My EDD is 26/04 as well. Once again, like peas in a pod. The coupons I used for the XPS ran till 21/04 and Dell has coupons again until 27/04 which comparatively is £30 less than I paid so no love lost really with Dell - I think the £30 covers the cost of the 15 month McAfee subscription which I would have paid.....
-
Koeln, Germany 04/21/2011 10:47 P.M. Arrival Scan
Warsaw, Poland 04/21/2011 9:04 P.M. Departure Scan
04/21/2011 6:02 P.M. Arrival Scan
Almaty, Kazakhstan 04/21/2011 4:33 P.M. Departure Scan
04/21/2011 2:03 P.M. Arrival Scan
Koeln, Germany 04/21/2011 5:24 A.M. Package data processed by brokerage. Waiting for clearance. / Released by Clearing Agency. Now in-transit for delivery.
Incheon, Korea, Republic of 04/21/2011 10:35 A.M. Departure Scan
04/21/2011 8:54 A.M. Arrival Scan
Shanghai, China 04/21/2011 5:59 A.M. Departure Scan
Koeln, Germany 04/20/2011 8:02 P.M. Package data processed by brokerage. Waiting for clearance.
Shanghai, China 04/20/2011 10:12 P.M. Export Scan
04/20/2011 10:04 P.M. Hub Scan
China 04/20/2011 8:45 A.M. Order Processed: Ready for UPS -
Update
My order which was placed 4/14 has shipped today 4/21 with estimated delivery by Saturday 4/23, originally said 5/3.
The tip I believe is calling customer service and bring up the fact if it is sitting waiting for pick up by fedex as was the case with my unit.
I called yesterday 4/20 spoke to the customer service rep let him know the status in Order Status said "Ship Complete" but still have no tracking number. He confirmed said the laptop is packaged waiting for fedex, then today boom tracking number.
Not sure of this will work, but might help.
I am happy though not even 9 days and I will be seeing this unit in my hands, it was picked up in Jersey sweet that's were I guess it was built not even more then 3 hours away.
Also person above wow yours went through multiple nations, get the job done dell? Awwwwwwww Yeaaaaaaaaaaaa! -
Take a look - It's finally stopped in Castle Donnington ready to be delivered Tuesday!
Castle Donnington, United Kingdom 04/22/2011 3:56 A.M. Arrival Scan
Koeln, Germany 04/22/2011 3:37 A.M. Departure Scan
04/22/2011 1:47 A.M. Import Scan
Koeln, Germany 04/21/2011 10:47 P.M. Arrival Scan
Warsaw, Poland 04/21/2011 9:04 P.M. Departure Scan
04/21/2011 6:02 P.M. Arrival Scan
Almaty, Kazakhstan 04/21/2011 4:33 P.M. Departure Scan
04/21/2011 2:03 P.M. Arrival Scan
Koeln, Germany 04/21/2011 5:26 A.M. Package data processed by brokerage. Waiting for clearance. / Released by Clearing Agency. Now in-transit for delivery.
Incheon, Korea, Republic of 04/21/2011 10:35 A.M. Departure Scan
04/21/2011 8:54 A.M. Arrival Scan
Shanghai, China 04/21/2011 5:59 A.M. Departure Scan
Koeln, Germany 04/20/2011 8:39 P.M. Package data processed by brokerage. Waiting for clearance.
Shanghai, China 04/20/2011 9:45 P.M. Export Scan
04/20/2011 9:32 P.M. Hub Scan
China 04/20/2011 8:45 A.M. Order Processed: Ready for UPS -
-
I got my unit in 8 days! Just got it at 11:30am today!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
3d gaming 3d movies awwwwwwwwww yeaaaaaaaaaaaaaaaaaaaaa -
Castle Donnington, United Kingdom 04/22/2011 3:56 A.M. Arrival Scan
Can't wait till Tuesday! -
Mine has said Ship Complete since Saturday. When I click on the order number it says Finalizing Production. I think it's just waiting for someone to pick it up for delivery. I hope they give to the shipping company soon. Does anyone know if they use someone specific? I hope it's UPS, the UPS guy always comes after I'm off work and I assume I'll have to sign.
