The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.
Problems? See this thread at archive.org.
 Next page →

    The OFFICIAL Studio XPS 1647 Intel Core i3/i5/i7 (Dual Core) Order Status Thread

    Discussion in 'Dell' started by extide, Jan 7, 2010.

  1. extide

    extide Notebook Deity

    Reputations:
    296
    Messages:
    701
    Likes Received:
    0
    Trophy Points:
    30
    Hey all, I hope I am allowed to make a thread like this!

    So, this thread is for all the SXPS 1647 owner's to post when they ordered, status updates only, and when received etc.....Basically this is a thread for Order Status (and all included w/in the thread title)

    Please try to keep a similar format to the other threads.

    Here is the info I have:

    Ordered On: 1/7/10

    Model info: Obsidian Black / XPS 1647 / Intel Core i7-620M / 8GB / 256SSD / RGBLED

    Estimated Ship Date: ?
    Estimated Delivery Date: 2/1/2010
    Revised EDD: 1/14/2010

    Order Status: Pre Production / Work In Progress (it shows different on different pages..?) (1/7/10)
    Order Status: In Production (1/8/10)
    Order Status: Shipped (1/12/10)

    My Location: SLC, UT

    Updates: on delays, etc......
     
  2. tigereat

    tigereat Notebook Consultant

    Reputations:
    6
    Messages:
    252
    Likes Received:
    0
    Trophy Points:
    30
    Would like to know if it comes with 90W adapter? Can you ask the Dell rep?

    Also, when you get it, please show me the inside of this laptop if you really dont mind. just Would like to know if there is anything changing from 1645 (eg.. bigger fan, rearrange the hardwares' position)

    Thanks
     
  3. loco_stevie

    loco_stevie Notebook Enthusiast

    Reputations:
    0
    Messages:
    15
    Likes Received:
    0
    Trophy Points:
    5
    It's most likely 90 watt adapter since it'sdual core since, the i7 620 is dual core not quad core.
     
  4. extide

    extide Notebook Deity

    Reputations:
    296
    Messages:
    701
    Likes Received:
    0
    Trophy Points:
    30
    I dont know for sure what adapter it comes with, it doesn't seem to show up in the list of parts. I will pop it open when i get it and take some pics.

    EDIT: ugh I just noticed that THIS screen is listed on my order status page:
    Premium FHD WLED Display, Obsidian Black, 2.0 MP Webcam

    When I selected, and paid for, the RGBLED screen. I am on the phone waiting for a rep right now, hopefully this doesn't become a big problem. I will also ask them about the 90w/130w power supply.
     
  5. daraj

    daraj Notebook Deity

    Reputations:
    30
    Messages:
    701
    Likes Received:
    0
    Trophy Points:
    30
    You have the rgbled screen because it says premium.
     
  6. extide

    extide Notebook Deity

    Reputations:
    296
    Messages:
    701
    Likes Received:
    0
    Trophy Points:
    30
    Okay, so this seems to be correct, they said that there is a 'full description' that they can see internally, where it does show up as the RGBLED screen. The reps I was talking to weren't sure whether it would be a 90w or 130w adapter, but to be honest it's not a huge issue for me as 99% of the time I won't be playing games and stressing the GPU along with the CPU. I can procure a 130w power supply if it doesnt come with one and I happen to need one. I already have like 2-3 90w ones, and even a 65w travel one. I wonder if it will even run at all on that sucker ;)
     
  7. daraj

    daraj Notebook Deity

    Reputations:
    30
    Messages:
    701
    Likes Received:
    0
    Trophy Points:
    30
    how much did it cost you if I may ask?
     
  8. extide

    extide Notebook Deity

    Reputations:
    296
    Messages:
    701
    Likes Received:
    0
    Trophy Points:
    30
    Build price before tax & ship was $2609 (8GB of ram & 256GB SSD are pricey options!)
     
  9. DeathWalking

    DeathWalking Notebook Evangelist

    Reputations:
    12
    Messages:
    346
    Likes Received:
    0
    Trophy Points:
    30
    Ordered On: 1/9/10

    Model info: Red / XPS 1647 / Intel Core i7-620M / 4GB / 500GB HDD / 1080p WLED / Intel 6300 Wireless card / Wireless 370 Bluetooth

    Estimated Delivery Date: 2/1/2010

    Order Status: In Production (1/9/10)

    Price before tax & shipping: $1,698.93
     
  10. extide

    extide Notebook Deity

    Reputations:
    296
    Messages:
    701
    Likes Received:
    0
    Trophy Points:
    30
    Mine shipped today! Holy crap, 7 days built to ship for a BRAND new model, that's impressive.
     
