Yes... we should band together ... DELL's manufacturing process is our real enemy!
-
-
the year is 2669, february 2nd.
sounds like something out of startreck -
-
-
lmao -
Sorry all!!! I didnt mean to start a point of contention. Yes, our date is a bit diff...but thats not the point I was trying to put forward.
-
-
I'm still in pre-production, ordered 6/29. I got a great deal (almost 30% off) with the exact specs I wanted, but if it doesn't ship until end of August (or gets cancelled), I will seriously consider getting a SZ6 instead. Now that the SZ will have PC-5300 RAM and 7200rpm HD support, it is almost neck-and-neck with the M1330. I really like the fact the SZ has gigabit ethernet and a port replicator, not to mention the hybrid graphics. Too bad the SZ doesn't officially support Intel Turbo Memory or SSD's.
-
I was taught never to write dates on technical documents as MM/DD/YYYY but always as DD-Month-YYYY or something like that. Eliminates confusion if you are working with someone from another country. I sometimes forget and write dates on signed documents as DD/MM/YY which leads to total confusion when they think I said today was the 7th of the 13th month.
-
not to mention the sz6 has no hdmi port and no led screen.
-
-
-
The problems comes when you have 7th of the 9th.
-
An inspiring fusion of mobility, power and style, the VAIO® SZ Notebook delivers intelligent mobile design while placing a priority on usability and performance. This slim, lightweight PC measures a mere 1" thin17, with a superb 13.3" widescreen display11 with XBRITE LCD technology, long battery life7 and a generous, comfortable keyboard. And with its durable carbon fiber casing, the VAIO SZ Notebook is the portrait of sleek, contemporary style.
Notice it says LCD at leaset thats what im seeing dont know if its a separate option just going based on what m seeing. -
A lot of people get confused by this: Whether or not it says LCD has nothing to do about whether the screen uses LED or CCFL backlighting. If you think of a stained glass window, the LCD is like the glass, except here it can change color. The LED and CCFL systems are like the sun shining through the glass, they just provide white light so that you can see what color the stained glass (LCD) is. -
-
Scroll down to "Xbrite" and "More Realistic Colors" sub-heading. I hope this will put at rest any doubts as to whether SZs offer LED-backlit LCD screens or not.
SZ6-proper link: http://b2b.sony.com/Solutions/product/VGN-SZ680+Build-to-Order+Series -
Has anyone's order status changed from "in production" to "build" online, and not just by checking over the phone? Has anyone actually talked to customer service about the status of their order and been confirmed that it is in the "build stage"? -
Where are you checking? To see the "Build/testing/etc" phases, you have to have the order displayed on the My Account page... NOT the order status page itself.
-
It seems that the quality of the support people varies greatly, hopefully you just got a bad support person and you system really is in the build phase. -
Just checked my status over the phone and its now in the build stage! Woo!
I ordered it on 7/13 so I am surprised it is already in the build stage.
Now my online status says in production, so has anyone found out which one is correct? -
Did you get an email from Dell saying that your order has moved to the "build" stage? Or was it just via the phone?
Edit: I cancelled my order twice, due to the in ability to make up my mind on the specs I wanted to pay for and had my order delayed now until September 6th, 2007.
m1330 Features
Processor: T7100
Memory: 2GB @ 667 MHz
Hard Drive: 160 GB @ 7200 RPM
Video: NVidia GeForce 8400 GS
Wireless: Intel 3945 WLAN (802.11a/g) Mini Card
Battery: 6-Cell (56WHr)
Additional Stuff
Fingerprint Reader
Bluetooth
Soundblaster Audigy -
-
-
I called 12 hours ago and it wa still in pre-production. I just called and it says my order is now in production and in the BUILD STAGE, however my ship date of July 29th has not changed. I ordered June 27th 3pm
-
-
-
I ordered my m1330 on the 28th and got my confirmation on the 30th. Still in "pre-production" for me. I got in on the original drake deal though. Did anyone who got their Drake deals actually go "in production-building" stage already?
-
For all of us who are waiting... here is a pretty good post on another forum.
http://www.notebookforums.com/thread85821.html
(can i do that? just wanna give credit where credit is due and not hijack his post). Anyways, gives a pretty good explanation of the dell process and what steps your laptop goes through from order to delivery.
I am also anxiously waiting for my m1330, and have been combing this thread for the last couple weeks.
LED display
wi-fi n
t7300
webcam
bluetooth
fingerprint
order 7/6 est delivery 8/26
Build Stage.
I'm kind of thinking they bumped everybody to build stage to shut us all up lol, even though our parts are still backordered. Thats just a gut feeling, i hope i'm wrong. -
-
I have a ship date of september 5th, but since I went into build today...think there is a chance I will get it a few days early?
-
Yes, more likely than not.
-
you think if you call often enought o check your status the system flags you and they notice so they bump your order because you are obviously concerned about the ship date and they don't want you to cancel!? i think this is a good conspiracy theory, i am going to call 10 times a day instead of 4... lol
-
good answer....gooooood answer haha...Im just so excited...this is the most expensive thing I have bought to date ($2000 in college = lots of beer so it was hard to let go, haha) and its just eating me that its so far away to getting it
-
11 Days till scheduled delivery, still in pre-production.
-
-
-
my order is finally in the build stage
-
Welcome to the club! Now... we await for those people to get OUT of build!!!
I was reading this...
http://www.notebookforums.com/thread85821.html
... and it seems like the build stage was only five hours!!! LOL... Of course... it doesn't seem like the case here. -
-
"We know where every part in every SLC is in the Dell system at all times," said Hunter.
So why can't they give us a more detailed tracking system?? -
Just a guess... -
Does anyone have an idea on what the "Icon Consolidation Application" item is on the list of parts for the m1330 laptop actually does? I plan on wiping all the crap-ware that is preloaded on it.
-
I think it's like... a launcher that gives a popup of other applications. It's literally that - it consolidates icons on the desktop into an application.
-
-
blahdude -
Not really, would work wonder on connecting to external monitors. -
Since this seems the case, its on my list of apps to uninstall. I'm still contemplating about the McAfee Anti-Virus though, as when I configured my laptop it says the first 15 months are free. Avast Home Edition or AVG Free Edition are both excellent replacements.
If you have tried both Avast and AVG, which one do you prefer? I'm liking Avast, as that has a plug-in for Outlook. -
I've always liked mcafee. IMO, its just a well rounded program. Yes its a bit bloated, but it does get the job done very well. and for free you cant complain
-
Ive been using AVG for years and I swear by it...
1. Free
2. Doesnt use up precious memory
3. Downloads updates regularly
4. No maintenance required -
Post when XPS M1330 ordered and when/if shipped
Discussion in 'Dell' started by trebuin, Jul 1, 2007.