-
-
Shipped! Yes! FedEx says the delivery date is 4/27, that's much better than the 5/5 estimate that Dell quotes. I ordered it 4/17, not a bad turn around time. Hopefully I'll be around to sign it, otherwise I'll be making a trip to their depot.
-
im really thinking of purchasing this laptop. should i opt for the 540m vs the 525m? i've read over and over that its not worth it, but want to pose the question out there for you users? any regrets not getting the 540M? i will be getting the high res screen.
-
Joining in the Fun :
2nd generation Intel Core i5-2540M processor
15.6" FHD B+RGLED True-Life (1920x1080) with 2.0 Mega Pixel Integrated Camera
4GB (2X2GB) 1333MHz DDR3 Dual Channel
500GB Serial ATA (7200RPM)
Tray Load Blu-ray Disc BD-Combo
Primary 6-cell 56W/HR LI-ION
2GB NVIDIA GeForce GT 540M Graphics card
Internal DVB-T TvTuner
Europe Intel Centrino Wireless-N 1030 (1x2 b/g/n+ Bluetooth Combo Card)
Internal Backlit UK/Irish Qwerty Keyboard
Genuine Windows 7 SP1 Home Premium (64 BIT)
3 Year Hardware Support - Next Business Day
Ordered today, Estimated Delivery Date: 09/05/2011
Couldn't find anything of better value for this price. -
Received today as per UPS's estimate.
It's mind blowing, the screen, the speakers, the speed...really worth it
I've updated http://forum.notebookreview.com/del...92-dell-xps-15-r2-l502x-owners-lounge-76.html with my first impressions.
Hope yours arrived OK AK! -
Naveen_Reloaded Notebook Consultant
Current Status: Work In Progress
Since the main Dell plant is here in sri perumbadur , chennai ... i hope the laptop is delivered quickly -
I ordered it on 1st April anf got it on 18th April.
Seriously guys it's a very high end laptop , sound , screen and evrything is awesome. High end games runs so smoothly on high settings. But i'm facing issues with old games like NFS MW which do not offer more than 1024*768 , game just scales to middle of screen leaving two black bars. Nvdia 540 M Gt do offer display tab in control panel. This is something fishy. Nvdia has recetly launched new drivers for 540 M , today i'll install those. Hope it works. Fingers crossed -
-
On the bright side, I'll bet your computer is going to look totally awesome with the professional studio design. Keep us posted and let us know what it looks like when you receive it. -
Hi guys,
I bought an L502x from Dell Canada with 12 months no interest.
Order Date: 4/16/2011
Estimated Delivery Date: 5/5/2011
Guessing that it would come from the US, for a 5-7 business days shipping, my laptop should be in 'Shipped Status' by April 27-28, right?
Should I wait 'til like end of April to bother them about my order? Or this is normal for Dell Canada. Thanks! -
Just an FYI:
I ordered an L702x but my experience might help L502x orders. I ordered on 4/15 and recieved 4/25. My estimated ship date was 5/2 and estimated delivery date was 5/5. I called up order support on 4/22 to ask about some part delays and the Dell rep checked the status of my build. He told me that my system had already been boxed up and ready to ship since 4/20 and then asked if he had my permission to ship early. Of course I said yes. It was shipped from Chicago to a downtown Chicago address. -
-
Hey Hey! My order arrived!!
This thing is awesome, I don't play online games, just normal stuff and some music recording. The screen blows my mind. Must have to be elderly or poor eyesight to complain about the text size. Oh and my digital photos look so amazing on it.
Love the keyboard, and the metallic feeling of where I rest my palms when typing. My only complaint so far is that the mouse buttons (not a mouse but whatever they are called below the touch pad) click a little too soft for my preferences. I would like them a little stiffer.
I'm an audiophile so I also ordered some external speakers, but I was very surprised at how good the included speakers sound.
