you did order a m17x r4 right?? on the phone with customer support now...
-
-
-
I ordered the M17x r4 with the i7-2860QM and the 7970m on the 19th with an EDD of 5/18/12. It's still "in production".
-
That's a little sketch-ball that there's no definitive answer on whether or not you will be getting the 3rd gen chip or not. Can't say I've ever seen sh*t like that going on within a company, but then again maybe I just haven't had my ears and eyes open at the right times.
I'm hoping either way, that I get my laptop very soon, and not on the damn 25th. -
The Dell rep Bill on the forum has been more than clear, if you ordered I7 you will get Ivy bridge.
Sent from my DROID BIONIC using Tapatalk 2 -
-
-
-
Plain and simple:
M14xR2- There are multiple motherboards stocked for warranty replacements. One for each GPU offered, and each supporting Ivy Bridge. The base config has a Core i5 offered. That CPU is Sandy Bridge and will remain so until further notice (aka, when Intel delivers Ivy Bridge i5's, and we deplete stock that will be current at that time). Every other motherboard supports only Ivy Bridge. There are currently NO engineering plans to make the Ivy Bridge motherboards backwards compatible with Sandy Bridge. This may change. So, it's impossible to ship this system with a Sandy Bridge, except for the base Core i5 config. Once the platform is brought online in the Recommended Spares List (database tool tech support and care use to get part numbers to dispatch), I will post screenshots of all the motherboards. This should happen when or shortly after systems start appearing in the field.
M17xR4- There is only one motherboard stocked for warranty replacement. It supports ONLY Ivy Bridge. There are currently NO plans for engineering to add BIOS support for Sandy Bridge. It is impossible to have a packing slip say "M17xR4" and have a Sandy Bridge in it. It is possible to see packing slips, online order status tools, or tools frontline reps use that say "Sandy Bridge," but again, IT IS IMPOSSIBLE to get a Sandy Bridge CPU on the R4.
M18xR2- ditto from the M17xR4 info above. -
But by that time, there might very well be talk about the R3, which will come with a back massager and coconut peeling addon, and I can't pass that up, right? Heh heh.
~~~
I've queried regarding this in the m18xR2 thread over in the owner's forum, but in case anyone from Dell that has the desire to assist with this (that's my way of saying "Bill, please help me, kind sir!") it would be most appreciated: http://forum.notebookreview.com/alienware-m18x/657864-alienware-m18x-r2-4.html#post8485981 the gists being that the power supply 331-2429 (330w, m18xR1/X51) is cheaper than the power supply 330-4342 (240w, m18xR2), which makes me wonder if the 330w power supply is compatible with the m18xR2, and if so, why isn't Dell offering this as the stock power supply unit? Thanks! -
-
Heres what my rep emailed me earlier after i sent him the direct2dell link!
"In US we have already launched the IVY bridge processors, we may be doing the automatic upgrade for US orders.
As of now we are not doing it for UK orders."
Your doing a good job bill, wish sales reps were as clued up on what they are selling as you are, would stop a lot of confusion -
@Guswut I posted on that thread. Hope it helps.
-
@ Bill : I have a question. Will the power adapters which come with the M14X have a voltage range from 100V - 240V ?
I'm planning to go to India this summer , so I need to know -
@Dell-Bill
When will the new AWs be released in Singapore? thanks for the info -
-
-
For everyone else, a pro tip: Tell whatever agent you're talking to, should you choose to punish yourself with this exercise, look at your order, find the SKU for the CPU, BOM that sku up and own, and then read the master part description they see to you off the screen. Disclaimer: I can't promise whatever agent you happen to request this of will a) do it without saying they did when they didn't or b) understand what "BOM" means or how to do it.