  11. DeathWalking

    DeathWalking Notebook Evangelist

    Reputations:
    12
    Messages:
    346
    Likes Received:
    0
    Trophy Points:
    30
    Mine isn't even in boxing yet... :(
    Oh well, I actually want it as delayed as possible. Because I'm going to return it for the same thing but with 5730 when it comes out.
     
  12. extide

    extide Notebook Deity

    Reputations:
    296
    Messages:
    701
    Likes Received:
    0
    Trophy Points:
    30
    So, it arrived today. A little bit larger/heavier than I had hoped but oh well, I suppose I will get used to it. I will try and get some pictures and whatnot of it up soon.
     
  13. Pepero

    Pepero Notebook Consultant

    Reputations:
    0
    Messages:
    106
    Likes Received:
    0
    Trophy Points:
    30
    Could you take a picture of the inside as well XD
     
  14. tigereat

    tigereat Notebook Consultant

    Reputations:
    6
    Messages:
    252
    Likes Received:
    0
    Trophy Points:
    30
    I couldnot find the Intel 6300 wireless option, how did you get it? please let me know
     
  15. fmac

    fmac Notebook Evangelist

    Reputations:
    8
    Messages:
    307
    Likes Received:
    0
    Trophy Points:
    30
    Bestbuy deal seems really nice.
    Does anybody know if the 1647 has any throttling issue like the 1645?
     
  16. DeathWalking

    DeathWalking Notebook Evangelist

    Reputations:
    12
    Messages:
    346
    Likes Received:
    0
    Trophy Points:
    30
    It was on the website, but is no longer. Sorry.
     
  17. fmac

    fmac Notebook Evangelist

    Reputations:
    8
    Messages:
    307
    Likes Received:
    0
    Trophy Points:
    30
    extide, any report, comment of your 1647 :)?
     
  18. firedive

    firedive Newbie

    Reputations:
    0
    Messages:
    2
    Likes Received:
    0
    Trophy Points:
    5
    Ordered On: 1/21/10

    Model info: obsidian black / XPS 16/ Intel Core i5-520m/ 4GB / 500GB 7200RPM Free Fall SensorSeagate Hard Drive HDD / 900p HD+ WLED LCD, W/2.0 MP/ ATI Mobility RADEON HD 4670 1GB /Intel 6300 Wireless card / Wireless 370 Bluetooth

    Estimated Delivery Date: 2/17/2010

    Order Status: In Production (1/21/10)

    Price before tax & shipping: $1,300.00__________________
     
  19. firedive

    firedive Newbie

    Reputations:
    0
    Messages:
    2
    Likes Received:
    0
    Trophy Points:
    5
    Three different pages have three different listings. I know it is only day one but reading all of these post make me nervous.
    1. Pre Production -------- My account page
    2. In Production----------Order Details page
    3. Work in progress------My order status page
     
  20. hitokiri1

    hitokiri1 Notebook Evangelist

    Reputations:
    56
    Messages:
    637
    Likes Received:
    0
    Trophy Points:
    30
    I've posted about this in other threads so i'm not gonna really repeat myself but.

    Ordered 12/29/09 (in progress) No estimated delivery date.

    Specs are in sig.
     
  21. JoshGlzBrk

    JoshGlzBrk Notebook Evangelist

    Reputations:
    26
    Messages:
    339
    Likes Received:
    0
    Trophy Points:
    30
    Here is my order info, I ordered on the 17th, when they had the $400 off studio xps 16" with i7-620M processor.

    Main Stats:

    i7-620M (2.66ghz - 3.33ghz)
    6GB DDR3
    1080p RGBLED
    256GB SSD
    ATI-4670

    Total Price before taxes: $2234.00


    EDD: 2/3/2010.


    Current Status': Pre Production, In Production, Work in Progress.

    I do not know why it shows three different status's but I hope it comes soon!


    Also, does anyone know which brand of SSD dell uses?