Ordered late evening 4/15/11, EDD of 5/4/2011 at that time. Shipped 4/25 from somewhere in Chicago. Arrived 4/26 downtown Chicago. -
Order Status: In Production
-
Naveen_Reloaded Notebook Consultant
Current Status: Manufacturing build completed
Estimate Delivery Date: 06-May-2011
-
Placed order on 4/16
Arrived today , 4/29 -
Dell Canada
Order Date: 4/16/2011
Order Status: In Production
Shipping Method: Canada Standard
Estimated Delivery Date: 5/5/2011
I just called a customer rep about my l502x order and she told me that it's still in the manufacturing process...she added that a rep will be monitoring my order for the status. -
Well, I can't quite believe it, but :
Order Status: Shipped
I ordered 26/04, Shipped 29/04 -
Ordered: 4/24
EDD: 5/9
Status: In Production / Ship Complete
I'm guessing my xps is preparing to leave the factory, hope it come in by Friday! -
Should I be worried; is the QA the same no matter where the item ships from; will I get all genuine parts, etc.; I will need to check this machine out v. carefully before saying that this order is complete (my last XPS had a HDD error which took a while to fix).
Does anyone have an experience of Dell Laptops from Singapore?
Thanks, Greg. -
I live in the UK and mine came from China. Build quality and condition was brilliant. If there's any problems, just get in touch with them.
-
Order Date: 4/27
Status: Ship Complete
EDD: 5/12
Does anyone know if a signature is required? -
I called in today, didn't have to wait in line for customer service. The guy was nice although based on his accent I'd assume he's from a different continent.
Order date: 04/21
EDD: 05/06
I asked the CS rep why my laptop was still "in production", he told me that there was a slight delay however he wouldn't give me the details as to why.
He said it was in the final stages of production (boxing?) and that my laptop is currently in the US. He told me that the latest I should get my laptop would be around June 1st, however I most likely will get it before then.
I really hope I get it soon, I'm sooo excited. -
-
Yes they said there was a delay and that the latest I could get it would be June 1st....
-
-
Naveen_Reloaded Notebook Consultant
got my laptop yesterday..
Order date 29/4
delivered date 3/5
pretty neat.. -
Spec: 15.6" 1366x768 Screen (who needs HD on such a small size), i7 2GHz CPU, Design Studio Red cover (nice), Driver DVDs, 8GB RAM, 500GB (7,200rpm) HDD - no SSD avail., DVD (but will replace with an SSD), 6 cell battery (they all die anyway), 1GB Graphics card (v. little diff. for the more exp. version & I don't play games), US keybaord, etc., was shipped from Singapore to Switzerland. Total cost $1.1K
Am busy setting up & testing, but seems OK so far...
Later will add external x12 Blu-Ray Burner, 120GB SSD to replace the HDD & move this to the DVD optical drive bay using a caddy, then throw away the DVD.
Cheers, Greg. -
-
Hi guys. My status order hasn't changed still. And my EDD is 5/5.
Anybody from Canada who ordered an XPS 15 l502x with specs close to mine; ordered by April 16 or later and got their laptop already? -
i7 2630
8GB
750GB 7200rpm
525GT 1gb
1366x768
no blueray
My EDD is 06/05/11 but I called in and they said there were delays so its been pushed. -
I just called customer service this afternoon. I was complaining how my laptop hasn't been shipped yet (2 days till EDD). So he told me it was in its final phase of production and then he kept going...I honestly, didn't understand much of what he was talking about ( I mean, no offense English is not my 1st language as well)...But I heard phrases like, 'core manager', 'trying their best', 'monitoring' but didn't hear anything about 'delays' though. He then told me that originally my EDD has been moved to May 27! But then he added that since my laptop is almost done I should expect it to be shipped in 3 business days.
Then I checked my status page and it has been 'Shipped'. I have my tracking number but no details on it yet, only a note: PLEASE CALL 1 888 SHIP-123 OR 1-888-744-7123 FOR INFORMATION ON THIS SHIPMENT.
I'll wait till tomorrow, if my tracking details haven't changed, I'll give them Purolator a call.
Lesson for me: If I want my order to move you have to call them and check the status yourself. -
I was surprised that my overall score was not over 7, as I have a year old iMac with roughly the same spec that can score this high. Anyone else have unusual values in their Win. Exp. Rating, or can confirm the Seagate HD score? Just shows the need for an SSD...
