The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.
Problems? See this thread at archive.org.
← Previous pageNext page →

    US Order M1330 in "Build" Stage

    Discussion in 'Dell' started by joseyu, Jul 13, 2007.

  1. GSRacer2102

    GSRacer2102 Notebook Guru

    Reputations:
    0
    Messages:
    62
    Likes Received:
    0
    Trophy Points:
    15
    Last time I ordered a dell the ship date never changed and I got it like 5 days before the ship date.
     
  2. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    ... then the ship date was pretty accurate. LOL... however, the Dell Blog guy said that some people's est. ship date will be drastically different within the next week or so. :-(
     
  3. Topspin14m

    Topspin14m Notebook Consultant

    Reputations:
    19
    Messages:
    297
    Likes Received:
    0
    Trophy Points:
    30
    Ordered: 6/27
    Ship Date: 8/1

    Country: USA
    Processor: 2.2 ghz 7500
    Screen Type: LED
    Color: Black
    Camera: VGA
    Battery: 6 cell

    Status: Pre-production as of 7/13
     
  4. ckthepilot

    ckthepilot Notebook Deity

    Reputations:
    220
    Messages:
    1,044
    Likes Received:
    0
    Trophy Points:
    55
    Intel® Core™ 2 Duo Processor T7300 (2.0GHz/800Mhz FSB, 4MB Cache)
    Tuxedo Black
    2GB RAM
    Slim and Light White LED Display with VGA Webcam
    128MB NVIDIA® GeForce™ Go 8400M GS
    160GB SATA Hard Drive (7200RPM)
    CD/DVD burner (DVD+/-RW Drive)
    Intel Next-Gen Wireless-N Mini-card
    56Whr Lithium Ion Battery (6 cell)
    Dell Nylon Deluxe Carrying Case
    Built-in Bluetooth capability (2.0 EDR)

    Ordered: 6/28
    Ship date: 8/22
    Curren status: Pref0kking production
     
  5. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    I wonder about the specs for those people who are past pre-production.
     
  6. ckthepilot

    ckthepilot Notebook Deity

    Reputations:
    220
    Messages:
    1,044
    Likes Received:
    0
    Trophy Points:
    55
    But he also said that for some owners, the ship dates will not change as drastically...
     
  7. GSRacer2102

    GSRacer2102 Notebook Guru

    Reputations:
    0
    Messages:
    62
    Likes Received:
    0
    Trophy Points:
    15
    Intel® Core™ 2 Duo Processor T7300 (2.0GHz/800Mhz FSB, 4MB Cache)
    Tuxedo Black
    1GB RAM
    Slim and Light White LED Display with VGA Webcam
    128MB NVIDIA® GeForce™ Go 8400M GS
    120GB SATA Hard Drive
    CD/DVD burner (DVD+/-RW Drive)
    56Whr Lithium Ion Battery (6 cell)

    Ordered: 6/29
    Ship date: 7/31
    Curren status: Build Stage

    This order was placed through Dell Education in the US.
     
  8. darthsat

    darthsat Notebook Deity

    Reputations:
    220
    Messages:
    820
    Likes Received:
    3
    Trophy Points:
    31
    I actually placed my order 6/28, but the day it was confirmed was 7/2.

    I got it with:
    T7300 2ghz
    LED backlit display black matte cover
    160gb 5400 HD
    1gb RAM
    6cell battery

    Estimated ship date is 8/23.
    It is currently still in the pre-production phase
     
  9. Fiftythree

    Fiftythree Notebook Enthusiast

    Reputations:
    6
    Messages:
    41
    Likes Received:
    0
    Trophy Points:
    15
    Order placed on 7/5
    Still in pre-production
    Estimated ship date is 8/22

    T7300 2ghz
    LED backlit display w/ camera
    120gb 5400 HD
    2gb RAM
    6 cell battery
    Bluetooth
     
  10. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    My lordy... these people still have ways to go!
     
  11. cary_fan

    cary_fan Notebook Enthusiast

    Reputations:
    0
    Messages:
    25
    Likes Received:
    0
    Trophy Points:
    5
    Ordered July 5/07, Black with LED screen
    Moved from Pre-Production to Production on July 12/07
    Estimated delivery is still 8/23/07, but at least I'm seeing some progress!
     
  12. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    WHAT.... Where do you live?
     
  13. Topspin14m

    Topspin14m Notebook Consultant

    Reputations:
    19
    Messages:
    297
    Likes Received:
    0
    Trophy Points:
    30
    What country?
     
  14. Poopsicle

    Poopsicle Notebook Guru

    Reputations:
    1
    Messages:
    58
    Likes Received:
    0
    Trophy Points:
    15
    Yes! Mine too has entered the Production stage yet my estimated delivery is still going to be August 8.
    BTW im from Canada adn ordered from the UofC discoutn page.
     
