I googled similar situations, a delay of 1 or more days looks pretty common. I don't expect mine to arrive tomorrow. Hopefully Friday because otherwise, I'll have to wait until next week.
-
-
probably not :/
im stuck in the same situation at the moment. hopefully itll come tomorrow. -
I have this...
Louisville, KY, United States 05/11/2011 2:34 P.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/11/2011 11:58 A.M. Import Scan
05/11/2011 11:34 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/11/2011 1:27 A.M. Arrival Scan
seems to be the same thing, but I have import scan between the two "warehouse entry..etc" things. Maybe that Import Scan means it cleared customs? But there there is another "Warehouse entry clearance details..." Not sure what that line means. The top of the page still says exception, but the scheduled delivery says tomorrow, Thursday.
Hope it comes tomorrow. What does the scan say once it has cleared customs? -
-
-
My status has changed to HELD IN WAREHOUSE.
Bull crap. -
I'm pissed. -
-
-
My non tablet one has a ship date of 6/3 estimation ... oooooft. ordered 2 days ago.
-
-
It really sucks though. You wait so long as it is for the machines to get built and then shipped from flipping shanghai, the LEAST Lenovo could do is to make sure their electronic invoice submission process is reliable.
I am assuming this is where the breakdown is based on past posts from people who have been through this.
I used to go to this sandwich shop near here where they make your sub fresh and you can see the people making the sandwiches. But when the sandwich is made they put it on a shelf where person X needs to grab it from when then say "order up!" and 9 times out of ten the guy is taking orders on the phone or from customers in line and my sandwich sits there with me starving waiting....waiting....
I don't go there anymore. -
Just to chime in,
Ordered: April 29, 2011
Shipped: May 6, 2011
Received: May 10, 2011 in Toronto, Ontario Canada.
Good turn around here. It was an I7 with IPS screen and most bells and whistles with only 2GB memory (that I replaced) and the standard 250GB hard drive (that I replaced with my SSD drive).
Sorry for those waiting but sometimes they do deliver quicker than they say (it was supposed to ship in 17 business days but it shipped in 6 business days). -
was it at least a good sandwich?
-
sorry for the rant, but I can just visualize a poorly run IT department where a disconnect takes place @ Lenovo and causes massive frustration for hundreds of customers.
I hope I am wrong and our packages start moving, but we'll see. -
Oops! EAting my words and not a sandwich now....
Louisville, KY, United States 05/12/2011 10:43 A.M. Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 10:42 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver. / Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 1:03 A.M. Import Scan
Louisville, KY, United States 05/11/2011 2:34 P.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/11/2011 11:39 A.M. Import Scan
05/11/2011 11:34 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
Louisville, KY, United States 05/10/2011 9:40 A.M. Arrival Scan
Anchorage, AK, United States 05/09/2011 11:27 P.M. Departure Scan
05/09/2011 1:49 P.M. Arrival Scan
Shanghai, China 05/09/2011 9:03 P.M. Departure Scan
05/09/2011 7:06 P.M. Export Scan
05/09/2011 6:58 P.M. Origin Scan
China 05/09/2011 3:38 A.M. Order Processed: Ready for UPS -
My shipment just changed to:
Last edited by a moderator: May 7, 2015 -
-
Mine just went back to Exception status after being Released by clearance agency:
Louisville, KY, United States 05/12/2011 11:15 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/12/2011 11:14 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/12/2011 10:43 A.M. Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 10:40 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver. / Released by Clearing Agency. Now in-transit for delivery.
-
Mine too. Meaningless...
-
-
-
UPS is probably watching this thread and messing with us.
Like the "messing with sasquatch" commercials. -
05/12/2011 1:13 P.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver. / Released by Clearing Agency. Now in-transit for delivery. -
I detect movement!
Says in transit again. Hey I hit 100 POSTS! Half are in this thread of course. -
mine's out for delivery. lucky me?
-
-
no change of status, still held at ups lousiville
-
-
Ordered an x220 Tablet through the epp site on 4/23, had a scheduled ship date of 5/18, received a notification of a delay yesterday, and a notification of shipment today, 5/12. They are just teasing us.
i3
4GB RAM (1dimm)
multitouch screen
no bluetooth, webcam or fingerprint reader
basic networking -
just got an update from Cost Central customer service that my X220T has been shipped! yay!! there's no info on the tracking/shipping button yet though.