Thanks, Greg. -
I've installed a SSD in mine so my WEI HD score is 7.7. Didn't check what the 640GB Stock Toshiba 7200rpm scored, but the maximum any mechanical hard drive can score is 5.9 (maybe the 15krpm drives score a tad more) so 5.7 isn't awful.
WEI will always give an overall score of the lowest scoring component.
I got 5.7 for my Intel graphics and 6.7 for the Nvidia graphics. -
I just checked my order status yesterday, it changed to "Delivery preparation" half way through the day, and within two hours it changed to "Shipped"
I called in to Purolator to check where it was since the tracking code wouldn't work online and the rep said it was shipping from Austin, Texas so I should probably get it within 4 days or so. I'm happy. =] -
Mine has shipped and yesterday was "on vehicle for delivery". As of this morning it's still "on vehicle for delivery"!
-
2nd generation Intel Core i7-2630QM processor 2.00 GHz with Turbo Boost 2.0 up to 2.90 GHz
4GB,DDR3,2 DIMM
Backlit Internal Keyboard - Spanish
15.6FHD TLF B+RGLED LCD L50xX
NVIDIA GeForce GT540M 2GB graphics with Optimus
500GB 7200 RPM SATA Hard Drive
8X Tray Load CD/DVD Burner (Dual Layer DVD+/-R Drive)
Intel Centrino Advanced-N 6230 and Bluetooth 3.0
90 WHr 9-cell Lithium Ion Primary Battery
Order date: 05/05
Status: in production.
Estimated Time of Embarking (ETE??): 5/25
ETA: 6/08 to 6/15 -
Actualization!
Order date: 05/06Status: Shipped.ETA: 5/30 to 6/06[/QUOTE]
One week earlier... nice
-
Ordered my xps 15 last Thursday and it was delivered today! The eta was 5/27 so 10 days early. Kudos to you Dell!!
-
just ordered mine...arriving june 1st...
Quantity Item Number Description
1 225-0675 XPS 15
1 317-6409 2nd generation Intel Core i7-2720QM processor 2.20 GHz with Turbo Boost 2.0 up to 3.30 GHz
1 317-6415 8GB,DDR3,2 DIMM
1 331-1668 Backlit Internal Keyboard - English
1 320-1673 15.6FHD TLF B+RGLED LCD L50xX
1 421-3874 Camera Software 2.X, Factory Install
1 421-3642 Basic Stage
1 320-2118 NVIDIA GeForce GT 525M 1GB graphics with Optimus
1 342-2369 500GB 7200 RPM SATA Hard Drive
1 318-0490 Elemental Silver Aluminum (WLAN)
1 420-6576 DELL WELCOME,Software Dimension/Inspiron
1 420-9691 DataSafe Local BackUp
1 420-6436 PC-Restore, Dim/Insp
1 330-6222 Windows 7 Label
1 421-1737 Genuine Windows 7 Home Premium, 64bit, English
1 421-0092 DELL-DOWNLOAD-FLAG
1 420-9876 Cozi-Calendar
1 421-2086 eBay Webslice
1 421-0757 Skype VOIP Application
1 421-4118 WHITEPAGES.COM,Webslice
1 421-4289 Dell Support Center Software 3.0
1 318-0392 Windows Live Wave 4
1 331-1674 Resource DVD (L502X)
1 430-4038 Integrated 10/100/1000 Network Card
1 410-1883 Adobe Acrobat Reader 9.0 Multi-Language
1 318-0151 Tray Load Blu-ray Disc BD-Combo (Reads BD and Writes to DVD/CD)
1 421-4550 Power DVD 9.6, 3D
1 421-4838 Roxio Creator 2011, Upsell
1 318-0431 Creative SoundBlaster X-FI MB 1.2
1 430-4048 Intel Centrino Advanced-N 6230 and Bluetooth 3.0
1 421-4736 Wireless Display Software
1 410-9453 McAfee Platinum, 15 Month, MUI
1 312-1186 90 WHr 9-cell Lithium Ion Primary Battery
1 410-0487 Microsoft Office Starter: reduced-functionality Word and Excel with ads. No PowerPoint or Outlook
1 939-4850 Dell Hardware Limited Warranty, Extended Year
1 939-4860 Dell Hardware Limited Warranty, Initial Year
1 939-4880 Dell Limited Hardware Warranty Plus In-Home Service After Remote Diagnosis, 1 Year Extended
1 939-4870 Dell Limited Hardware Warranty Plus In-Home Service After Remote Diagnosis, Initial Year
1 950-3338 2 Year Limited Warranty
1 987-5271 Accidental Damage Service, 2 Years
1 412-0358 Soft Contracts Consumer Accidental Damage Agreement
1 420-8878 Soft Contracts Dell In-Home Hardware Agreement
1 925-4561 Warranty Support, 1 Year Extended
1 933-0410 Warranty Support, Initial Year
1 988-0099 To activate your online backupaccount, go to Start, Programs, DataSafe Online
1 927-2357 DataSafe Online 2.0 2GB
1 421-4356 Software, DataSafe Online 2.0 2GB
1 330-0171 S and P Drop-in-Box Marcom forDHS Notebooks
1 430-3893 No Mobile Broadband L501X
1 421-4600 Recovery DVD for Windows 7 Home Premium OS, 64bit, English -
Just ordered mine, the email says expected delivery Jun. 6.