  15. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    Stats? Country?
     
  16. GSRacer2102

    GSRacer2102 Notebook Guru

    Reputations:
    0
    Messages:
    62
    Likes Received:
    0
    Trophy Points:
    15
    I am in the US.
     
  17. ckthepilot

    ckthepilot Notebook Deity

    Reputations:
    220
    Messages:
    1,044
    Likes Received:
    0
    Trophy Points:
    55
    I am from outer space :/
     
  18. Anzial

    Anzial Notebook Evangelist

    Reputations:
    7
    Messages:
    611
    Likes Received:
    0
    Trophy Points:
    30
    you do realize that you are feeding each other's fears and make each other more nervous about the dell purchse, right?
     
  19. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    or excitement... lol...
     
  20. Poopsicle

    Poopsicle Notebook Guru

    Reputations:
    1
    Messages:
    58
    Likes Received:
    0
    Trophy Points:
    15
    Mine says that the estimated delivery date is actually August 28!
    This makes me even more happy!!!
     
  21. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    wait... i'm confused. Your estimated delivery date is August 28th? Where did August 8th come from?
     
  22. Topspin14m

    Topspin14m Notebook Consultant

    Reputations:
    19
    Messages:
    297
    Likes Received:
    0
    Trophy Points:
    30
    I thought you said August 8?
     
  23. Texzin

    Texzin Notebook Consultant

    Reputations:
    5
    Messages:
    103
    Likes Received:
    0
    Trophy Points:
    30
    My m1330 is in build stage
    USA
    Order:6/27
    est del:8/1
    2.0
    led
    white
    6 cell
    I have ordered over a 100 dell computers.........and a lot of times the est. never changes.

    I got 5 more m1330's ordered that still say pre-production.........Ordered on 7/6
     
  24. Poopsicle

    Poopsicle Notebook Guru

    Reputations:
    1
    Messages:
    58
    Likes Received:
    0
    Trophy Points:
    15
    Oops that was a typo
    Wow i must have made a whole bunch of people really excited... ****... im really sorry.
    Its August 28
     
  25. dbam987

    dbam987 wicked-poster

    Reputations:
    565
    Messages:
    2,530
    Likes Received:
    1
    Trophy Points:
    56
    I placed my order on July 8th, 2007 and currently have an estimated ship date at August 28th, 2007. Bummer.

    Processor: T7100
    Memory: 2 GB
    Screen: LED LCD with Web Cam
    Hard Drive: 160 GB @ 7200 RPM
    Fingerprint Reader: Yes
    Bluetooth: Yes
     
  26. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    That sounds normal... :-(
     
  27. Unshake

    Unshake Notebook Enthusiast

    Reputations:
    0
    Messages:
    24
    Likes Received:
    0
    Trophy Points:
    5
    I think Im going to cancel my order and go with a different laptop if anybody wants my spot :0 haha. After contiunally researching I decided to sacrifice some of the portability for my power and go with a G1SA since I found a pretty good deal on one. Serioulsy $1825 for my spot :p lol
     
  28. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    I was about to jump on it....

    then realized that we have the same exact spot.

    :-(
     
  29. cary_fan

    cary_fan Notebook Enthusiast

    Reputations:
    0
    Messages:
    25
    Likes Received:
    0
    Trophy Points:
    5
    I'm in Canada.
     
  30. chuck232

    chuck232 Notebook Deity NBR Reviewer

    Reputations:
    274
    Messages:
    1,736
    Likes Received:
    1
    Trophy Points:
    55
    Me too, mine went into production yesterday. Ordered on July 4 and the estimated ship date is August 22nd, although I'd imagine it'll be sooner than that if it's already in production.

    T7100
    Black
    LED w/ VGA cam
    2GB RAM
    120Gb 5400RPM drive
    fingerprint reader
    3945abg (Didn't have the 4915...)
    4 cell + 9 cell battery
     
  31. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    I wish I lived in Canada.
     
  32. Sterling3763

    Sterling3763 Notebook Geek

    Reputations:
    2
    Messages:
    81
    Likes Received:
    0
    Trophy Points:
    15
    I don't mean this to be rude, but could you guys start a separate M1330 Canadian shipping thread, like those in the UK did?
    It's just that we're all anxious, and figuring out if and when these things are going to ship is hard enough without mixing shipping schedules of two different countries. If I recall correctly, some Canadian orders originally had a shipping date of the 20th or so. So canadian orders moving into build status is no surprise. The earliest original US shipping date I've seen is the 28th. The fact that some of these people are already moving into build status is news.
     