    :)
     
  22. nodnarb83

    nodnarb83 Notebook Consultant

    Reputations:
    3
    Messages:
    101
    Likes Received:
    0
    Trophy Points:
    30
    Here's my order info as well:

    Ordered 1/25/10
    Order Status: Pre-production
    EDD: 2/10/10

    Specs:
    Core i5 430m
    1080p WLED
    500 GB Hard Drive
    HD4670
    4 GB DDR3
    6 Cell Battery
     
  23. 829as99d8i

    829as99d8i Notebook Guru

    Reputations:
    8
    Messages:
    51
    Likes Received:
    0
    Trophy Points:
    15
    Ordered: January 26, 2010
    Order Status: In-Production
    EDD: 2/19/10

    Specs:
    Core i5-520m
    4gb ram 1333 (runs at 1066)
    500GB 7200RPM
    ATI Radeon 4670 1gb
    1080p edge to edge WLED
    Intel 6200 WLAN Wireless-N
    6CELL
    Obscidian Black w/Leather

    To answer somebody's question from a few pages earlier... NO, the 1647 does NOT throttle. That was a major issue with the 1645 which has been rectified.

    Great thread, thanks to whomever started it :) Hopefully my order comes sooner than later, like all of you... I'm pretty excited!
     
  24. Agent MOO

    Agent MOO Newbie

    Reputations:
    0
    Messages:
    2
    Likes Received:
    0
    Trophy Points:
    5
    I posted on the owner's club thread but I think this belongs here:

    XPS 1647 with the RBLED 16" screen and the i5-430m


    Order Date: 1/21/2010
    Order Status: In Production (as of 1/28/10)
    Estimated Delivery Date: 2/8/2010
     
  25. Dreamglass

    Dreamglass Notebook Enthusiast

    Reputations:
    0
    Messages:
    26
    Likes Received:
    0
    Trophy Points:
    5
    Ok so here is my story... (Dell Canada)

    Ordered on Jan 11th for a 1-day only deal of XPS 16 with core i5 520M and ATI 5730 GPU. Loved the ATI 5730 cuz it consumes lower power and is smaller. Sales rep I chatted with told me delivery is 10-18 business days. Great!

    After purchase, EDD shows up as Feb 25th, 2010... 35 business days! Emailed order support couple times about it. Got in touch with my sales rep, who says ATI 5730 is new and OUT OF STOCK and they don't even know when it will be in stock or if they'll even have it as an option in the future! So the guy recommended me to downgrade to ATI 4670 which is still good i guess.

    Guy canceled and reinstated my order on Jan 23rd with the ATI 4670 GPU. New EDD: March 1st, 2010! He told me its just an EDD and I MAY get my laptop earlier than that. WOW!

    So now i'm still waiting. It's really frustrating and agonizing. I feel cheated cuz Dell advertised something they don't have as a build option just to attract sales. I just emailed their order support again to confirm that my machine has actually moved into production rather than still sitting in pre-production stage.

    eBay sellers have better customer service than Dell...
     
  26. nodnarb83

    nodnarb83 Notebook Consultant

    Reputations:
    3
    Messages:
    101
    Likes Received:
    0
    Trophy Points:
    30
    That's horrible. You really should call and threaten to cancel your order. You should be getting some money knocked off of the price of the new order because of the hassle, and get a rush processing of your order and delivery. I ordered on the 25th and it should be here no later than the 10th, and even I think that's a little too long.

    Seriously, kick and scream at the sales rep until they give you a sweet deal for their screw-up. $1,000+ for a laptop is a big deal to me and should be to you. The XPS 16 is one of the nicest laptops they offer so you should be getting treated as an "above-average" consumer. Any sales rep knows that. Tell them that the HP Envy is looking really good right now....
     
  27. hitokiri1

    hitokiri1 Notebook Evangelist

    Reputations:
    56
    Messages:
    637
    Likes Received:
    0
    Trophy Points:
    30
    Your situation sucks because not only they did take away your lower power video card, but they also increased your EDD.

    I definately feel your pain as you might see in some of my other posts. Might have been better off sticking with the original configuration.
     
  28. Dreamglass

    Dreamglass Notebook Enthusiast

    Reputations:
    0
    Messages:
    26
    Likes Received:
    0
    Trophy Points:
    5
    FINALLY I've got a tracking #! Estimated Arrival Date is Feb 4th. It looks like constant bugging Dell customer service does help. I have a total of 20 communications back and forth with Dell order support on my Gmail. :D But I guess I had to make a compromise of downgrading my video card, which now makes the deal I got not so good. I think Dell probably aren't even gonna be using the 5730 for a while, cuz they day I ordered was the only time i saw that card as an option on Dell Canada store... never again.