-
Thanks to Bill some questions have been answered. Do not panic guys. Your orders will be fine and there is no need to cancel and re order, if you do it'll be very very strange most likely a 1% chance for it to be you. Just be a little patient. Ordered on the 25th. A total of 5 dell reps told me "Your item did not get 3rd gen cpu", but little do they know. Last rep i talked to said to me "I am willing to bet you money that your item wont get 3rd gen intel" when i referenced Bill. So put your phones down, drink a cold one and wait patiently. -
I emailed order support earlier asking this:
Hello, I recently placed an order (last tuesday) for an M17X system with the 2860QM CPU. I noticed some people are getting updates that they are being upgraded to an equivalent Ivy Bridge CPU. Will my order be updated with this change as well, or? If so, will this affect my estimated arrival date of the system? As far as ETA, what is the current status of my system in the current production line? Thank you.
I got this as a response, completely useless drivel that shows NOTHING new. Actually scratch that, I can't really understand it to the point where I have no idea if anything in there is helpful:
I understand from your e-mail that you recently placed an order for an M17X system with the 2860QM CPU, you noticed some people are getting updates that they are being upgraded to an equivalent Ivy Bridge CPU and you would like to know if your order be updated with this change as well and will it affect your estimated arrival date of the system. I assure you that I will assist you to the best of my ability.
I have checked our records and found that you have placed an order for ?Alienware M17X R4? under the order number XXXXXXXX.
I would like to inform you that we do see any such information regarding the upgrade you have mentioned in the email.
For more information, I would request you to please contact our Product Advisors at 1-800-289-3355 Monday through Sunday 8:00 AM CST to 9:00 PM CST. You can order online at dell.com.
You may also contact our Product Advisors by doing a Live Chat. Live Chat is available Monday to Sunday from 8am to 11pm CST and the link for the same is:
http://www.dell.com/content/topics/...t_core?c=us&cs=19&l=en&s=dhs&~lt=popup&~ck=mn
Or you may email them at [email protected]
However, I have reviewed your account and it shows that your order number XXXXXXXX is currently in production and the estimated delivery date is on or before 05/25/2012. However, It?s just an estimated delivery date and we will try to ship out the order at the earliest.
I would like to inform you that an estimated delivery date is provided to you at the time of placing the order based on conditions at that time. Most of our orders are delivered to our customers within the time frame referenced at the point of sale. However, as all of our systems are custom-built to specification, we do occasionally run into unexpected delays in the manufacturing process. As informed to you earlier at the time of order processing, there may be a delay that even may subject to cancellation of the order, hence we are unable to guarantee any delivery date.
Once your order ships out of Dell, you will receive an ?Order Shipped? email with the required delivery information for your order. So, please check your e-mail regularly (including ?Junk? and ?Spam? mail folders).
You can check the progress of your order any time by clicking the link below and entering your Order number and Customer number.
_www.dell.com/orderstatus
Please provide an alternate phone number and the best time to contact you for our records. This information will help us contact you in future.
If there is anything else that we can assist you with, then please reply to this email and we will be glad to assist you.
Also what the crap is with the live chat link? Every time I try to use it, the session ends within a few minutes, as if no one wants to talk OR their live chat system is just garbage. -
@BiH115 dude dude dude dude. You should edit your order number out of that post ASAP. It's personally identifying information that can be used against you by the unscrupulous in the world.
EDIT:
In the meantime, I managed to use the order number to get your CPU SKU and BOM it down. You have Ivy Bridge coming.
Component Part(s) of 319-0583
KM1JJ MOD,PRC,IVB,I7-3820QM,2.7,ANW
V9KPP MOD,LBL,INTEL,NB,CI72 -
-
(see my edit above)
-
Heres the part number of my processor in my setup, guess its the same thing as SKU? could you BOM it down? xD
213-15807 -
Does that mean I originally did not have the Ivy Bridge update slated in my order before this process? -
-
For anyone needing additional reassurance, I just received my M14x R2 which was ordered with the i7-2860QM. I booted into the BIOS and found i7-3820QM. My order was placed on 4/19 shortly after the announcement.