  33. CodeMonkeyX

    CodeMonkeyX Notebook Deity

    Reputations:
    118
    Messages:
    1,168
    Likes Received:
    0
    Trophy Points:
    55
    I agree, it's not that Canada is less important or anything. Just that I believe you have completely different manufacturing line and the shipping dates do not really apply to US Customers. It will be more beneficial to both sides if we keep it separate (yet equal :D).
     
  34. ckthepilot

    ckthepilot Notebook Deity

    Reputations:
    220
    Messages:
    1,044
    Likes Received:
    0
    Trophy Points:
    55
    Lol err... Are you starting up a XPS entertainment center? :p
     
  35. ckthepilot

    ckthepilot Notebook Deity

    Reputations:
    220
    Messages:
    1,044
    Likes Received:
    0
    Trophy Points:
    55
    canadians: start your own thread :)
     
  36. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    prolly for biz or selling them on ebay... smart.
     
  37. Anzial

    Anzial Notebook Evangelist

    Reputations:
    7
    Messages:
    611
    Likes Received:
    0
    Trophy Points:
    30
    Translation: canucks, get lost! :D j/k
     
  38. Texzin

    Texzin Notebook Consultant

    Reputations:
    5
    Messages:
    103
    Likes Received:
    0
    Trophy Points:
    30

    LOL...............I resale.
     
  39. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    eh..... anyone's status updated?
     
  40. Les

    Les Not associated with NotebookReview in any way

    Reputations:
    4,706
    Messages:
    5,391
    Likes Received:
    1
    Trophy Points:
    0
    Guys it wasnt deleted....I deleted the last post I put in. Were all anxious; lets not start making this forum any less than it is which is something decent that passes our time while we wait...

    But you know what!!!! you may have a point on the Cdn forum.

    CANADIANS UNITE!!! eh...

    http://forum.notebookreview.com/showthread.php?t=141091
     
  41. KevinM

    KevinM Notebook Consultant

    Reputations:
    4
    Messages:
    167
    Likes Received:
    0
    Trophy Points:
    30
    I called that number posted and entered my number. Then it says that order has been shipped out. I was like what??? Then it goes on to say, this order has shipped out to the carrier on July 2, 1998! wtf!
     
  42. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    It happens if you entered an invalid order number (non-US order numbers = invalid)
     
  43. KevinM

    KevinM Notebook Consultant

    Reputations:
    4
    Messages:
    167
    Likes Received:
    0
    Trophy Points:
    30
    Ahh.. I have a Canadian order number.
     
  44. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    yep... it won't work for you :-(
     
  45. WilliamG

    WilliamG Notebook Deity

    Reputations:
    629
    Messages:
    1,421
    Likes Received:
    6
    Trophy Points:
    56
    I'm really confused here. I ordered my M1330 on June 27th, in the morning, and mine has been "In Production" since that very same day my payment cleared.
     
  46. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    If you are a US customer... call 1-800-433-9014 and the system will tell you a more detailed status.

    "In production" also includes "Pre-Production"....

    so it might be stuck there...
     
  47. WilliamG

    WilliamG Notebook Deity

    Reputations:
    629
    Messages:
    1,421
    Likes Received:
    6
    Trophy Points:
    56
    You are indeed correct. Pre-production.

    Ordered: June 27th in morning.

    Setup:

    XPS M1330
    T7500 2.2Ghz
    1GB DDR-2 (got 4GB ready to be slammed in!)
    Geforce 8400
    LED display with VGA cam
    200GB 7200rpm
    4 cell + 9 cell
     
  48. blahdude84

    blahdude84 Notebook Deity

    Reputations:
    35
    Messages:
    1,641
    Likes Received:
    0
    Trophy Points:
    55
    I wonder why some are still in pre-production and others are built (for the people in the 26th to 29th range).
     
  49. Sterling3763

    Sterling3763 Notebook Geek

    Reputations:
    2
    Messages:
    81
    Likes Received:
    0
    Trophy Points:
    15
    I'm in pre-production as well:
    Ordered: around 9pm EST on June 26th
    Specs:
    T7300 2.0Ghz
    2GB of RAM
    Geforce 8400M GS
    LED display with camera
    120GB 5400rpm
    4 cell + 9 cell
    Fingerprint reader
     
  50. pogiboi

    pogiboi Notebook Consultant

    Reputations:
    26
    Messages:
    122
    Likes Received:
    0
    Trophy Points:
    30
    Afternoon update.......Still Pre-Production
    Ordered : Morning of June 26th
    Black M1330
    T7300 2.0Ghz
    2GB of RAM
    Geforce 8400M GS
    LED display with camera
    120GB 5400rpm
    6 cell
    Fingerprint reader
    EPP
     
← Previous pageNext page →