    Sad thing is when I called Purolator with this tracking #, they said the package haven't even arrived at their facilities yet. Anybody know how soon they actually ship out from Purolator once they give u the tracking #? I hope they're not just bullting me to keep me quiet for a while.
     
  29. vidguy

    vidguy Notebook Enthusiast

    Reputations:
    0
    Messages:
    45
    Likes Received:
    0
    Trophy Points:
    15
    If you've got the tracking number from Purolator, then you will get the LT..soon.

    No worries :)
     
  30. Dreamglass

    Dreamglass Notebook Enthusiast

    Reputations:
    0
    Messages:
    26
    Likes Received:
    0
    Trophy Points:
    5
    Well i sure hope so... but When I talked to Purolator last Friday afternoon, they told me they don't have a scan on the package yet, which means it hasn't arrived at their facilities yet, and Dell claimed to have shipped it out on Thursday. Well... hope it'll arrive before or on this Thursday.
     
  31. 829as99d8i

    829as99d8i Notebook Guru

    Reputations:
    8
    Messages:
    51
    Likes Received:
    0
    Trophy Points:
    15
    Hey!

    In my original post:

    Ordered: January 26, 2010
    Order Status: In-Production
    EDD: 2/19/10

    Specs:
    Core i5-520m
    4gb ram 1333 (runs at 1066)
    500GB 7200RPM
    ATI Radeon 4670 1gb
    1080p edge to edge WLED
    Intel 6200 WLAN Wireless-N
    6CELL
    Obscidian Black w/Leather


    Well.... I'm VERY happy to report that my order has already moved to "Delivery Preparation" ..... SWEET!

    Hopefully it will be shipped this week and arrive next week which would be WELL sooner than the original EDD!!
     
  32. arjunprabhu

    arjunprabhu Notebook Consultant

    Reputations:
    57
    Messages:
    169
    Likes Received:
    3
    Trophy Points:
    31
    waiting....
    details in my signature..
     
  33. nodnarb83

    nodnarb83 Notebook Consultant

    Reputations:
    3
    Messages:
    101
    Likes Received:
    0
    Trophy Points:
    30
    My XPS is currently sitting in Memphis, TN. I don't know how there going to get it here by Thursday, but I'm crossing my fingers!
     
  34. Straphanger

    Straphanger Notebook Consultant

    Reputations:
    5
    Messages:
    194
    Likes Received:
    0
    Trophy Points:
    30
    That's the central FedEx hub where nearly all planes are sent out of overnight. It'll find a way to get to you on time.
     
  35. nodnarb83

    nodnarb83 Notebook Consultant

    Reputations:
    3
    Messages:
    101
    Likes Received:
    0
    Trophy Points:
    30
    Sweet! I didn't know that!

    I've actually been so anxious to get it, I mapped out its route in Google Maps to see how long it would take a truck to get here... :eek:

    I didn't know they would put it on a plane. Now I'm confident it will be here on Thursday. Thanks for the info!
     
  36. arjunprabhu

    arjunprabhu Notebook Consultant

    Reputations:
    57
    Messages:
    169
    Likes Received:
    3
    Trophy Points:
    31
    Called dell again today. Spoke to order modification department. No change in status. RGB screens are delayed from the supplier. No info on when dell would get the RGB screens. Current EDD for me 2/10.

    If dell does not get the RGB screens from the supplier in a day or two., i think all our orders would be further delayed.
     
  37. arjunprabhu

    arjunprabhu Notebook Consultant

    Reputations:
    57
    Messages:
    169
    Likes Received:
    3
    Trophy Points:
    31

    Todays Update 2/4: Called the order modification department again today to check on the RGB LED status. Was told the RGB screens are now in stock, and my order was 'released to production'. .. and it would take around 12 hrs for the status information to be replicated to other dell systems (which show the status).

    Hope the rep is correct. Fingers crossed.

    Can someone waiting for RGB screens call 1-800-247-2076 and check ?
    FYI, i placed the order on 1/16 during signature event.
     