Len -
Well furthering the 7970m issue, apparently theres no way of pausing production, you can only cancel and start again, however they are more than happy to keep a hold of your money
ironically this is the one situation where this is helpful, cba fanying about with waiting 3 days or such for clearing.
For some reason the Dell rep covering my guy (Oh yeh, hes ill btw, feels bad now) believes the 7970 is coming to the 18x on the 5th, lets see what happens with that.
-
Bill of material
-
Optimistic Prime Notebook Evangelist
No, you had it all along. Bill is just awesome, and is doing his beat to reassure you guys.
Edit: Woah, I got ninja posted like 5 times in the time it took me to peck that out on my phone. -
Very cool, thanks Bill! So now that it's official that I'm getting Ivy in my system, how does this affect my ETA?
Edit: Thanks for the extra clarification Washu, appreciate it.
Bill, you rock. -
Bill can u check my order as well I'll pm u thanks!
-
Are we seeing a pattern yet?
Bill says all M14xR2, M17xR4, M18xR2 will ship with only Ivy Bridge. Orders with Sandy Bridge SKU's, when BOM'd, are coming back as Ivy Bridge.
Fun stuff, really.
-
BTW - when did you order your laptop? I ordered on the date that you ordered, 4/19 literally 15 minutes after the refresh. -
Optimistic Prime Notebook Evangelist
-
"No svc tag yet; hasn't shipped"
"kk"
"well, officially
looks like it is about to ship"
"nothing anywhere says "ivy bridge" on it yet?"
"not on the components
looking in a diff place"
"kk if we find something we can screen shot, this case is over"
"do you think if I BOM the proc it would show?"
"perhaps. i'll bom"
"319-0590"
"got rsl open now
sec
boom!
email me a screen grab of where you saw that sku, plz
and it's over
easy close for scott"
"huh?
Do we need to do anything else w/this one?"
"nope" -
Whoever just received their m14xr2......benchmarks please!!!!
-
-
Bill. You are my hero
-
-
And Dual 7970's
-
Dear Bill_B, your participation and performance here is nothing but AMAZING!!!
As a very long time client of Dell ( without any major issues), I'm very glad ( to say the least!) to read all about the way Dell and you are positively 'filling gaps & holes' to solve questions and issues by providing something that no other computer producer ( as far as I know) is ready to do. Keep the AMAZING work on!
BTW: Hope your child is already feeling ok and the suitcases are ready for your next week vacations. -
katalin_2003 NBR Spectre Super Moderator
http://forum.notebookreview.com/alienware-m14x/660277-official-m14x-r2-owners-lounge-thread.html -
Does this mean that my order is about to ship!? -
@ Dell-Bill_B
Can you check this part number for me Bill Please ??? 319-0582
Just to be reassured -
Enjoy the new machine! -
V9KPP MOD,LBL,INTEL,NB,CI72 <-Ditto -
CrossFireX --> CFX
-
Hi everyone,
I been following this thread for some time and after the IB announcement I make my mind to buy an Alienware. So I want some advice in:
1. M17X or M18X
2. Single or CrossFire 7970m
3. Get after market upgrades.
I'm a Web Application Developer so I would use for work as well for games. Since is common for me to have 2 VM open. And as for gaming the main games I will be playing would be Diablo 3, Guild Wars 2 and some FPS games like BlackLight. I also have a PS3 but recently I found myself playing more in my PC.
My preference is on base M18X + 7970M + i7-3720QM. And later upgrade to a 2x SSD Raid 0 + 16GB RAM Corsair 1866MHZ. And leaving a CrossFire config for when games get more demanding.
What do you guy thing? I know I could do with a M17X, currently have a G73JH, but I think M18X is more flexible as "future-proof"
New M17x R4, M14X R2 and M18X R2 are coming - Speculation thread.
Discussion in 'Alienware' started by sn0w13, Jan 25, 2012.