-
I'm certainly fine with a delay (the package stayed at louisville for 3 full days) at customs as long as it arrives before the weekend. My status is green ("clearance completed") with a scheduled delivery for tomorrow to Washington DC.
Louisville, KY, United States
05/12/2011 1:13 P.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver. / Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 11:15 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/12/2011 11:14 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/12/2011 10:43 A.M. Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 10:41 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver. / Released by Clearing Agency. Now in-transit for delivery.
05/11/2011 2:34 P.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/11/2011 2:33 P.M. Import Scan
05/11/2011 11:34 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/10/2011 9:40 A.M. Arrival Scan
Anchorage, AK, United States
05/09/2011 11:27 P.M. Departure Scan
05/09/2011 1:49 P.M. Arrival Scan
Shanghai, China
05/09/2011 9:03 P.M. Departure Scan
05/09/2011 5:22 P.M. Export Scan
05/09/2011 5:22 P.M. Origin Scan
China 05/09/2011 3:38 A.M. Order Processed: Ready for UPS -
-
As excited as I am to hear that it's being shipped today, I remain very skeptical until it arrives at my house. Especially considering the online tracking isn't working yet. -
I placed my order on 5/2, got my shipping notice on 5/6, and UPS tracking says it will be delivered today (5/12). Some part shortages are probably causing delays. (I'm guessing battery and IPS 3x3 screen).
-
-
I order the same thing from CostCentral on 4/19 and still no update. Weak sauce!
-
-
I'm calling a bluff on anyone getting a shipment from CostCentral. Just spoke with the rep again and its now further delayed to 5/26. ALL orders for this model are being delayed as they have not yet started manufacturing them (still).
-
Mine has green Clearance completed at top and says it will be delivered tomorrow.....my stuff all seems the same as everyone else. Hope it leaves there soon and makes it to me tomorrow!
Not sure why it was released at 10:43am and then went through some requests again and then released again at 1:13pm. I hope it is actually through customs now and really on its way...
Updated:05/12/2011 4:54 P.M.Eastern Time
Clearance Completed
Business
Day(s) Left1
Scheduled Delivery Updated To:
Friday,05/13/2011,By End of Day
Last Location:
Louisville, KY, United States, Thursday,05/12/2011
Additional Information
Product:WORLD EASE
Shipment Progress
Location Date Local Time ActivityWhat's This?
Louisville, KY, United States 05/12/2011 1:13 P.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver. / Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 11:16 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/12/2011 11:14 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/12/2011 10:43 A.M. Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 10:41 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver. / Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 12:52 A.M. Import Scan
Louisville, KY, United States 05/11/2011 2:34 P.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/11/2011 11:58 A.M. Import Scan
05/11/2011 11:34 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/11/2011 1:27 A.M. Arrival Scan
Anchorage, AK, United States 05/10/2011 3:21 P.M. Departure Scan
05/10/2011 1:27 P.M. Arrival Scan
Shanghai, China 05/10/2011 8:57 P.M. Departure Scan
Shanghai, China 05/09/2011 6:15 P.M. Export Scan
05/09/2011 5:21 P.M. Origin Scan
China 05/09/2011 3:38 A.M. Order Processed: Ready for UPS
Shipped By
UPS Worldwide Expedited -
I think the delivery will be next monday -
why do you think that?
i have the same thing:
"Friday, 05/13/2011, By End of Day" -
stackPointer2.0 Notebook Consultant
Mine also now says "Clearance Completed" at the top and it says to be delivered by end of day Friday. Looking at the history though, you can see that it gets cleared and somehow goes back to customs. It makes absolutely no sense.
I've found that Lenovo always has this problem every year, don't those idiots ever learn to be a bit more organized? Last year some people had their laptops delayed by more than a week. I really hope mine is actually in transit now as it says.
-
Thanks to forum poster Shayes, there is a good deal currently going at the Mastercard Marketplace site for the X220.
Note: you do not need to have a Mastercard.
