Thanks for the update; maybe I'll also be as fortunate!
-
good news @Traveller888, still waiting for mine to change from in production, hopefully tomorrow.
UK
ordered 31/10
1st edd 18/11
currrent edd 26/11
1 impatient future owner
xps 17, i5 460. -
Hi Dave,
I would suggest nagging your customer rep to expedite your order. I made a good few calls to voice my frustration with Dell and the continued delays. They then mentioned that my order has been approved for higher priority - good luck! -
Seems to be pot luck on the quality of English speaking adviser you get as well.
Would also appreciate your thoughts on the screen when you get it after reading some of the comments on here.
Coming from a 3 year old budget 17 inch Acer so expecting great improvements to what im used to. -
As the sig, I've also had an update;
Replacement order placed 28/10 EDD 22/11
New EDD of 29/11
Order Cancelled 19/11
Order Re-Placed 19/11 New EDD 17/12
Not one email received, emails to support say order has been expedited (this is before the order was cancelled!). Will try another email. -
Looks like my XPS 15 will be delayed as well
(I am in Australia).
I ordered back on November 11. My order status was "Work in progress" with an EDD of 1 December 2010, but I just checked the Dell site this morning and the order status now says: "We have received your order. It may take up to 3 business days for your estimated delivery date to be available". So it looks like they have cancelled my order and reordered
My basic specs were:
1 T510710AU-XPS™ L501X 1
2 XPS L501X 1
3 Intel® Core™ i7-840QM Processor (1.86GHz, 4Core/8Threads, turbo boost up to 3.2Ghz, 8M cache) 1
4 15.6 FHD (1920x1080) B+RGLED display with TrueLife™ 1
5 Design Studio Featuring 100+ Designs 1
9 Intel Wireless Driver(6200/6300) 1
14 System Documentation (English) 1
16 8GB Dual-channel 1333MHz DDR3 SDRAM (2 x 4G) 1
17 640GB 7200RPM SATA Hard Drive 1
18 Tray Load Blu-ray BD-ROM / DVD + /-RW Combo Drive 1
21 Power Cord (ANZ) 1
22 130W AC Adapter 1
23 9 Cell Primary Battery 1
25 2GB NVIDIA® GeForce® GT 435M graphics 1
26 Waves MaxxAudio V3.0 audio enhancements software 1
27 TV Tuner Bezel 1
28 TV Tuner 1
29 Intel Wireless Network Card 6300 1
30 Dell™ Wireless Bluetooth Internal mini-card 1
31 Dell™ Backlit Keyboard with Touchpad (English) 1
32 Windows(R) 7 Label 1
33 Genuine Windows(R) 7 Home Premium 64bit (English) 1
34 Microsoft Patch for WIN7 1
35 Windows(R) 7 Home Premium COA Label 1
36 Genuine Windows(R) 7 Home Premium 64bit (English) DVD Media 1
Zarr suggested in another thread that the 6300 wifi was not compatible with lid design art, however I was able to order back on 11 November and include both those things. My guess is probably the 6300 has held things up. If I dont receive an email by late this afternoon, I might flick an email to the lady I ordered through and see where things are at and why the delay. Will let you know. -
New Update!
Order has gone from 'In Production' back to 'Order Received' again, no EDD - More delays!
Did get a reply to an email I sent off explaining that there were parts shortages which means the order is not valid, must be re-placed an so on, all standard procedure - no explanation to what parts they were short on. -
Mine has now changed to shipped!
-
Congrats Dave! Mine's been at "Departed Man. Facility" since yesterday...hope to see an update soon.
-
I ordered mine on 11/06 and it finally shows that it's shipped, but there's no tracking number... I called this morning to see if they even had a tracking number available, and I was told it was an error in their system and to check back in 24-48 hrs... Shows an estimated delivery of 12/03... So who knows at this point...
-
-
It shipped Fedex... I'm going to check it again in the morning
-
The system in my sig is supposed to ship out today. Still no change from in production, and the edd is still tomorrow... at what point during the day does an order typically show up as shipped?
-
my order has shown 'shipped' state 8 hours after I already held it in my hands =) . You can call support line and it will provide you with latest data
-
Thanks
-
1-800-624-9897
You can also call the automated order status line and then connect with a representative after it gives you your order status:
1-800-433-9014
And here is the technical support line:
1-877-293-1197 -
-
Thanks for the numbers. According to the recorded voice, my laptop was shipped on December 6.
Back to the future.
The online status of the order is still In Production. It's only been in that status eight or nine days, but it's hard to be patient.
-
-
-
I got the psychic order status hotline as well.
Say's mine was shipped on November 26th and received on November 29th,
which is my scheduled EDD date.
