The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.
Problems? See this thread at archive.org.
← Previous pageNext page →

    'The Phase Game' UK m15x

    Discussion in 'Alienware' started by mwatkins7, Feb 28, 2008.

  1. EeekiE

    EeekiE Notebook Consultant

    Reputations:
    15
    Messages:
    245
    Likes Received:
    0
    Trophy Points:
    30
    Yeah great input again Rebmik ^_^
     
  2. Rebmik

    Rebmik Notebook Evangelist

    Reputations:
    12
    Messages:
    640
    Likes Received:
    0
    Trophy Points:
    30
    Meh, too much thinking outside of the box.
     
  3. jcharnley

    jcharnley Notebook Consultant

    Reputations:
    1
    Messages:
    118
    Likes Received:
    0
    Trophy Points:
    30
    maxxed out Config ?????
    what you getting ?
     
  4. EeekiE

    EeekiE Notebook Consultant

    Reputations:
    15
    Messages:
    245
    Likes Received:
    0
    Trophy Points:
    30
    It's not thinking outside the box though. It's just unhelpful dogmatic negativity thread after thread. It's just like a fanboy pulling in the opposite direction. Just as bad I think.
     
  5. crystak

    crystak Notebook Evangelist

    Reputations:
    9
    Messages:
    481
    Likes Received:
    0
    Trophy Points:
    30
    Why can't they?
     
  6. Raezoruk

    Raezoruk Notebook Enthusiast

    Reputations:
    0
    Messages:
    22
    Likes Received:
    0
    Trophy Points:
    5
    Right , rang up, all the hardware is there, and will move swiftly to testing apparantly now. I asked for the line manager/techies to confirm the screen lights. I was told it wasnt featured in the Europe models it was only a promotion. Leveling meaning there was problems and they took them out probably. Maybe they will physically be there. If you want to know technical stuff theres no point talking to any finance/sales support you need to ask for the info from the depot.

    My spec is...

    15.4" WideUXGA 1920 x 1200 LCD (1200p)
    512MB NVidia® GeForce™ Go 8800M GTX
    Intel® Core™ 2 Extreme X9000 2.8GHz (6MB Cache 800MHz FSB)
    4GB Dual Channel DDR2 SO-DIMM at 667MHz - 2 x 2048MB
    Intel Turbo Cache Memory 1GB – Accelerate Data Transfer Speed
    Single Drive Configuration - 64GB SATA Solid State Drive


    Now half these things they do have, but it will say theres a delay on the site beacause by the time they have got through even 50% of the back-logged orders it will be out of stock again. So the early orders like mine who havent been amended or changed since the original order are the only ones who stand a chance of getting it soon


    Something worth thinking about guys is apparantly whole systems might be ready to be built but willbe held back due to accessories. SO obviously if it was the AC theres no way around but if u ordered headphones, software anything like that then maybe dumping that off your order would put you through faster as it would trigger 100% of the required inventory being there. Thats only an opinion though.
     
  7. EeekiE

    EeekiE Notebook Consultant

    Reputations:
    15
    Messages:
    245
    Likes Received:
    0
    Trophy Points:
    30
    Well yours has been amended if you have an X9000. I ordered mine on the 13th.
     
  8. Raezoruk

    Raezoruk Notebook Enthusiast

    Reputations:
    0
    Messages:
    22
    Likes Received:
    0
    Trophy Points:
    5
    Yeah i think your right i ordered the 2.6 :eek:
     
  9. Raezoruk

    Raezoruk Notebook Enthusiast

    Reputations:
    0
    Messages:
    22
    Likes Received:
    0
    Trophy Points:
    5
    I cant be the only one who is on phase 5, gonna scout around for others
     
  10. ioaniro

    ioaniro Notebook Evangelist

    Reputations:
    28
    Messages:
    588
    Likes Received:
    0
    Trophy Points:
    30
    Ordered on 5th got the 2.6Ghz and the smaller res screen. Mabe they got only the big kick ass LCDs?
     
  11. ioaniro

    ioaniro Notebook Evangelist

    Reputations:
    28
    Messages:
    588
    Likes Received:
    0
    Trophy Points:
    30
    I'm thinking now... since they said that they didn't have the AC adaptors it might be possible that they got only the UK special ones and this is why I'm stuck in 4th phase? I'm waiting for 2 normal euro ones (ordered 2 from the start).
     
  12. jcharnley

    jcharnley Notebook Consultant

    Reputations:
    1
    Messages:
    118
    Likes Received:
    0
    Trophy Points:
    30
    Hi guys just off the phone with AW, they are saying the AC adptors are in stock on the 28th march
    I asked about my smart bay battery.
    He told me that mine was already in my inventory(in stock) but they dont know when the next lot will come in,
    Also said that the screen will have the LCD around it, But its only very thin

    Shall i take whatever he said with apinch of salt ?
     