I was able to buy at $400 less than the the normal Lenovo.com price.
Here is what I did:
1. Went to the Mastercard Marketplace site.
2. Signed up (Entered an email address)
3. Searched for 'Lenovo'
4. Clicked their Lenovo link. Discovered that I was now at the Lenovo Employee Discount site. (The prices are now already reduced.)
5. Noted all of the coupon codes that I was shown throughout this process.
6. Configured my laptop.
7. Entered the four different coupon codes that I was given, and chose the best deal.
I got:
Intel Core i7-2620M Processor (2.7GHz, 4MB L3, 1333MHz FSB) USB 3.0
Genuine Windows 7 Professional 64
12.5" Premium HD (1366x768) LED Backlit Display
2x2 Antenna
4 GB DDR3 - 1333MHz (1 DIMM)
No Fingerprint Reader
720p HD Camera
320 GB Hard Disk Drive, 7200rpm
No Micro Solid State Drive
ThinkPad Battery 29+ (6 cell)
Intel Centrino Advanced-N 6205 (2x2 AGN)
If I configure this through Lenovo.com, the price comes to $1,455.
Through the Mastercard site, it came to $1,080
To be shipped on June 3rd. -
I hope it will leave Louisville tonight. I doubt it though - nothing happened since 13:13 Eastern time.
05/12/2011 1:13 P.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver. / Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 11:15 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/12/2011 11:14 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/12/2011 10:43 A.M. Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 10:41 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver. / Released by Clearing Agency. Now in-transit for delivery.
05/12/2011 1:32 A.M. Import Scan
Louisville, KY, United States 05/11/2011 2:34 P.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver.
05/11/2011 12:01 P.M. Import Scan
05/11/2011 11:34 A.M. Warehouse entry clearance details, necessary for customs clearance, have been requested from the receiver -
She emailed me in an under an hour saying "Hello, Your X220 will be shipping out today. Thank You"
I assumed she was just abbreviating X220 tablet. She clearly had the right order # to have emailed me back without asking for my email address on the phone. She may have seen the words "X220" on my order and forgotten to search for the tablet version. I don't know. -
So I ordered an x220 on the 7th, and my money was taken from the bank account immediately (on pending) but today I checked and the pending status was gone. It's like my money was refunded or something? Has this happened to you guys? My shipping date is still set for 6/1 on the website.
-
FYI
Just placed my order using the MasterCard coupon. Configuration is below.
Order Date: May 12th, 2011
Estimated Ship date: June 6th, 2011
0A69628 SBB INTEL CORE I5-2540M PROC
45M3092 VBB GENWIN7HOMEPREM64
0A59833 SBB GEN WIN7 HOME PRM64 EN
0A69642 SBB 12.5PRMHDLDBCLTDPYMBBBRDAN
45M4571 VBB 4GBPC3-10600DDR3 1333SODMM
45M4839 SBB KEYBOARDUS ENGLISH
0A69644 SBB NO FINGERPRINT READER
0A69657 SBB CAMERA, HD 720P
0A69650 SBB 250GB HRDDSK DRV,5400RPM
0A68287 SBB NO MSSDRIVE
0A69646 SBB TP BATTERY 29+(6CELL)
41W1787 SBB CPK NORTH AMERICA
0A68255 SBB IC ADVN 6205 2X2AGN
44C7950 SBB INT WRLSSWDAREANTWRK UPGR
0A69659 SBB LANGUAGE PACK US ENGLISH -
Yea, shop.lenovo.com seems to be a disaster today. The site (lenovo.com) is extremely slow, but shop.lenovo.com is down totally. You can enter an order in a cart, but it will time out trying to go to any of the 3 payment methods. And of course everyone in China or Lexington or wherever is asleep.
question Zondaz? How did you get the camera? The website only has a choice of "no camera."
Perry
Edit: I also tried the Mastercard Marketplace. That was up and I got my discount code but when it tried to take me to the shop.lenovo.com page it was indeed down from that direction also. So Lenovo is dead in the water today and tonite.
ThinkPad X220 Info/Ordering/Shipping Thread
Discussion in 'Lenovo' started by viggo, Apr 7, 2011.