good thing. But then by that time, youll know about some other new component that may be offered in that laptop if you just wait a month, not to mention when something does just come out, theres a ton of people getting it so you have to wait cause "stock is backordered" etc. So the cards may come October 15th, then you order your computer from Alienware, and if you want THOSE video cards, then it pushes back your ship time 15 days or a month. And so you stick it out, then in that 30 extra days, Alienware announces a new laptop with Santa Rosa and the extreme chip and those same great video cards, for roughly the same price.


    Get my drift?

    d
     
  36. triplesosirus

    triplesosirus Notebook Guru

    Reputations:
    0
    Messages:
    54
    Likes Received:
    0
    Trophy Points:
    15
    it's just a never ending quest...I guess that's just how technology is going to be. Honestly at this point, I just want a SLI DX10 card....couldn't really care on processors. Anyhow; Sagar computers is supposedly saying the 8800m's are going to be "available" in about two weeks. http://forum.notebookreview.com/showthread.php?t=137521&page=15

    oh well, I give up...I will give it two more weeks and then that's it. Time to purchase and get it over with.
     
  37. triplesosirus

    triplesosirus Notebook Guru

    Reputations:
    0
    Messages:
    54
    Likes Received:
    0
    Trophy Points:
    15
    Is there a huge difference between 667 mhz FSB, 800 mhz , and 1066mhz. Alienware offers 667, but obviously as we all know by now, some companies are offering up to 1066. Is this much better and more importantly, practical. From what I understand the laptops are using desktop processors...is this any good for laptops in terms of durability and having this laptop last you for years?
     
  38. xpbballx99

    xpbballx99 Notebook Consultant

    Reputations:
    9
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    i don't see why wait for new cards. 100% of the people are still gonna play with there current cards and not upgrade. The 7950 gtx card is a powerful card and i dont see any games out running a 7950 gtx.
    Alienware Builds Notebooks/desktops that will make sure they last you years into gaming. the proccessor doesent hurt the labtop at all its made for labtops.

    95% of the games are still made for dx9 and i don't think they would just switch to dx10 only as not many people will have or want to buy.

    you gotta remember games are still a long while off of catching up to our m9750. Flight simulator x is hard to run. But i run it all high settings with 20fps witch is great and i don't see any other games gonna give us difficulty like that.

    Just like ps3 or xbox360 you cant just go and upgrade after buy. its ment to handle games for years just like the m9750.
     
  39. triplesosirus

    triplesosirus Notebook Guru

    Reputations:
    0
    Messages:
    54
    Likes Received:
    0
    Trophy Points:
    15
    Yeah that's true xpbballx99, you really can't just go and upgrade a ps3 or xbox, but you can always upgrade a computer whenever you want (unless you are up to date with ALL the tech). I am looking for a computer that is going to last me for the next four to five years, and I am sure by then all games will be DX10. Sure there will be dx9 games, but what good is that in five years. Dropping $4000 or so isn't easy at all, especially when you purchase your own computer. So this turns into an investment. Just like any investment you still want to see it running at full strength down the road. Since the world is slowly making that jump into DX10, it becomes very important to protect that investment. Sure things are always changing and improving and you really can't always get the best things possible. The main things is that no one really knows the capabilities of DX10 yet. It's all about being right along the industry as they explore DX10 cards (not just for gaming). I assure you that "100%" of people not upgrading is a bit extreme. Anyhow, I can go on and on about this issue. What it comes down to is that it's a smart idea or get a DX10 card if you are going to be using a computer for more then three years. Then again it's always going to be a difference of opinions. In the meantime I think I will just wait until something newer and better comes out for alienware laptops.
     
  40. Vitotherm

    Vitotherm Notebook Consultant

    Reputations:
    18
    Messages:
    179
    Likes Received:
    0
    Trophy Points:
    30
    That's right,

    like xpbballx99 and sequoia225 are telling..

    Read a little about it on this forum, all answers are there.

    i was thinking about a NP9260 a very strong notebook but if you look at he charger on that one, and also weight of the system.........not very nice to travel. you have to make decicions in life.

    And the M9750 its a laptop with balls, for gaming, multimedia, and for a long time.........
     