  13. ioaniro

    ioaniro Notebook Evangelist

    Reputations:
    28
    Messages:
    588
    Likes Received:
    0
    Trophy Points:
    30
    I think the lights thing is the same confusion they had with the first US shipments. The lights are on but you need the patch to activate them. I will not be putting the patch anyway :D.
     
  14. btgman

    btgman Notebook Consultant

    Reputations:
    0
    Messages:
    227
    Likes Received:
    0
    Trophy Points:
    30
    So, does this mean that we'll all be in phase 4 until at least March 28th?
     
  15. Bo@LynboTech

    Bo@LynboTech Company Representative

    Reputations:
    57
    Messages:
    826
    Likes Received:
    0
    Trophy Points:
    30
    late march early april is what I was told last thursday, thats why I cancelled
     
  16. Raezoruk

    Raezoruk Notebook Enthusiast

    Reputations:
    0
    Messages:
    22
    Likes Received:
    0
    Trophy Points:
    5
    i was told by the depot that even if your short of the AC adaptor your laptop will go into production and go through the testing phase and will only be delayed if the accessories are not avaiable t the time of packing/shipment
     
  17. Bo@LynboTech

    Bo@LynboTech Company Representative

    Reputations:
    57
    Messages:
    826
    Likes Received:
    0
    Trophy Points:
    30
    well thats another lie, because they said in a phone call I made that the machine would only go into production once they had all the parts
    especially as a delay was the power pack BOOOO!

    dont take anything they say seriously , they are just running the circle of excuses
     
  18. Raezoruk

    Raezoruk Notebook Enthusiast

    Reputations:
    0
    Messages:
    22
    Likes Received:
    0
    Trophy Points:
    5
    hmmm, who knows whats going on but ive been told 100% by USA support connecting to the "depot" and direct through to the European line that im defintly well into production even though most of UK is backlogged. Just wandering if there are any other phase 5ers out there
     
  19. ioaniro

    ioaniro Notebook Evangelist

    Reputations:
    28
    Messages:
    588
    Likes Received:
    0
    Trophy Points:
    30
  20. Chris38

    Chris38 Newbie

    Reputations:
    0
    Messages:
    2
    Likes Received:
    0
    Trophy Points:
    5
    Well you are not the only one my friend! I have been in phase 5 since Wednesday, i even phoned up to make sure that i am and the guy on the other end confirmed it :) I placed my order the day the laptop came available but my payment didn't go through til around the 15th. I just hope that i wont be stuck in phase 5 for multiple weeks now.
     
  21. ioaniro

    ioaniro Notebook Evangelist

    Reputations:
    28
    Messages:
    588
    Likes Received:
    0
    Trophy Points:
    30
    so it looks random phase 5? maybe just to try and show the people that they are doing something? :D
     
  22. Raezoruk

    Raezoruk Notebook Enthusiast

    Reputations:
    0
    Messages:
    22
    Likes Received:
    0
    Trophy Points:
    5
    wll not really, as he said he ordered as soon as available as did i, ignoring the pyment land. And you have ireland based, US and "european" support, depending on what time you ring and how busy they are, i had a problem with refunds done by the "european" finance support so i spoke to the US line to get it sorted by a finance supervisor.

    I think its, as they said on the phone, dit will be done in order, one by time of order confirmation and two possibly by current inventory
     
  23. Raezoruk

    Raezoruk Notebook Enthusiast

    Reputations:
    0
    Messages:
    22
    Likes Received:
    0
    Trophy Points:
    5
    > Chris38

    Youll have to keep updating any changes in phases or order status. See if yours run along the same path asmine :) , and there will hopefully be more out there to join in.

    come ooon phase 6 :rolleyes:
     
  24. digisoul

    digisoul Newbie

    Reputations:
    0
    Messages:
    1
    Likes Received:
    0
    Trophy Points:
    5
    im new here, but i also ordered one, payment didnt go through to 27th feb with estimated date of 10th march...yea right, um well im still in phase 4 this is my first, and proberly last alienware, CBA to cancel so ill just wait it out, was a gift anyway, just have to wait a bit longer :mad:
     
  25. Chris38

    Chris38 Newbie

    Reputations:
    0
    Messages:
    2
    Likes Received:
    0
    Trophy Points:
    5
    Well, just got off the phone to AW.... and i am not happy. The woman on the other end told me that i will be waiting like everyone else for their laptop until the end of April, which would be fair enough if they hadn't told me that it was being built! She said the parts wont be in until later etc. I was too angry to ask why i'm on phase 5 so i sent them an email asking for an explanation. I am so disappointed with all the lies.
     