Right now is November 22nd at 7:42pm. -
My order showed modified but not cancelled on Nov.19, which was the stimated second edd after the first order was modified. I called dell today to find that it had been cancelled. I'd to swallow my pride and accept to create other order with edd Dec. 15 - 20, because I payed with bank deposit and missed all the local retailer's offers. If things go right, I'll receive my laptop two months after I made the order.
I wished I had bought that Toshiba that I had checked before ordered this dell.
-
Only bad thing was that I was planning to go shopping tomorrow (in preparation for the Thanksgiving holiday in the U.S.). Now, I'll have to stay home and wait for the delivery. Not that I'm complaining! -
-
-
I followed the Tracking number on the Fedex site and it left the
Chicago Facility at 12:12am this morning and is scheduled
to be delivered to my house tomorrow. -
Well, mine has been showing shipped since Nov. 18th, and there still isn't a tracking number. Still says NA on the site. I've called and it tells me the same thing... Good grief... How long did it take for the site to show fedex tracking number for you guys that finally got a tracking number?
-
Ordered: October 31, 2010
First EDD: November 29, 2010
Made phone call got it bumped up: November 23rd, 2010
Third EDD: Bumped back to November 29, 2010 by DELL
Actual ship date: November 22, 2010
Estimated arrival date: November 24th, 2010 -
Does anyone know if the engineering hold has been lifted yet, please? Thank you.
-
you'd better call Dell and ask them directly
-
Has anyone from Latin America received their XPS yet??
-
-
Mine just shipped (FedEx)
XPS 15 (Core i5 560)
Location: CA USA
Order Date 11/09
EDD: 12/09
2 hours ago, my Dell sales rep called and informed me that my order would ship on Friday. -
Mine UK
has arrived in the uk and is out for delivery from manchester, hope to receive today
xps 17 (i5 460 / 435m)
ordered 31/10
original edd 18/11
revised edd 26/11
shipped 22/11
@traveller, has ues been delivered yet? -
Morning Dave,
Mine's at Dartford right now - should arrive today, but I'll be at work so might not be able to sign for itLet me know if you're happy with yours though!
-
Anyone from India?
I was told i will receive in a week but i really doubt it -
@tejagamer
My delivery date changed from 16 dec to 1st Dec ..status shows "In Transit" so hopefully gonna get it in 2 more days \m/ -
^^SO fast?
Wow
When did it change dude? -
changed on 22nd ...feeling luckier now
. Order date was 8th Nov though.
-
mine still on 16th dec
i hate to wait more -
I just got mine today!!
In Texas.
Ordered: Nov 1
EDD: Dec 7
Received: Nov 24
Just in time for the holidays! -
I ordered an XPS 17 on 26/10. The initial EDD was 22/11. A week ago it was delayed until 29/11....and now it has been delayed a second time until 10/12. If it's delayed one more time I'm cancelling and going somewhere else.
Config below:
1 224-9959 XPS 17
1 317-5824 Intel Core i5-560M 2.66GHz / up to SC 3.2GHz / 3M
1 317-5610 8GB,DDR3,2 DIMM
1 331-0644 Backlit Keyboard - English (Internal)
1 318-0188 NVIDIA GeForce GT 435M 1GB graphics with Optimus
1 342-1857 1.0TB 500GB 7.2k HDD x 2
1 318-0184 Anodized Aluminum WLAN L701X
1 318-0189 17.3 in HD+ WLED TL (1600x900)
1 421-1366 Genuine Windows 7 Professional, 64bit, English
1 318-0151 Tray Load Blu-ray Disc BD-Combo (Reads BD and Writes to DVD/CD)
1 318-0138 JBL 2.1 Speakers with Waves Maxx Audio 3
1 430-3909 Intel Centrino Ultimate-N 6300
1 312-1116 92 WHr 9-cell Lithium Ion Primary Battery -
Was supposed to receive mine yesterday... big surprise... no computer! Got an e-mail yesterday morning saying that my order had been delayed and the new EDD was November 30. Called Dell Customer Care and the rep indicated it was in production and should be completed in three business days. But then she informed me that the whole XPS series has a 45 day delay, not sure what that means, but I'm sure hoping they make the new EDD.
-
-
@nk290 and Preston5280
Looks like the culprit may be the 6300 availability. I have an EDD for Nov 25, but received an email from Dell yesterday advising that delivery has been delayed. No new EDD was given. -
-
-
I suspect the 6300 also, because it is no longer offered (and hasn't been for quite a while) as an option on most Dell sites around the world. -
-
Apparently, everything is looking fine for me! The new re-revised EDD is sooner than the original EDD and revised EDD
New XPS Production Delays
Discussion in 'Dell XPS and Studio XPS' started by Traveller888, Nov 16, 2010.