  38. mattmjb0188

    mattmjb0188 Notebook Deity

    Reputations:
    82
    Messages:
    953
    Likes Received:
    0
    Trophy Points:
    30
    Ordered: January 26, 2010
    Order Status: In-Production, Automated Order Status Line: Order Processing as of 2/4/10
    EDD: 2/11/10

    Specs:
    Core i5-540m
    6GB ram @ 1333
    500GB 7200RPM
    ATI Radeon 4670 1gb
    16' FULL HD RGBLED Display
    Intel 6200 WLAN Wireless-N
    9 Cell Battery
    Obscidian Black w/Leather
     
  39. JoshGlzBrk

    JoshGlzBrk Notebook Evangelist

    Reputations:
    26
    Messages:
    339
    Likes Received:
    0
    Trophy Points:
    30
    The main problems as stated above are the RGBLED screens. Orders from early December still have not shipped due to this screen.. so I highly doubt that we (ordered in January), will get ours until March...
     
  40. mattmjb0188

    mattmjb0188 Notebook Deity

    Reputations:
    82
    Messages:
    953
    Likes Received:
    0
    Trophy Points:
    30
    @ Josh

    Have they actually told you the RGBLED is on backorder for your system? Just because they are running low on RGBLED screens does not mean your order can be affected? I have called and several reps all confirmed there are no parts on backorder for my order. This Wednesday my order is suppose to ship so we shall see.
     
  41. arjunprabhu

    arjunprabhu Notebook Consultant

    Reputations:
    57
    Messages:
    169
    Likes Received:
    3
    Trophy Points:
    31
    i just called them again, now they are telling that there is shortage of 6-cell battery....

    the supervisor suggest i cancel the order and replace it


    Any other good laptop deal guys ?
    I guess its time to say bye to dell.
     
  42. mattmjb0188

    mattmjb0188 Notebook Deity

    Reputations:
    82
    Messages:
    953
    Likes Received:
    0
    Trophy Points:
    30
    Don't cancel ): I know the XPS 1647 is an awesome laptop. Its worth waiting for I know that. Have you spoke to several reps about the battery? Never just take one rep's word. Have at least 4 reps confirm it. :) Best of Luck
     
  43. JoshGlzBrk

    JoshGlzBrk Notebook Evangelist

    Reputations:
    26
    Messages:
    339
    Likes Received:
    0
    Trophy Points:
    30
    What state is your order in?
     
  44. JoshGlzBrk

    JoshGlzBrk Notebook Evangelist

    Reputations:
    26
    Messages:
    339
    Likes Received:
    0
    Trophy Points:
    30
    Just called dell order modifcation department to find out why my order was still in pre production.

    He said that it was stuck in pre production for some reason, and that he would have his manager manually put it into production. 3 minutes later, he said it should go into production in 5 - 6 hours. Which coincides for when they close their customer service numbers LOL.

    Guess we will see tomorrow.
     
  45. mattmjb0188

    mattmjb0188 Notebook Deity

    Reputations:
    82
    Messages:
    953
    Likes Received:
    0
    Trophy Points:
    30
    Now Indiana
     
  46. JoshGlzBrk

    JoshGlzBrk Notebook Evangelist

    Reputations:
    26
    Messages:
    339
    Likes Received:
    0
    Trophy Points:
    30
    LOL let me rephrase that, which order state?
     
  47. mattmjb0188

    mattmjb0188 Notebook Deity

    Reputations:
    82
    Messages:
    953
    Likes Received:
    0
    Trophy Points:
    30
    Indiana lol. I just moved back home here from California. It was placed here. Does that even make a difference which state you are in?
     
  48. JoshGlzBrk

    JoshGlzBrk Notebook Evangelist

    Reputations:
    26
    Messages:
    339
    Likes Received:
    0
    Trophy Points:
    30
    Oh LMAO.

    I mean like, "Pre production", "In Production", etc..
     
  49. mattmjb0188

    mattmjb0188 Notebook Deity

    Reputations:
    82
    Messages:
    953
    Likes Received:
    0
    Trophy Points:
    30
    Mine is In Production, was only in Pre Production for 2 days.
     
  50. JoshGlzBrk

    JoshGlzBrk Notebook Evangelist

    Reputations:
    26
    Messages:
    339
    Likes Received:
    0
    Trophy Points:
    30
    Do you have your order added to your dell account? If so does it show "Pre Production" on the main account status page, then if you go to order status it shows "In Production"?
     
 Next page →