  26. ioaniro

    ioaniro Notebook Evangelist

    Reputations:
    28
    Messages:
    588
    Likes Received:
    0
    Trophy Points:
    30
    Hmm, I was actually suspecting this but I was hoping I was wrong :(. I'll call them up later on to complain, not that it ever did any good.
     
  27. gpzach

    gpzach Notebook Enthusiast

    Reputations:
    1
    Messages:
    33
    Likes Received:
    0
    Trophy Points:
    15
    hello, i m new here
    since i ordered m15x on 26th Feb
    but i required for uk power, and no smartbay battery, but i m stil in phase 4,
    i have sent 2 emails 2 ask, but no reply at all
    they r too rude
     
  28. jcharnley

    jcharnley Notebook Consultant

    Reputations:
    1
    Messages:
    118
    Likes Received:
    0
    Trophy Points:
    30
    Its like waiting for delivery on a new car, its right pi**ing me off
     
  29. Bo@LynboTech

    Bo@LynboTech Company Representative

    Reputations:
    57
    Messages:
    826
    Likes Received:
    0
    Trophy Points:
    30
    I am surprised how patient many of you are, I only gave them a month, well saying that if they hadnt told me it was going to be April before the build I may have waited another couple of weeks.

    The questions in your minds should now be, do you really want to deal with a company that treats you like that, no-matter how cool the notebook is.

    I do hope everything works out for everyone, but questions have to be asked.
    its definitely not good trading etiquette
     
  30. mwatkins7

    mwatkins7 Notebook Guru

    Reputations:
    7
    Messages:
    72
    Likes Received:
    0
    Trophy Points:
    15
    Yeah i did the same, since then i have ordered a sony laptop and received it :)
     
  31. Melvan

    Melvan Notebook Enthusiast

    Reputations:
    1
    Messages:
    26
    Likes Received:
    0
    Trophy Points:
    5
    ..right said for somebody who has canceled his order ...
    ...not for me who kept his one !

    I thought to cancel it and to choose another model but the issue is that at present time , I didn't find any better other model than this one.

    I am happy with my present Laptop ( XPS 1210 ) even if I am looking for a "real " gaming laptop , what the M15X proposes .

    Canceling is a choice that I respect ....waiting is another choice I respect more .

    The service is one of the beast I had but somewhere I don't put the blame on the animators ....I am still confident to get one of the best actual laptop ...

    Wait & See
     
  32. ioaniro

    ioaniro Notebook Evangelist

    Reputations:
    28
    Messages:
    588
    Likes Received:
    0
    Trophy Points:
    30
    I'm kinda in the middle, I wanted to cancel and I know AW does not deserve the reputation it has (in europe at least) but then again I'm hoping the laptop will be the best of its time and I was not in a hurry to start with. If they'd have kept me informed constantly and explain the things I'd be happy :D.
     
  33. gpzach

    gpzach Notebook Enthusiast

    Reputations:
    1
    Messages:
    33
    Likes Received:
    0
    Trophy Points:
    15
    i m kind of sad, in jan, i ordered Rock xtreme 770, then one months later, they told me that they were stil waiting for the parts to come, and not sure when they would receive them
    so i canceld, then i ordered m15x, now it is in the same situiation now
    really bad for me
     
  34. Bo@LynboTech

    Bo@LynboTech Company Representative

    Reputations:
    57
    Messages:
    826
    Likes Received:
    0
    Trophy Points:
    30
    thats terrible to hear the same kind of service (or lack thereof) from Rock
    however I am sure rock would have taken my suggestion on board to maybe upgrade my processor or ram for free because of the wait.

    Alienware were not prepared to negotiate, they just expected me to sit there and take it.

    I of course respect anyones decision to wait, but if this is an ongoing problem, how on earth are they going to get spares for repairs?
     
  35. choey

    choey Notebook Enthusiast

    Reputations:
    0
    Messages:
    42
    Likes Received:
    0
    Trophy Points:
    15
    I have been in Phase 5 for the last 2 weeks. I'm the one who placed ordered from Australia and gone into Phase 5 in one week. Doesn't look like the order status info is correct because I really doubt that it takes this long to build a unit!
     