225-0675 XPS L502X (Direct) 1 $1,315.74
312-1185 56 WHr 6-cell Lithium Ion Batt (L502X) 1
317-6408 Intel Core i7-2630QM 2.00 GHz 1
317-6414 6GB,DDR3,2 DIMM, 1333MHz (L502X) 1
318-0138 JBL 2.1 Speakers with Waves Maxx Audio 3 1
318-0392 Windows Live Wave 4, CNB 1
318-0434 Roxio Creator Starter, FI, CNB 1
318-0490 Elemental Silver Aluminum (WLAN) L502X 1
318-1064 Blu-Ray RE Drive, CNB 1
320-1673 15.6FHD TLF B+RGLED LCD L50xX 1
320-2118 NVIDIA GeForce GT 525M 1GB US (L502X) 1
330-6222 Windows 7 OS Label,CNB 1
331-1668 Backlit Internal Keyboard - Eng (L502X) 1
331-1674 Resource DVD (L502X) 1
342-2370 750GB 7200 RPM SATA Hard Drive (L502X) 1
410-0487 MICROSOFT OFFICE STARTER 2010,CNB 1
410-0548 ADOBE ACROBAT X READER MLANG,CNB 1
410-9453 McAfee Platinum, 15 Month, MUI, CNB 1
420-6436 PC-RESTORE, DIM/INSP 1
420-6576 DELL WELCOME,SW,DIM/INSP 1
420-9691 DATASAFE LOCAL BACKUP 1
420-9876 COZI-CALENDAR,INB 1
421-0092 DELL-DOWNLOAD-FLAG 1
421-0757 SKYPE VOIP SOFTWARE APPLICATION,CNB 1
421-1737 WIN 7 HOME PREM, 64, ENG,S/XNB 1
421-2086 EBAY-WEBSLICE, CNB 1
421-3642 Basic Stage, CNB 1
421-3874 Camera Software 2.X, Factory Install,CNB 1
421-4289 DELL SPRT-CTR SW 3.0 1
421-4550 Power DVD 9.6, 3D, CNB 1
421-4736 Wireless Display Software (L502X) 1
430-4038 INTEGRATED NIC 1
430-4048 Intel WLAN-N 6230 and BT 3.0 (L502X) 1
920-5070 XPS WARRANTY SPRT, INSPIRON, INIT YR,CA 1
931-0791 HW WRTY + SVC,XPS L502X,SOL,INIT,CA 1
931-0811 RTD,XPS L502X,SOL,INIT,CA 1
931-0801 HW WRTY + SVC,XPS L502X,SOL,EXT,CA 1
931-0831 RTD,XPS L502X,SOL,2YR EXT,CA 1
960-3652 XPS WARRANTY SPRT, INSPIRON, 2 YR EXT 1
009-6800 SHIPPING FEE 1
430-3893 No Mobile Broadband L501X 1
600-0043 ON EHF $2.75 NOTEBOOK 1 -
order finally shipped!
Dell XPS 15 (L502X) - Order Progress
Discussion in 'Dell XPS and Studio XPS' started by Rossi77, Apr 10, 2011.