  41. omino-ukg

    omino-ukg Notebook Geek

    Reputations:
    0
    Messages:
    84
    Likes Received:
    0
    Trophy Points:
    15
    Sorry to lower the intellectual tone of conversation but my order has just moved to phase 6 :D :D :D

    It's getting so close now I can almost smell the thermal compound on the CPU.. Mmmm ;)
     
  42. omino-ukg

    omino-ukg Notebook Geek

    Reputations:
    0
    Messages:
    84
    Likes Received:
    0
    Trophy Points:
    15
    I'm on phase 9, it's shipped :eek:

    I haven't been contacted for a delivery date as yet, what is the normal delivery time is it two days? I need to book a day off work to be home to receive it.
     
  43. Vitotherm

    Vitotherm Notebook Consultant

    Reputations:
    18
    Messages:
    179
    Likes Received:
    0
    Trophy Points:
    30
    That's great men...

    have fun with it :wink:

    it means there are new big screens on stock :D
    mine should be there also soon.
     
  44. omino-ukg

    omino-ukg Notebook Geek

    Reputations:
    0
    Messages:
    84
    Likes Received:
    0
    Trophy Points:
    15
    Thanks Vitotherm. I'll keep my fingers crossed you get it soon too :smile:
     
  45. xpbballx99

    xpbballx99 Notebook Consultant

    Reputations:
    9
    Messages:
    181
    Likes Received:
    0
    Trophy Points:
    30
    Nice you be getting yours s00n :D

    oH and didnt mean to really put 100% of people not upgrading i ment it in a way where people who just got there computer are not gonna spend money again upgrading. And same for people who are enjoying there notebooks/desktops without any problems. i Don't know about you but im not that person who buys every game that comes out i look mostly for war games as they are my favorite. and i can tell you games like battlefield 2 and 2142 have tons and tons of people playing them. and pretend something came out (wargame) for dx10 i wouldent really see anyone moving from there favorite game to a new game that just is dx10. i can gaurantee that you won't see any updates on it in about3+ years or more. as its still in the very very early stages) even if you do get dx10 card no games really out there to use it.} But its up to you just giving you my point of view :). tsk tsk just like vista and 70% of people went back to xp to out to early.
     
  46. Sequoia225

    Sequoia225 Notebook Deity

    Reputations:
    109
    Messages:
    704
    Likes Received:
    0
    Trophy Points:
    30
    Hey, can you tell me what your original shipping date was and how different this is from that date. Like if its earlier, how much earlier....

    hoping I will get mine earlier than the Sept 5th date they gave me.


    d
     
  47. omino-ukg

    omino-ukg Notebook Geek

    Reputations:
    0
    Messages:
    84
    Likes Received:
    0
    Trophy Points:
    15
    Hi,

    Actually my original ship date was the 01/8 so my delivery is a little late. This was because my order was delayed due to payment issues, 10 days to be exact. To be fair though as soon as my order went to phase 4 its only taken around 9 days till the shipping date today. So you may be pleasntly surprised. :)
     
  48. Sequoia225

    Sequoia225 Notebook Deity

    Reputations:
    109
    Messages:
    704
    Likes Received:
    0
    Trophy Points:
    30

    I hope so. I cant believe how impatient Ive become now that Ive ordered and paid. It hasnt been a week and I feel its been a month.....
     
  49. omino-ukg

    omino-ukg Notebook Geek

    Reputations:
    0
    Messages:
    84
    Likes Received:
    0
    Trophy Points:
    15
    I know exactly where you're coming from, these last 4 weeks have felt like year. :(

    I just hope that it lives up to my expectations but from everyone's input on these forums I'm sure it will do. Anything has to be better than what I'm using at the moment, I've come close to throwing this laptop out of the window from frustration twice this week. Delivery day can't come soon enough :rolleyes:
     
  50. Phritz

    Phritz Space Artist

    Reputations:
    68
    Messages:
    1,276
    Likes Received:
    0
    Trophy Points:
    55
    The Spped in the Clevo D900C stems not from the faster FSB, but from the fater processors (Intel Core 2 Extreme), as for Stanta Rosa vs. Napa - the FSB speed increase doesn't make a notable difference, only real advantage is the support for newer processors and 4GB RAM
     
← Previous pageNext page →