  36. gpzach

    gpzach Notebook Enthusiast

    Reputations:
    1
    Messages:
    33
    Likes Received:
    0
    Trophy Points:
    15
    i am totally agree with u, at least, rock consider me as a consumer
    very nice to me, and always answered me very friendly when i had question
    but for alienware, i sent 3 emails, no replies at all
    i dont know what they are thinking, but it is not the way to treat a customer
    i think i made a mistake 2 cancel the deal with rock and changed to alienware :mad:
     
  37. Bo@LynboTech

    Bo@LynboTech Company Representative

    Reputations:
    57
    Messages:
    826
    Likes Received:
    0
    Trophy Points:
    30
    well gpzach your third option is Novatech
    their x80r pro is £1500, the rock equivalent is over £2k

    you can add 2 year warrnty pack to the novatech for about £39

    I am currently sat using one, took them 2 working days to deliver
    Ordered on a friday got it the following tuesday
    plus delivery was only £6

    www.novatech.co.uk
     
  38. gpzach

    gpzach Notebook Enthusiast

    Reputations:
    1
    Messages:
    33
    Likes Received:
    0
    Trophy Points:
    15
    thanks, i wil consider that
    but at least i m gonna call AW today, see what they wil say
     
  39. ioaniro

    ioaniro Notebook Evangelist

    Reputations:
    28
    Messages:
    588
    Likes Received:
    0
    Trophy Points:
    30
    Let us know what they will say too ;).
     
  40. ioaniro

    ioaniro Notebook Evangelist

    Reputations:
    28
    Messages:
    588
    Likes Received:
    0
    Trophy Points:
    30
    So how is your phase going, still in phase 5? I'm still stuck in 4th :D
     
  41. Mappy

    Mappy Notebook Guru

    Reputations:
    2
    Messages:
    73
    Likes Received:
    0
    Trophy Points:
    15
    Heres an email I got through today :(
    End of March early Apr is not that far away, but I think its going to be end of Apr !

    Dr Mr Mappy

    Please accept our apologies at the inconvenience caused due to unforeseen delays in processing your order.

    Alienware has experienced a supply issue with its vendor on the cases for the Area51® m15X Notebooks (AREA-51 M15X 15" WUXGA & AREA-51 M15X 15" WXGA). These are currently on a long delivery time, estimated delivery date to Alienware is the end of March or beginning of April.

    As you can appreciate this delay was unforeseen at the time you placed your order. We are working very closely with our vendor to try and improve this date. Once the units are received we will work on expediting your order as quickly as possible so you will not incur any further delays.

    We wish to extend our apologies for this inconvenience and subsequent delay to your order.

    If you have any questions or concerns please contact us on the following UK Freephone: 0800 279 3975 or International Phone: 00353 9064 56 500.

    With kindest regards

    Patricia Larwa
    GCBD Services Coordinator EMEA

    Alienware Ltd.
    Freephone UK: 0800 279 3975
    International Phone: 00353 9064 56500
    Fax: 00353 9064 86 967
    www.alienware.co.uk
     
    Last edited by a moderator: May 8, 2015
  42. Impressive

    Impressive Notebook Consultant

    Reputations:
    17
    Messages:
    250
    Likes Received:
    0
    Trophy Points:
    30
  43. Mappy

    Mappy Notebook Guru

    Reputations:
    2
    Messages:
    73
    Likes Received:
    0
    Trophy Points:
    15
    Last edited by a moderator: May 8, 2015
  44. ioaniro

    ioaniro Notebook Evangelist

    Reputations:
    28
    Messages:
    588
    Likes Received:
    0
    Trophy Points:
    30
    nah, they are on hold from before the problems with the heating. I wont be surprised if when we will get the laptops we wont have to update the bios ourselves... Most people ordered on 4th-5th february with estimated delivery end february or first few days of march. There was no heating issue saga at that time and shipments in US where in full blast. They just suck, no need for other explanation :D.
     
  45. Raezoruk

    Raezoruk Notebook Enthusiast

    Reputations:
    0
    Messages:
    22
    Likes Received:
    0
    Trophy Points:
    5
    woo phase 6 !!!
     
  46. crystak

    crystak Notebook Evangelist

    Reputations:
    9
    Messages:
    481
    Likes Received:
    0
    Trophy Points:
    30
    I just got the message when trying to check my order status:

    "Order status not available at this time"

    Is this something to get worked up about? :p
     
  47. exiled

    exiled -_-

    Reputations:
    115
    Messages:
    1,770
    Likes Received:
    0
    Trophy Points:
    55
    nope i got that 2 times before. it doesnt change anything about your status :)
     
  48. crystak

    crystak Notebook Evangelist

    Reputations:
    9
    Messages:
    481
    Likes Received:
    0
    Trophy Points:
    30
    Shame; Where can I see my estimated shipping date? I can't find it anywhere in my order status.
     
  49. exiled

    exiled -_-

    Reputations:
    115
    Messages:
    1,770
    Likes Received:
    0
    Trophy Points:
    55
    when you were ordering there was a box on the right side of the screen that kept showing you the price. in that box also said your estimated shipping date. you basically just memorize that after you submitted your order.
     
  50. MrDJ

    MrDJ Notebook Nobel Laureate

    Reputations:
    2,594
    Messages:
    10,832
    Likes Received:
    363
    Trophy Points:
    501
    Estimated (give or take a month) :eek:
    isnt this what you meant to say :D
     
← Previous pageNext page →